HomeMy WebLinkAbout20090554 Ver 1_Triage Comments_20091013owe
(1-
Use this form instead of writing inside the folder
Triage Comment Sheet
Triaged By: l
Reviewer 1 l?V In ^~01 , ft Date: %?Z D
Reviewer 2 ?o?.? ?-•? Date: -?
Reviewer 3 Date:
? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2)
Issue with conditions (Reviewer 1)
? hr?/c s.??r e w ?- CIII.?
Issue 61h ,tditions (Reviewer 2)
V
? More Information (Reviewer 1) ? More Information (Reviewer 2)
? Return Application (Reviewer 1) ? Return Application (Reviewer 2)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
1ATriage FormsUriage Issue Sheet.doc
PLEASE PRINT CLEARLY
09-0554 Olde Mill Stream - take 2
AML comments
October 13, 2009
Based on the impervious inventory that was provided in the submittal received on
September 14, 2009, all of the drainage areas in Phase I significantly exceed 24%
imperviousness. Per the requirements of GC 3705, this project must comply with
Stormwater Management Plan (SMP) Requirements for Applicants Other Than
the North Carolina Department of Transportation, available at:
http: //h2o. enr. state.nc. us/'tiewctlands/documents/"SMPRequireinentsforApp I icants
otherthanNCDOT.pdf. Please include an SMP that removes a minimum of 85
percent TSS and 30 percent TN from all of the stormwater generated by Phase I
of this project. For each proposed BMP, please provide a completed BMP
Supplement Form, with all the required items. The BMP Supplement Forms are
available at the following web site: http:,//h2o.enr.state.nc.us/su/burp forms.htm.