Loading...
HomeMy WebLinkAbout20061518 Ver 2_Shoreline Stabilization_20191106,)2 e ,. State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR-401 & Buffer Permitting Branch DWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 fC'�� �Olq A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: o' Mailing Address: 3 U o ra— n Pri F 0 3 7 Telephone Number: 76) 1J 7 76? �?6 7d Fax Number: E-mail Address: Je-(.Cv 2. Agent/ Contact Person Information �tK Kll souGtt4� A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: httr)://www.saw.usace.armv.mil/Portals/59/dots/reRulatorv/rep,docs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) �1 County: L11\ ( 0� n Nearest Town: r er1 Ver Lake/ river/ ocean adjacent to property: A)&rlvt q Vt Property size (acres): 1 6zCr'e Subdivision name or site address (include phase/lot number): S r c,,54�,,,e\A c-(),o 104 i4=13 Directions to site - please include road names and numbers, landmarks, etc.: %V- cpn 6-"" re5 16� (Z.y'1n� �,/� We�bS� �e��"�✓i P•15+wtss�� C�ov,.� Sri, � �,� f�ivP�t��fl k�i> , � �t°-� c,� t�l�� �%✓�� ice, �r✓iyP ��(c�'S: Latitude (in decimal degrees) 630 7 Longitude (decimal degrees) ,fin q1? Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): s 1(,(��� a 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 4 a44,( �� rG 1,2 10"A /0 /1"N1�� 7. Will work be conducted from land? Z From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: _5o r/ cam 4P Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Z(go S C/ "U I Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Mv) ch , urP 5 c:M--e S'4n4 0 �� `f inet' S, $ 11. Signature Owner/ gVture 's Si *Agent's i re* [15A NCAC 02H .0502(f)] Date valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake 6,2''Irr V"AAM (At Full Pond/ Normal Water Leve Full Pond/ Normal Water' Level Shoreline I 1 P p64a w I�p14 (�� ale O I I �� ul III 1�3"j� ti Plan View "� � ��ip � ° Iu�P s€,fral° I. drd„.�� "f �k€� � � � I u1 I II I, II ✓U � � FORM: SSGP 02-2017 Lake (At Full Pond/ Normal Water Levey Existing Dock 30 ft $ 7 ft 3 ftx 150 ft Below full pond/ NWL Full Pond/ Normal Water Level "Iho eoreT'r rr — ®ine � akxasofc Riprap Above full Pond/ NWL 2 ft, x 150 ft. additional clearing ' If necessary XA FM P L E I i Plan ViewE 1 Page 3 of 4 5 (6 re I s 6-00d - t I a id A/e p, a La ke (At Full Pond/ Normal Water Lever � Ln 0 C Side View ILI- 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing f necessary Existing bank 10 ft. bank Side Via I FORM: SSGP 02-2017 Page 4 of 4 ' �vl �r� '- _ _ _ l �z, . �: � 1 g _�t -- �� �`: u '�,' ' P �; - ' - ��. /�� Lj: f Y fi r t ° Off