Loading...
HomeMy WebLinkAbout20191518 Ver 1_401 Application_20191030CPT Engineering & Surveying, lnc.jj� .�f LETTER OF TRANSMITTAL To: Date 10/18/19 Job No: 1405-16 NC DWQ, WBSCP Unit Attention: 512 North Salisbury Street Avondale 11 Raleigh, North Carolina 27604 PCN Application & Sp2portiag Documents RF, We are sending you: V' ® Attached ❑ Under separate cover via : tis ArAyrg ifft� �YR k (// 2o� ® Plans ❑ Diskette(s) ❑ For Approval ® For Review ❑ Sp g s®Ctj ❑ Other: Quantity Dw . No. Description Status 5 Preconstruction Notification forms 5 Supporting Documentation 1 Application fee check enclosed for $240.00 Remarks: Attached is a PCN for Avondale in Greensboro, NC. A PCN package including has been sent concurrently to USACOE in the Raleigh Regulatory Field Office in attention to David Bailey. If you have any questions, please do not hesitate to give me a call. Thanks. Chuck Truby CPT Engineering and Surveying, Inc. 4400 Tyning Street • High Point, NC 27265 Phone: (336) 812-8800 ex 309 • Fax: (336) 812-8780 email: toddm@cptengineering.com O�O��y 4 A 7-fq9 O INC:!_ t Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X❑ 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Avondale 2b. County: Guilford 2c. Nearest municipality / town: Greensboro 2d. Subdivision name: Avondale 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Keystone Group 3b. Deed Book and Page No. DB 5868 PG 1863 3c. Responsible Party (for LLC if applicable): Scott Wallace 3d. Street address: 3708 Alliance Drive 3e. City, state, zip: Greensboro NC 27407 3f. Telephone no.: 336-856-0111 3g. Fax no.: 336-369-1336 3h. Email address: Swallace@gokeystone.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Owner 4b. Name: Scott Wallace 4c. Business name (if applicable): Keystone Group, Inc. 4d. Street address: 3708 Alliance Drive 4e. City, state, zip: Greensboro NC 27407 4f. Telephone no.: 336-856-0111 4g. Fax no.: 336-369-1336 4h. Email address: swallace@gokeystone.com 5. Agent/Consultant Information (if applicable) 5a. Name: Chuck Truby 5b. Business name (if applicable): CPT Engineering and Surveying, Inc. 5c. Street address: 4400 Tyning Street 5d. City, state, zip: High Point NC 27165 5e. Telephone no.: 336-812-8800 x 304 5f. Fax no.: 336-812-8780 5g. Email address: chuckt@cptengineedng.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7852807017 1b. Site coordinates (in decimal degrees): Latitude: 36.00062 Longitude: -79.814753 1 c. Property size: 30.668 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Ryan Creek 2b. Water Quality Classification of nearest receiving water: WS-V, NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Wooded Land surrounded by interstate highway to the north. 3b. List the total estimated acreage of all existing wetlands on the property: 0.083 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,200 3d. Explain the purpose of the proposed project: Residential Subdivision 3e. Describe the overall project in detail, including the type of equipment to be used: The development of a 83 lot subdivision with streets, utilities, storm sewer and wet detention ponds. Equipment Used: Track Hoes, Bull Dozers, Pans, 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? X❑ Yes ❑ No ❑ Unknown Comments: pending 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Michael Brame Agency/Consultant Company: Pyramid Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Pending 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland Yes Corps 0.048 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.048 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT