Loading...
HomeMy WebLinkAboutNCG030307_CEI_20191108ROY COOPER. Governor MICHAEL S. REGAN Secretory S. DANIEL SMITH Director United Tool & Stamping Co. of NC, Inc. Attn: Bryant Van Vlaandere, Vice President 2817 Enterprise Ave. Fayetteville, NC 28306 NORTH CAROLINA Environmental Quality November 8, 2019 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG030000 United Tool & Stamping Co. of NC, Inc. United Tool & Stamping Co. of NC, Inc. Certificate of Coverage NCG030307 Cumberland County Dear Mr. Van Vlaandere: On October 22, 2019, a site inspection was conducted for the United Tool & Stamping Co. of NC, Inc. facility located at 2817 Enterprise Avenue, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Justin Hoover, Administrative Assistant was present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG030000 under Certificate of Coverage NCG030307. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Blounts Creek, a Class C waterbody in the Cape Fear River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG030000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@ncdenr.gov. �Sincerely, Melissa Joyner Environmental Specialist DEMLR Enclosure: Compliance Evaluation Inspection ec: Justin Hoover, Administrative Assistant (via email) cc: FRO — DEMLR, Stormwater Files -D ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 p,vnr,w m m ie�,�em,�„wawh 910.433.3300 Compliance Inspection Report Permit: NCG030307 Effective: 11/01/18 Expiration: 05/31/21 Owner: United Tool & Stamping Cc of NC Inc SOC: Effective: Expiration: Facility: United Tool & Stamping Cc of NC Inc. County: Cumberland 2817 Enterprise Ave Region: Fayetteville Fayetteville NC 28306 Contact Person: Bryant Van Vlaandere Title: Phone: 910-323-8588 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/2212019 EntryTime: 01:04PM Primary Inspector: Melissa A Joyner ' "-1 Secondary Inspector(s): Certification: Phone: Exit Time: 02:30PM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030307 Owner • Facility: United Tool & Stamping Co of NC Inc Inspection Date: 10/2212019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Justin Hoover, Administrative Assistant at the United Tool & Stamping Co of NC Inc. facility. She reviewed the Stormwater Pollution Prevention Plan which contained the majority of the required information as stipulated in General Permit NCG030000. The site map should contain all the information per General Permit NCG030000. Annually, there should be a signed and dated certification about the outfalls being inspected for non-stormwater discharges. A list of significant spills or leaks of pollutants over the last three years or the notation that none have occurred should also be documented annually. The Analytical and Qualitative Monitoring records were reviewed. The facility is currently in monthly monitoring because there have been exceedances of copper, lead and zinc. If there have been no discharges, the Stormwater Discharge Monitoring Report form should still be submitted with "No Discharge' being marked on the form. A similar notation should also be marked on the Qualitative Monitoring Form. It is recommended that the facility continues to conduct feasability studies to modify methods of operations and/or storage practices to eliminate or reduce exposure of materials to rainfall and run-on flows, to reduce the number of exceedances with copper, lead and zinc. Outfall #1 and the grounds were inspected and appeared in good condition. Page 2 of 3 permit: NGG030307 Owner - Facility: United Tool & Stamping Co of NC Inc Inspection Date: 10/22/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a SMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? E ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? E ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ N ❑ ❑ Comment Page 3 of 3