Loading...
HomeMy WebLinkAbout20191547 Ver 1_BR-0113_Buffer Drawings_20191029_20191107F 4- See Sheet 1-A For Index of Sheets See Sheet 1-8 For Conventional Symbols See Shhet IM192CFO Sheets 48 1300 1607 PROJECT SITE �0 1608 4a �a 1313 1601 1210 1601 48 riP h.� 61 1200 115 O 661 1200 1zu ea hsville 1210 O1212 ^� q Pu��Fw 1002 edoc � 1200 OFF -SITE DETOUR STATE OF NORTH A �j` O � w I N PPATB BTATE PRO BCT RPPRR6NC6 NO. �L N. T TOTA fL�/� d/�]\1 SHBP DIVISION OF HIGHWAYSSTATB PROLN0. P. A.PROl.N0. D69CRIPTION 48822.1.1 PE 48822.2.1 ROW, UTIL. HALIFAX COUNTY LOCATION: BRIDGE NO.410115 OVER ROCKY SWAMP ON SR 1601 (SLEDGE RD.) TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURE BUFFER IMPACTS PERMIT 4 ,\Coi SITE 1 BEGIN BRIDGE / END BRIDGE 6� -L- STA. 15+63.BD �o Ir STA.16+56.DD $ ti ROC Y SWAMP j l SR 1601 (SLEDGE RD.) W TO NC 48 �TIiSVILIE RD) END NCDOT 4Jj PRO ECT BR-0113 BEGIN NCDOT PROJECT BR-0113 �..\ -L- POC STA. 19+30.00 -L- POT STA. M+38.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 11111111111----1 PROFILE (HORIZONTAL) 10 5 0 10 20 11111111111----1 PROFILE (VERTICAL) DESIGN DATA ADT 2019 = 340 T = 6 % * V = 55 MPH " (TTST = 3%Q + DUAL =3%Q) FUNC CLASS = RURAL LOCAL SUBREGIONAL TIER PROJECT LENGTH LENGTH ROADWAY PROJECT BR-0113 = LENGTH STRUCTURE PROJECT BR-0113 - TOTAL LENGTH PROJECT BR-0113 = NCDOT CONTACT. • DAVID STUTTS, PE PROJECT ENGINEER - PERPROGRAM MGT. DIVISION OF HIGHWAYS STRUCTURES MANAGMENT UNIT 1000 BIRCH RIDGE DRIVE RALEIGH NC, 27610 0.095 MILES 2018 STANDARD SPECIFICATIONS 0.017 MILES EDWARD G. WETHERILL. PE RIGHT OF WAY DATE: JULY 24, 2019 0.112 MILES PROJECT ENGINEER GREG S. PURVIS, PE LETTING DATE: PROJECT DESIGN ENGINEER JUNE 16, 2020 1223 Jones Franklin Rd. �P 27606 D 0 Raleigh, N.C. -0377 ETHERILL License No. ENGINEERING Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GISIGPS - CONSTRUCTION OBSERVATION BRIDGE #41011 S BUFFER DRAWING SHEET 1 OF 4 NO DECK DRAINS INCOMPLETE ]PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ITYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. 3 0' 0' 3 0' zci ITE J0 GRAPHIC SCALE �-U` z BUFFER DRAWING o SHEET 2A OF 4 °a ROCK SNP° PLATE 1.5:1 U w .5:1 RACK P�L�—s FROM 65 SY —L— STA. 14 + 75.00 TO 15 + 52.9 FLOODED TIMBER LT FROM A. TO 17+15.00 16 + 67.06 LT — 35 SY KY SWAMP - w� F °° IF F — — — ��\ F ___ 77 / CLASS B P RAP EST. 1 TN RAP / C L 11 RIP RAP I EST. 5 SY EOTEXTI E / TO 182.2' ALLOWABLE IMPACTS (BRIDGE) ZONE 1 I C II RIP ' RAP T 182/2' m ROPOSE� *LOWABLE IMPACTS ZONE 1 (ROAD CROSSING) ST .PAY ITE/1) (V ROCKY SWAMP �� �u EXCAVATION � ����� TR. PAY ITEM) ALLOWABLE IMPACTS ZONE 2 (ROAD CROSSING) ALLOWABLEIMPACTS ZONE 2 (BRIDGE) m W \ FL ODEDk IfV�'BER �i U U z o \ �c9 RETAI N FLOODED TIMBER ROPOSED EXCAVAT I z Lu — XISTING� ND B (STR. PAY ITEM `� z o w ` U w /' BUFFER IMPACTS SUMMARY IMPACT BUFFER REPLACEMENT SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) TYPE ALLOWABLE MITIGABLE ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft) ZONE 2 (ft) TOTAL (ft) ZONE 1 (ftZ) ZONE 2 (ft2) TOTAL (ftZ) ZONE 1 (ftZ) ZONE 2 (ftZ) 1 90' Bride -L- 15+53 to 16+66 X 963 31 994 -L- 15+33 to 17+36 X 1003 1259 2262 TOTAL: I I I 1 1966 1 1290 1 3256 1 0 1 0 1 0 Rev. May 2006 WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS STATION ZONE 1 ZONE 2 SITE NO. (FROM/TO) (ft) (ft) 1 -L- 15+48 to 17+36 251 490 TOTAL: 251 490 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY PROJECT: BRIDGE SF-950121 10/29/2019 SHEET 4 OF 4 Rev.Jan 2009