of Ryan Creek PER Corps 2 128 S2 Choose one S3 Choose one _ S4 - Choose one - S5 - Choose one S6 Choose one 3h. Total stream and tributary impacts 128 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman © Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet 61 P Road Crossing UT of Ryan Creek No 5,787 4,815 B2 No B3 - No B4 - No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 5,787 4,815 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The slopes are proposed to be 2:1 which is the steepest allowed. The pipe length is as short as possible to keep stream impacts to the minimum amount possible. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The culvert will be constructed first and then the fill will be placed. Erosion control devices will remain in place during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑x Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑X Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 27.5 % 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Wet Detention ponds are proposed to treat the runoff from all impervious areas. Runoff will be conveyed via storm pipes or swales. 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Greensboro 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Greensboro ❑X Phase 11 ❑ NSW 3b. Which of the following locally -implemented stormwater management programs USMP0 ❑ apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes X❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): []Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ©No additional development, which could impact nearby downstream water quality? 3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility. Greensboro. Greensboro All wastewater from this development will be treated by the City of has capacity for the sewer. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website with verification by USACE. https:Hecos.fws.gov/ecpO/reports/species-by-current-range-county?fps=37081 and https://ecos.fws.gov/ ecp/ 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://www.fws.gov/raleigh/species/cntylist/county.html with verification by USACE. Site is not near salt marsh, oyster reef, or sea grass beds. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? State Historic Preservation Office http:/twww,hpo.dcr.state.nc.us/ with verification from the USACE 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Insurance Map Panel 7851, 7852, 7861, 7862, City of Greensboro 3710785100J, 3710785200J, 3710786100J, 3710786200J, Dated June 18, 2007 S� w Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 �— 01I� ppg! Bldlf OF IqY 1 pa ro,rc. ru \ -44, ✓� // g m L.wewrl 7 // d eear � / / d / a.�.aaue.ry II 1 � � ^OD BUFFER G � C eT0 11 � t AREA REQUIRED: 3.107X50'-155.100SF 1 I 1 \ AREA PROPOSED: I 40 X 2,1161- 8e,79e SF I I` .71.14LSF TOTAL. 156.077 SF ASSOCIATION COVENANTS AND RESTRICTIONS WILL CONTAIN A SECTION PREVENTING HOMEOWNERS FROM DISTURBING THE SCOD BUFFER ALL BUILDINGS ON THE SITE MUST BE REVIEWED FOR COMPLIANCE W TH THE SCOD BUFFER REOUIREMENTS AT THE TIME OF BUILDING PERMIT SUBMITTAL. emobAwAndono ID Ulf ze rrns ow ' c«.q aAsaol. aycawi. cry rI I. coy mQ.& * SM ItI lorA ft 114 4w Nw[ sw nw Cawch Rd, 004m$ ewq /M - a�srnyalwM. It s.w.l[.el. A.oe..«rrron M zw,ls c.rR.Iwe1L Ap1R +s, 3t1a. AAernd by Cky e..Res No lt, lets. tL'', �xalrLt�te.