HomeMy WebLinkAbout20071665 Ver 5_More Info Requested_20191108ROY COOPER.
Gover-nor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
November 8, 2019
NORTH CAROL,INA
Environmental Quality
DWR #07-1665 v5
Johnston County
Certified Mail
Return Receipt Requested
7017 2680 0000 2235 8700
Hearon Family, LLC
Attn: Amy Hearon
232 Gumberry Road
Ayden, NC 28513
Sanders/Letteney Limited Partnership
Attn: Alice Letteney
940 Trevino Drive
Belen, NM 87002
Subject: REQUEST FOR ADDITIONAL INFORMATION
Carriage Creek -Phase 6
To Whom It May Concern:
On September 23, 2019, the Division of Water Resources (Division) received your application requesting
a 401 Water Quality Certification from the Division for your project. The Division has determined that
your application is incomplete and cannot be processed. The application is on -hold until the following
information is received:
1. Please provide the Division a copy of your response from the U.S. Army Corps of Engineers
requesting additional information. [15A NCAC 02H .0502(c)] [15A NCAC 02H .0502(c)
2. Avoidance & Minimization for Wetland Impacts - Please provide more details regarding
avoidance and minimization of wetland impact #1 for this project [15A NCAC 02H .0506(f) and
(g)]. This Office believes that the stream impacts can be moved or reconfigured to avoid the
impacts. Please revise the plans to avoid the impacts or provide a detailed explanation of why
this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid
impacts to these impacts.
'\ North <)rsol`€twD YwtinerticifEnviro nrrngalQ j:ity DM,,iOrlofWeta'Rcxu'cc==
Etalci h lee giomil {) f �c a 3800 B.)rrot Di ive 1 t rleic;l Nc i 0 Cai of rr) 27E)09
1)1,9.71a7.4200
Carriage Creek -Phase 6
DWR #07-1665 v5
401APPROVAL
Page 2 of 2
3. The Corps of Engineers must also verify the Nationwide Permit that is to be used to authorize
this project. [15A NCAC 02H .0502(a)(7)j
Pursuant to Title 15A NCAC 02B .0233 (8), the applicant shall furnish all of the above requested
information for the proper consideration of the application. If all of the requested information is not
received in writing within 30 calendar days of receipt of this letter, the Division will be unable to
approve the application and it will be returned. The return of this project will necessitate reapplication
to the Division for approval, including a complete application package and the appropriate fee.
Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of
the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh,
NC 27699-1617.
Please be aware that you have no authorization under the Water Quality Certification Rules or the
Neuse Riparian Buffer Rules for this activity.
Please contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any
questions or concerns.
Sincerely,
a
S. Ja imiym
, P.G., Chief
Water QgionalOperations Section
cc: DWR RRO 401 file
DWR 401 & Buffer Permitting Unit file
U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, Ste.
105; Wake Forest, NC 27597
Wyatt Brown brownenvgrp@gmail.com