HomeMy WebLinkAboutNCS000281_Stormwater Report_20191111ROY COOPER
Gavcrnor
MICHAEL S. REGAN
Srw tart'
S. DANIEL SMITH
Dire rfor
Bridgestone Bandag, LLC
Attn: Jerray Battle
505 W. Industry Drive
Oxford, NC 27565
NORTH CAROLINA
Environmental Quality
November 11, 2019
Subject: COMPLIANCE EVALUATION INSPECTION
Bridgestone Bandag, LLC
Bandag-Oxford Facility, Certificate of Coverage-NCS000281
Granville County
Mr. Battle:
On November 7, 2019 a site inspection was conducted for the Bridgestone Bandag, LLC facility located at
505 West Industry Drive, Granville County, North Carolina. A copy of the Compliance Inspection Report is
enclosed for your review. The site visit and file review revealed that the subject facility is covered by the
Certificate of Coverage NCS000281. Permit coverage authorizes the discharge of stormwater from the
facility to receiving waters designated Fishing Creek, a Class QNSW waterbody in the Tar Pamlico River
Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the
NCGO00281 permit. Please refer to the enclosed Compliance Inspection Report for additional comments
and observations made during the inspection.
Please be advised that violations of the NPDES Stormwater Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff has any questions,
comments, or needs assistance with understanding any aspect of your permit, please contact me at (919)
791-4200 or by e-mail at Thad.valentine(a)ncdenr.Qov.
Sincerely, JJ J��/
VO&AtA ,
Thad Valentine
Environmental Senior Specialist
North Czjrolino Mport nrent of Em ironnlcrual Quality I�Q_ E Q Pivisiuti of Energ}, blincral and Land Resources
512 North Salisbury Street 1612 Mail Scrvice Ccnter I Raleigh, North Carolina Zi01?-IoI2
� � . - - "�� A-0`1 919 70711 00
Permit: NCS000281
SOC:
county: Granville
Region: Raleigh
Contact Person: Jerray Battle
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(sj:
Related Permits:
Compliance Inspection Report
Effective: 09/01/08 Expiration: 08131/13 Owner. Bridgestone - Bandag LLC
Effective: Expiration: Facility: Bandag - Oxford Plant
505 W Industry Dr
Title:
Inspection Date: 11/05/2019 Entry Time: 10.00AM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Oxford NC 27565
Phone: 91 M03-5293
Certification: Phone:
Exit Time: 12 30PM
Phone:
Inspection Type: Compliance Evaluation
Page 1 of 3
Permit; NCS0002BI Owner - Facility: Bridgestone - BandagLLC
Inspection Date: 11/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The facility followed the requirements of their stormwater permit and kept very good,detailed documentation.) would ask that
the SP3 plan be updated since it has not been since 2015. The spill log should include how any spills were cleaned up and
how the spill materials were disposed. The sample apparatus at bothsample points have issues with sediment buildup and
needs to be addressed in a timely manner. A follow up report regarding the Zinc contamination and sample point issue
investigation should be submitted to this office within 90 days. Include an outline of possible or implemented solutions to
these issue.
Page 2 of 3
Permit: NCS000281 Owner - Facility: Bridgestone - Bandag LLC
Inspection Date: 1110512019 Inspection Typo: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Slormwaler Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
[]
# Does the Plan include a "Narrative Description of Practices"?
11
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
E] ❑
# Has the facility evaluated feasible alternatives to current practices?
0
# Does the facility provide all necessary secondary containment?
11❑ ❑
# Does the Plan include a BMP summary?
0 11 El El
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
N 0 El El
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
# Does the facility provide and document Employee Training?
0
# Does the Plan include a list of Responsible Party(s)?
0❑ ❑ 11
# Is the Plan reviewed and updated annually?
❑ N 0 ❑
# Does the Plan include a Stormwater Facility Inspection Program?
E
Has the Stormwaler Pollution Prevention Plan been Implemented?
Comment: Very well kept documentation. Please update the plan
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑
Comment: OK
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? E ❑
# Has the facility conducted its Analytical monitoring from Vehicle Ma.ntenance areas? El E El E]
Comment: The facility has exceeded benchmark levels for Zinc nearly ever sample event. You are in tier
three and should start monthly sampling and investigate the sources of zinc at the facility
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? E El D El
# Were all oultalls observed during the inspection? 0 ❑
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwaler) discharges?
Comment: The outfall locations need work to insure that a good and corn lets sam le can be taken
Page 3 of 3
lrlw