*Lii ;: 2s.1s Atss L t Nws IYdbd M • [eSQYRI.Of M y O ® \ ® o o . o o o Ice U / Ir r R 8 r Rem W, OWN" I awwii/ I I I I r 1 LOT INFORMAIION: �- --0 -----L------ —p O.b�111WILAW WNS STATE \ Iow Rem b.01®I r. mumom Y Iw ..... wwro+wAY >� L6l�tsaaYl \ h' I S ec ..... PACO or \ ` PM ......IWAIEGmlR R WASE.ALLPW5 OEM AM Q"VIm PO 56 ue .....ImnrLrLsalr 11ta5ORat'JEM71L9. � �I MAC .....lelATM Ad4r R.meM f�o.T. ..... 9111 0111MAeX7ft-)INt ie0lr e.;.eV. r;clfr. a.bbr.M.w... RIK Dwll....L#MMI IMMIRWL2VMTR�OR J11r.;�rw.YrulrbMDo1�>�1)IXMUM Nct..... rem OHRrA1r r.r.r.ar.10-6.l\OIL 4 FA ALL BUILDINGS ON THE SITE MUST BE REVIEWED FOR COMPLIANCE WTH THE SCOD BUFFER REQUIREMENTS / AT THE TIME OF BUILDING PERMIT SUBMITTAL. �� 0, alBr+a-r wt�r [Ue r a1r � � 1k' ` arr erraa ✓�. A maw .Vn. q L � tL e7ys N si%n1•ov AYM mwtlr =•l+� M • d I A• �,w7�t�ir��i.�w� ew• a.. vi T Y o r OT�p R! l E M i 0 0 R O iACE TO FADEI 26' sol SCM RZ ( 1 \ O 1il it \ i \ &RAPHIG SCALE 100 0 50 100 200 400 ( IN PQT ) I w-h. 100 f. REV1510NS ;I i pIr �s OAMERIDEVEtOPE12: 1lIelOE e.I,K rr W WIQOM. eiw.raKa�. mmeernr wp.In R7Rwer:. ENGINEER: ore.eerrear.erW K, ..1lleral.r :.Ilaa,ca. m.c[r..1r.,ra eap.Ieuw .�awgv..rwml SEAL 14W4 z O v o� z LL-1 W �v Iw- � � Ix- ZQz w Lu � O ILII Q� w x O OVERALL SITE PLAN SCALE, 1" = 100' DATE: 10116Aq PROJECT: 1405-1-7 17RANPl &r; T6L, MV SHEET G REVISIONS // ///,./i//i;.'�♦ice\\ / / • wi�ii ti \ , wit'- �`� :�• �. 1 /� // ,\ �� � I � I I / -_ ,. i b � ®i t«. \;tea �%.��•�•� {\ tl - � / ' % f � // T 1 1 1 I 1 I /''�'�'_ � 1 I \ 1 T \ \ � � I I 1 \ ■is, t`� �\. \ Vr-4WrTY MAP Ilk VA T kk Irk' :R ' rq�'�Y��'R� ,.E � / /+g'1 ? \I \ \%` �y;.. ... (Js? �\ \\ .\ "\`\ 1Ilk\ 41W- IWO law ` �\ \\ ♦\ \\ \ \ \I +�' �iY•\ twl 1 /' �,/`' _J + \ !� / ! IL \ O \\ �, .`�� � .r-- 1 ,\ 1 �\•. 1 /���"_ �� / J / / /" I / / ! � // �'� �/ `� lam-"'/\ ,b�(J\OVEF pD LOT INFORMAIai, � _ _ / r / — — — OWNERIDEVELOPHt: 4 wo ..... ta•n.r Ror wre Orwnr►e I - `- - =l -- ! NER . 1 nRawatRR ..� .....Ia1RO11>D »� •_ �_ \ SRC D \ �\ s I ...co,varriorr nv[aww� _- ( 3 sa) _ Ljwam aKM! l ePROVKM t/ ...wwww~ M1 •\ ��a '\_ �''�' '^�- &RAPHIG SCALE ti ..... twsora•e _ \♦ \�� (. R.! .....~AM ORNIA•! tL,blfr ue ..... tMY1T �tRR rwc .....,rA,we A<0f tawtsR ALLAPERM FMM MM [ CO® FM% ULII'S OMEOI'!E la®.•. � I Id0 \ I , O 50 I00 :00 400 Rs O aaT......wwrrrwxlRwrs w awo�r.+iorn.raro,ertr..,+xw.�xrc r/Qr, ::::.•RM�'pp/tR=ramv fi1'tL1e((!tf •plRirtn•YtalrbMDRp�M7D19MlYl twos - w WN 00 ft, h SEAL 14954 �c i.ecw z V a L Z LL J W r� Q z Qr Z 3z O O � Q Wg ZO �z Nw Q� Q W s w ALL GRADING PIAI Rrwuvesm taoeewr. � Awn SCALE: I" = 100' DATE: 10/Ib/IQ sw.ecpocmrRmr PROJECT: 1405-I1 ENGAIEE2 �"�"•�,�� DRAM 8Y: TGL, NI`/ ~� wtto•,r:Rs IYMCEn•oiRrr.rE ttocAosrr rO�ocgvtr.®.rmt SHEET _6 �. Now S1,`S2 STREAM IMPACTS 112 LF - 36 RCP (S1) W1, WETLAND IMPACT ,16 LF - RIP -RAP (S2) WA AREA = 2,080 SF 1 128 LF 22q\, T SHb ,� I> G l TY n I M PACT AREA t LAT 36.0006200 g LONG-79.8147530 6.. �)E e 1 / 5R 1112 L rm :2 VICINITY MAP N.T5. LI.<M_�s EX15TM GONTOL S • 5' INTERVAL5 — —150 — — EXISTINS CONTOURS • IO' INTERVALS 7L0 PROP05iD CONTOUR •vwvwvw� EXISTING TREELIKE EXI5TING GA_ 57REM•1 Y'ET1AND AREA JEW STORM PIPE K`�C. J. 1 RIP -RAP MWEEMEMENU\M STREAMIMPAGT METLAND IMPACT \I,I111111/l///� ECAR�<; O 0,y SEAL n 14984 - ' 9• LNG evNEE� • ��, 30 0 15 30 1 inch = 30 ft. A uj A oZ a 0 5GALE, V.50. DATE, 10/16AIR PROJWT- 1405-16 DRAM BY- , SHf T 1 EX. STREAM BED b4O DATUM FIN15HED 6RAI >E &30 3(o" Rc 820 RIP -RAP APRON MBED INTO EX. STREAM D) ELEV 810.00 O O � m Ln O Q, O Q O t IMPACT AREA 0+00 S LAT 36.0006200 { LONG-79.8147530 0+50 FLOW VICINITY MAP N.T5. `O 01 ESSIn� SEAL n 14984 :� '•.FNGINE��•�"�':� i SPA xf to /19 20 0 /0 20 1 inch = 20 ft H) 1 inch = 2 ft~ V) I SCAM" smom VAT& 10A&M DRAM awl TL stw 2