Loading...
HomeMy WebLinkAboutSW3190802_Transmittal 02_11/12/2019P I I I I UlrrE�= ENGINEERING 123 North White Street, Fort Mill, SC 29715 DATE: November 11, 2019 TO: NC DEMLR-Stormwater %Corey Anen 512 North Salisbury Street 640-K Raleigh, NC 27604 (919) 707-3649 Distribution: Record PROJECT NAME: Trinity Substation The Following is Transmitted: [ X ] Attached [ ] Under Separate Cover [ ] For Bid [ ] For Review and comments [ ] For Correction and Resubmittal ITEM DESCRIPTION QTY 1 Design/Construction plans — revised sheets only 2 2 Stormwater calculations — revised and new calculations only 1 3 DEMLR supplemental Level Spreader Operation & Maintenance Agreement 2 [X] Normal Procedure [ ] Your Letter [ ] Your Telegram or Fax [ ] Telephone Request REMARKS: Attached are the hard copies I promised you. Please call me if you have any questions or concerns. David Sherrill at 704-578-4017 or dsherrill pike.com. PREPARED BY: DDS