Loading...
HomeMy WebLinkAbout20171338 Ver 1_Signed_Field_Mod_B-5152_20171338dop_20191112ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality North Carolina Division of Water Resources Transportation Permitting Unit In -Field Minor 401 Water Quality Certification, Permit Modification Project Name/TIP Project No.: B-5152 Forsyth Co Date: November 12, 2019 DOT Division: 9 DOT Staff: Stephanie Braquet ACE Staff: Nicole Braspennickx DWR Project No./Permit Type: 20171338 DWR Staff: Dave Wanucha DWR Regional Office: Winston Salem Modification Description: NCDOT requested to convert 38 linear feet of temporary bank stabilization impacts at Site 3 to permanent. The purpose is to permanently stabilize an area where a sewer line crosses the stream. Area circled in green below. Sketch/Map/Plans: ")rj r • �` , -sit w,....� 5[TE 3 Y. PERMIT DRAWING SHEET 2 Of 8 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 Noana GwauNn � 919.707.9000 This in -field modification is required for the following reason(s): 4 Conditions under which the original certification was issued have changed in the following manner: Explained above in the modification description. This in -field modification is valid only if issued by an authorized agent of the Division of Water Resources, Transportation Permitting Unit' This in -field modification authorizes the NCDOT to convert 38 linear feet of bank stabilization at Site 3 to permanent. Original temporary impacts = 186; new temporary impacts = 186 — 38 = 148. Original permanent bank stabilization impacts = 46; new permanent bank stabilization impacts = 46 + 38 = 84. The project shall be constructed as described in our field visit on October 24, 2019 and electronic information received on October 18, 2019. Any further changes to the original Water Quality Certification dated November 6, 2017 may require a formal written modification request. The description of the proposed action provides adequate assurance that the proposed action in the Yadkin Pee Dee River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your project change, you are required to notify the DWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state, or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non -discharge and Water Supply watershed regulations. This Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Conditions(s) of Modification Approval: 1. None. Failure to construct the proposed action as described in the Modification Description and Sketch on per this document and/or violations of any condition herein set forth may result in revocation of this modification approval and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC, and therefore, this in -field modification is invalid. If additional wetland or stream impacts for this project (now or in the future) exceed one acre or 300 linear feet, or if mitigation is required above and beyond the current mitigation requirement for this project, this in -field modification is invalid and a formal written modification is required. This in -field modification is effective upon the date the last party signs this document. This in -field modification is made upon mutual agreement between DOT and DWR as indicated by the signatures below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification pursuant to the contested case provisions of the Administrative Procedure Act, NC Gen. Stat. §150B-23 et seq. Docusigned by: 11/12/2019 DWR Staff Signature: r VaVt� W 89736FD146FE4AD... Date: DOT Staff Signature: Shf6AAA, t 125DCB05810445B... Date: 11/12/2019 1 — An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT -funded and review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional Office personnel.