Loading...
HomeMy WebLinkAbout20191504 Ver 1_401 Application_20191029t�. . Ec SPLASH POINT 43 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification PCN Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ®Section 404 Permit ®Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 36 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? FEI Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2. Project Information 2a. Name of project: Splash Point (SP) Repair, Various Locations (SP43) 2b. County: Onslow 2c. Nearest municipality / town: Marine Corps Base (MCB) Camp Lejeune 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: USA 3b. Deed Book and Page No. Military 3c. Responsible Party (for LLC if applicable): Neal Paul, Deputy Public Works Officer - MCB Camp Lejeune c/o David Towler 3d. Street address: 1005 Michael Road 3e. City, state, zip: Camp Lejune, NC 28547 3f. Telephone no.: (910) 451-3228 EXT. 3284 3g. Fax no.: - 3h. Email address: David Towler@usmc.mil Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Neal Paul - c/o David Towler, PE 4c. Business name (if applicable): Deputy Public Works Director (USMC) 4d. Street address: 1005 Michael Road 4e. City, state, zip: Camp Lejune, NC 28547 4f. Telephone no.: (910) 451-3228 EXT. 3284 4g. Fax no.: - 4h. Email address: David Towler@usmc.mil 5. Agent/Consultant Information (if applicable) 5a. Name: Jason Hartshorn, PWS 5b. Business name (if applicable): Kimley-Horn 5c. Street address: 421 Fayetteville Street 5d. City, state, zip: Raleigh, NC 27601 5e. Telephone no.: (919) 678-4155 5f. Fax no.: - 5g. Email address: jason.hartshorn@kimley-horn.com Page 2 of 12 PCN Form —Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A Latitude:43.685495 Longitude: - 1 b. Site coordinates (in decimal degrees): 77.410261 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 1.27 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to New River proposed project: 2b. Water Quality Classification of nearest receiving water: SC; NSW 2c. River basin: White Oak 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Splash Point 43 is located on the western bank of the New River. There is a dirt road leading to the project area from the northwest. SP43 is located within an undeveloped forested area used for military training operations. 3b. List the total estimated acreage of all existing wetlands on the property: 0 ac. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 56 LF 3d. Explain the purpose of the proposed project: The proposed project will repair existing dirt ramps used for beach landing operations and training exercises by amphibious vehicles (known as splash points) that were damaged during Hurricane Florence. The boat ramps will be repaired by installing articulated concrete mats to provide long-term erosion protection and more stabilize_ d access points for training operations. 3e. Describe the overall project in detail, including the type of equipment to be used: The US Marine Corps (USMC) utilizes a network of splash points along the New River for amphibious assault training operations Camp Lejeune. Flooding and storm surge issues associated with Hurricane Florence resulted in localized damage to multiple splash points throughout Camp Lejeune, interrupting military operations. Rehabilitation will require regrading the supporting substrate at the splash point and will install a 16 foot by 56 foot articulated concrete mat. An excavator will be used to repair the substrate and to install the concrete mats. Other grading equipment may be used including bulldozers, scrapers, dump trucks, and compactors. A turbidity curtain will be installed for the entire process to contain muddied water and prevent impacts to receiving waters. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / El Yes ®No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type El Preliminary El Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Kimley-Horn Name (if known): Jason Hartshorn, PWS Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 12 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: No wetland impacts are proposed. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: No stream impacts are proposed. The project will impact a small portion of the shoreline along the New River, however these impacts. are included as Open Water impacts below. Page 5 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. ' 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ®P ❑ T New River Fill Esturaine 0.014 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: Open Water impacts are limited to installation of an articulated concrete mat along the shoreline of the New River. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: No pond or lake construction is proposed. 5h. Is a dam high hazard permit required? ❑ Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact . number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? B1 ❑P❑T El Yes ❑ No B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: No buffer impacts are proposed. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The project will utilize existing boat ramp locations that are currently used for amphibious assault training operations. Existing boat ramp locations consist of compacted sand and are cleared of vegetation. The project is designed to minimize impacts to the New River by limiting substrate grading to the minimum amount necessary to install the articulated concrete mat. Installing the mat will help prevent future erosional hazards and provide long-term stability for training operations. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Impacts will be avoided and minimized during construction by utilizing a turbidity curtain during construction. Construction of the articulated concrete mat will be conducted in high ground on the existing road access at each splash point and then placed in place by an excavator. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No impervious surface is proposed. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ® Other: None. 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ® Coastal counties ® HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No [5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 12 PCN Form— Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final. approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality?. 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage will be generated from the project. Page 10.of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A review of the NCNHP Element Occurrence Database (updated July 2019) identifies no known occurrence of any federally -listed species within the project area. Within a 1.0-mile radius of the project area, there are known occurrences of Atlantic sturgeon and West Indian manatee. Additionally, a review of the USFWS IPaC system found that the project location may support habitat for West Indian Manatee, piping plover, red knot, red -cockaded woodpecker, American alligator, green seaturtle, hawksbill seaturtle, Kemp's Ridley seaturtle, leatherback seaturtle, and loggerhead seaturtle. IPaC also notes potential habitat for Cooley's meadowrue, golden sedge, pondberry, rough -leaved loosestrife, and seabeach amaranth. The project is not anticipated to impact any of these species due to the lack of habitat, minimal footprint and construction disturbance caused by installing an articulated concrete mat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ® Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA EFH Mapper was accessed on July 30, 2019. The location of SP43 is not in PNA. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? A review of the NCSHPO online database shows no known historical or archeological resources within the project area. Additionally, MCB Camp Lejeune Environmental Department staff refers to and complies with the Camp Lejeune Integrated Cultural Resources Management Plan (ICRMP) which is required by DoD and approved by SHPO. The ICRMP identifies historic buildings and archaeological sites and details the permitting procedures to continue with the necessary development on base. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Project'is a water -dependent structure. 8c. What source(s) did you use to make the floodplain determination? The FEMA Digital Flood Insurance Map (DFIRM) Panel 3720438000J (effective November 3, 2005) was accessed on July 30, 2019. Zones AE and X are located within the project boundary along the New River. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version Date r�•�e m�i Applicant/Agent's Printed Name Appli nt/Agent'i Signature (Agent's signature is vatid ly if an authorization letter from the applicant Is rovided. Page 12 of 12 PCN Form — Version 1.3 December 10, 2008 Version Legend Onslow County 13 Project Study Area 1 Georgia West Virginia JUUIII Udl U1111d Viginia Is ONSLOW CARTEREI Figure 1: Vicinity Map Camp Lejeune Splash Point Repair Onslow County, Camp Lejeune, NC October 2019 52' RECRADE/FILL THIS AREA - 19LFt EXISTING SAND BEACH 2' ARTICULATED CONCRETE MATTING (8.5' THICK MINIMUM) / 3 Z I I — H 1 — 0 THIS AREA 111--- NONWOVEN _ I GEOTEXTILE FABRIC pRIGRIIIFILI _ PREPARED SUBGRADE NONWOVEN GEOTEXTILE FABRIC .Y ARTICULATED CONCRETE MATTING BOAT RAMP ' NOT TO SCALE S101 MARINE CORPS BASE C4V LE2UN[, XONM GIRINM Kam.ro . o „.r r. roN .w REPAIR SPLASH POINTS SPLASH _ wN n e, oo za eEiuu MCB CLNC EE',novai �N[[nEcrrMmncrm ro TpnMmmm[p wncEn. ioLxWiN-x ro 0[!FN 00. T. BtMttIN. PE Of TA E, p0E Oq0 NO o[nMTtl M0. iE, u s�oNx SPEe as,s-oae� Err e o