Loading...
HomeMy WebLinkAbout20091113 Ver 1_401 Application_20091009?? .,Irk. r ?cl?r? ? ? "??t?r?r? s ?? Corastrvc#ion Residential Cornmercial 252-728-5441 phone 252-728-2501 fax NC Ucens 35688 adavisconstrrtctizan@ec.rr.rr:)rr, October 16, 2009 US Army Corps of Engineers Attention: Mickey Sugg 69 Darlington Avenue Wilmington, NC 28403 Attention: Mickey Sugg 508 Dancer Court. Beaufort, NC 28516 f: URTES Y Clop ( Please find enclosed the Pre-Construction Notification (PCN) form for 113 Sandy Huss Drive in Beaufort, NC. Also enclosed are the survey and the authorization letter from the owner, Gerald Holt. This packet is also being sent to the Division of Water Quality. Please contact me if you have any questions; I can be reached at the above office number or on my cell phone at (252)241-1199. Thank you, amij? - Archie Davis Cc: Ian McMillan NCDWQ 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 U 0 C T 1 9 2009 s?ro STORMWA7F t &WCH 71171 --1113 W AATF p? O Nii? --c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing o 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit COPY 1 b. Specify Nationwide Permit (NWP) number: NWP18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ®Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Holt Residence 2b. County: Carteret 2c. Nearest municipality / town: Beaufort 2d. Subdivision name: Hidden Harbor 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: rER Gerald and Patricia Holt WETLANDS ANDSTO R 3b. Deed Book and Page No. Book 938 page 584 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 113 Sandy Huss Drive 3e. City, state, zip: Beaufort, North Carolina 28516 3f. Telephone no.: 301-855-0157 3g. Fax no.: n/a 3h. Email address: na Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: Archie Davis 4c. Business name (if applicable): Archie Davis Construction 4d. Street address: 608 Dancer Court 4e. City, state, zip: Beaufort NC 28516 4f. Telephone no.: 252-728-5441 or 252-241-1199 4g. Fax no.: 252-728-2601 4h. Email address: adavisconstruction@ec.rr.com 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 649402978590000 1 b. Site coordinates (in decimal degrees): Latitude: 34.574200 Longitude: - 76.39856 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: .596 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Sandy Huss Creek proposed project: 2b. Water Quality Classification of nearest receiving water: SA HQW NWS 2c. River basin: Nuese 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is located in the residential subdivision of Hidden Harbor. The adjacent lots have homes built upon them. The lot for which the permit is being applied for has trees and some undergowth. A portion of the lot currently has standing water due to the fact that the developed adjacent properties drain onto this property. The water frequently stands on this lot because of a sandy ridge at the edge of the creek does not allow heavy rains to drain off. 3b. List the total estimated acreage of all existing wetlands on the property: .28 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 97' of coastal marsh on the shoreline 3d. Explain the purpose of the proposed project: Single family residence 3e. Describe the overall project in detail, including the type of equipment to be used: Build a single family home. Equipment used will be dozer and excavator for clearing and installation of the building pad. A crane will be used to install piles and roof trusses. Install a well and septic system. Install 2900 sf of driveway. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 2005 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): Corp of Engineers Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 2005 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ®No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T fill estrine fringe ? Yes ® No ® Corps ® DWQ 09 W2 ? P ? T N/A N/A ? Yes ? No ? Corps ? DWQ N/A W3 ? PEI T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts .09 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - or (PER) (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T N/A N/A ? PER ? INT ? Corps ? DWQ N/A N/A S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ? P ? T N/A N/A N/A N/A 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A P2 N/A K Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ? P ? T N/A N/A F1 Nos N/A N/A B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Impact outside of buffer Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed home is as far away from Sandy Huss Creek as possible in consideration of the septic requirements. The majority of the uplands are being used for the septic system and the required repair area for the septic system. The septic system and the repair area require 8,396 sf. Because of the septic system and the required subdivision set backs there is only 1789 sf of uplands on which to build the home and driveways. We are requesting a minimum amount of fill so that the home can be built in compliance with the N. C. Building code requirements with regards to flood plain regulations and drainage regulations. Those regulations require us to build the home above the 100 year flood plain and have positive drainage for at least 10' beyond of the perimter of the home. The wetlands that we are requesting to build on have only been created recently. Please see the attached survey that indicates the previous locations of the wetlands per the recorded map and the location of the existing wetlands. We will have no impact on the wetlands that are on the recorded map. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: N/A linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Any run off from sugnificant storm events would be sheet run off. ? Yes ? No Normal rain events will have the run directed to existing ditches that are part of the storm water plan for the subdivision. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 19% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The lot will be devolped in compliance with the DWQ Stomwater permit that has been issued for the entire subdivision. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ® HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. There will be a septic system installed per Carteret County Environmental Health Department design. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Corp of Engineers 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Corp of Engineers 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Corp of Engineers 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? -0 yes ? No 8b. If yes, explain how project meets FEMA requirements: The living level of the home will be above the 100 year flood elevation. 8c. What source(s) did you use to make the floodplain determination? Registered surveyor Archie D. Davis Jr a "- (?D L)<- 0 10/1512009 &c 1 Applicant/Agent's Printed Name Applicant/Agent's 09ig Date (Agent's signature is valid only if an authorization letter from the applicant is rovided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version c W? v o cn a O C ?s ?o ?a n s 0 n co N l a ? ro x c? a o I tzj y O O O I-- ' V1 O c?FF? SANDY HUSS DRlVLc 50' R ? W I z a A I 2B BO V T a \ H reference:M.6. 28/505 00 I • PRESENT OWNER: HOL TFORARCHIEDAUIS COUTRUCTION SURVEY TYPE:PROPOSED SITE PLAN STREET ADDRESS:113 SANDY HUSS DRIVE LOT,BLK,SUBD:LOT 9,HIDDEN HARBOR TOWN OF:MERRIMON SCALE 1"=50' TWP:MERRIMON COUNTY:CARTERET NORTH CAROLINA a as 2 _ X20 ?'?? U ma W KtViaiurv?) DEED REF:938-584 MAP REF:28-505 TAX PID:6494.02.97.8590 09517H0 SHEET:1 OF 1 ?9DATA FIELD SURVEY: 10-09-2009 DATE OF MAPPING: 10-09-2009 BY:LP2 DRAWN BY:LPL NECKED BY:JIP 1AMESI. AYNJPSL4NDSVRVYIN6, PA 379AghWmRd,, gwd4 NC 19S16 2SZ-72"7.3 9#DV & fax jWAMitatns'cDm NCDENR North Carolina Department of Environment and Natural Resources Oi?aislon of Coastal Management Beverly Eaves Perdue, Governor James H. Gre9scrl Director Dee Freeman, Secretary late ds-a9 Applicant Name la.. ?7 - Mailing Address ?V aka! "7 t'??`' 7?-Py/AA&) 5Zv 23? I certify that I have authorized (agent) 1420/E 4 1111 to act on trey behalf, for the purpose of applying for and obtaining all LAMA Permits necessary to install or construct (activity) ?oC at (location) // ??/?y /?y-? ?'?' ? ` ? T This certification is valid thru (date) 12-3 ? -09 Signature 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer . 50°P Recycled 110% Post Consumer Paper