Loading...
HomeMy WebLinkAboutWM0501377_Final Permit_20191105ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality November 5, 2019 Mr. Marston Smith Dalian Development, LLC 1212 New York Avenue, NW Suite 1000 Washington, DC 20005 Subject: Monitoring Well Construction Permit # WM0501377 Hillsborough Street Properties Raleigh, NC — Wake Count Mr. Smith: In accordance with the application received on October 30, 2019 we are forwarding herewith Monitoring Well Construction Permit No. WM0501377 dated November 5, 2019, issued for the construction of a monitor well system (installation of nine temporary monitoring wells) at the subject properties. Please be aware that some counties have well construction programs, and you may be required to obtain a well construction permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the conditions and limitations as specified therein. Please note the addition of stipulation #3 to the permit enclosed. Sincerely, 4 S. ay Zerman,. P.G., Chief Water Quality Regional Operations Division of Water Resources Enclosure cc: RRO Files Wake County Health Department Scott M. Werley, ECS Limited, sent via email (swerelygecslimited.com) DEAlre"M"tal � North Carolina Department of Environmental Quality I Division of Water Resources i1ped9mm Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 l 919.791.4200 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Dalian Development, LLC FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM (Hillsborough Street Properties) consisting of a monitoring well system (nine (9) temporary monitoring wells) owned by Dalian Development, LLC at mailing address 1212 New York Avenue, NW, Suite 1000, Washington, NC 20005. Nine temporary monitoring wells will be located on property owned by HBS Properties, LLC & HBS Properties II, LLC., located on the southwest corner of Hillsborough Street and S. West Street in Raleigh NC (PIN #s 1703497166, 1703498135, 1703499059, 1703499022, 1703498033, & 1703947096), see site map attached to application. This Permit is issued in accordance with the application received on October 30, 2019 which is filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of the completion of drilling of the borehole. Permit issued the 5 h of November 2019 FOR THE NORTH CAROLINA ENVI MENTAL MANAGEMENT COMMISSION S. J Z,' erman, P.G., Chief Water Qua ty Regional Operations By Authority of the Environmental Management Commission Permit No. WM0501377 D E North Carolina Department of Environmental Quality I Division of Water Resources 4N0RT�HC%11NARaleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 ��o.a.nmemdronlmnW Q..IN /� 919.791.4200