Loading...
HomeMy WebLinkAboutWQ0040086_Application_20191107 PARKER & ASSOCIATES , INC . ENGINEERS • SURVEYORS • PLANNERS JACKSONVILLE , NORTH CAROLINA LETTER OF TRANSMITTAL TO: Mr. Monti Hassan DATE: November 7, 2019 NCDEQ -PERCS Unit REF: 6023 Richlands Hwy 1617 Mail Service Center WQ0040086 Raliegh,NC 27699 Sewer Application WE ARE SENDING YOU: One (1)Revised Plan Sheet(1 of 1); One (1)Revised Grinder Pump Station Calculation; One (1)Digital Copy of the following: Plan Sheet(1 of 1), Grinder Pump Station Calcs, Bouyancy Calcs, and Technical Specifications. DELIVERY VIA: ® Regular Mail ❑ Hand ❑ Federal Express ❑ UPS Overnight ❑ UPS Ground ❑ Other THESE ARE TRANSMITTED AS CHECKED BELOW: N For Approval ❑ As Requested ❑ For Review and Comment ❑ For Your Use ❑ For Bids Due ❑ Other COMMENTS: The supply line for the Pump Station falls under rule 15A NCAC 02T, 0303 and does not require a Permit. . 447 Anthony G. Moctezuma ec: Kiandra Anderson Staff Engineer AGM/brs CF (P), LAM RECEIVED (f enclosures are not as noted, kindly notify us at once) secretary c2 2019 Forms 6023Richlandshwy LOT Hassan 6023RichlandsHwy Sewer Application 11 7 19 NOY 1 2 2019 NCDEQ/DWR/NPDES 306 New Bridge Street I P.O. Box 976 I Jacksonville, NC 28541-0976 I (910) 455-2414 Firm License Number F-0108 I www.parkerjacksonville.com PARKER & ASSOCIATES , I N C . ENGINEERS • SURVEYORS • PLANNERS JACKSONVILLE , NORTH CAROLINA (910) 455-2414 I APT& 306 New Bridge Street I P.O. Box 976 Jacksonville, NC 28541-0976 Firm License Number F-0108 �4.0 EOL moe�®� 04,0-r o 4 SEAL Too a Sewage Pumping Station 3497 To Serve ®®�oe° o ®® 6023 Richlands Hwy i/,�",A. II0,�`y� ®11 INDIVIDUAL GRINDER PUMP STATION CALCULATIONS May 2019 Revised July 2019 Revised October 2019 1. DESIGN FLOW: 1 Single Family Residence = 360 GPD AVG A 9 to 15 GPM progressive cavity pump with 1.5 inch service line to tie into an existing 12"force main located on Richlands Hwy. 2. SYSTEM DATA: Service Line SPS Influent Invert Elevation 48.0 Feet BECEIVED Force Main Tie-in Point Elevation 48.0 Feet Wetwell Diameter 4.0 Feet NOV 1 2 2019 Float Settings NCDEQIDWRINPDES Pump Off Elevation 44.17 Feet Lead Pump On Elevation 45.17 Feet Alarm Elevation 48.0 Feet Civil Engineering I Stormwater and Environmental Consulting Feasibility and Development Planning I Land Surveying and Mapping I Subdivision and Construction Plans Page 2 of 3 3. 24 HOUR STORAGE VOLUME. Required Volume for 24 hr. Storage = 360 Gallons Volume Provided = 7r(r)2 x Height ft x7.48 f 11 t = 7r(2ft)2 x (51 —44.17) x 7.48 f 1 t = 642 gallons 4. CYCLE TIME: Wetwell Storage Volume (Vs) _ 7r(r)2 x Height ft x7.48 f 11 t Vs = rr(2ft)2x1.0ftx7.48f1 t Vs = 94 gallons Pump Cycle Time (T) mins T — Vs _ T — 94 gal Qavg 0 .25 gpm Qavg 1— 0 .25 gpm 1 — Qrate ` 13 .96 gpm T = 6.4hrs (Pump operates 3-4 times a day) Page 3 of 3 5. TOTAL DYNAMIC HEAD (TDH): The system was modeled using information provided by ONWASA along with calculations hydraulic base model provided by Crystal Coast Engineering. The addition of approximately 12 GPM from this individual grinder pump station demonstrates very little impact to the overall system. The progressive cavity pump as manufactured by Flygt has a very wide pumping range that can meet the demands of this system. See attached Hydraulic model for additional information regarding pumping conditions. Total Dynamic Head as predicted by the Hydraulic model USE TDH of = 81.43ft PUMP SELECTION System requirements 12.24 GPM @ 81.43 ft TDH Use: Single Flygt MF3068.175, 1.7 hp, 8.1 amps 230 volt single phase, progressive cavity grinder pump C2 2019.Forms 6023RichlandsHwy.SewageCalcs.Hussan.6023RichlandsHwy SPSCalculations.revised.10.15.19