Loading...
HomeMy WebLinkAboutWQ0041286_Application (FTSE)_20191108Civil CDC resign Concepts, PA Transmittal Date: October 25', 2019 Project Name: Retreat at Arden Farms CDC Project: 11843 To: Tim Heim, P.E. Environmental Engineer — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 Via: ❑ Mail ❑ Overnight ❑ Hand Delivered ❑ Pick up @ CDC Office ❑X Digital Copies Date I Description ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 ------------------- 1 --------------------- 10/23/2019 1 10/23/2019 Cover Letter --------------------------------------------------------------------- Check in the amount of $480.00 (to be hand delivered) --------------------------------------------------------------------- 24x36 Engineering Plans ---------------------------------------------------------------------- FTA 04-16 Fast Track Sewer Application ---------------------------------------------------------------------- Developer's Operational Agreement ---------------------------------------------------------------------- FTSE 04-16 Flow Tracking Acceptance Application ---------------------------------------------------------------------- Site Maps ---------------------------------------------------------------------- Sewer Generator Sizing Report ---------------------------------------------------------------------- Sewer Generator Specifications ---------------------------------------------------------------------- NC Certificate of Authority ---------------------------------------------------------------------- MSD Sewer Allocation ------?nFoster, e-- --- __----- -- K ----------------------- Jas Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 CDCci.,'., ilig esnCcpts, PA October 25th, 2019 Tim Heim, P.E. Environmental Engineer — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 RE: Retreat at Arden Farms CDC Project No.: 11843 Dear Tim Heim, On behalf of Oxmoor Apartments, LLC (formerly Tynes Development Corporation), we are requesting your review and approval of fast track sewer system extension permit application package for the subject project. The proposed project consists of a proposed public gravity sewer extension connecting to a proposed private force main system to serve; 312 multi -family residential units that will be leased, and other appurtenances located at 539 Long Shoals Road in the Arden. Please note that the flow allocation was for 124,800 GPD. This project is single phase and will not use the entire flow allocated. The proposed flow will be 272 one- and two -bedroom apartments and 40 three -bedroom apartments. The design flow was determined to be 240 GPD for each one- and two -bedroom and 360 GPD for each 3-bedroom unit. Therefore, the flow to be utilized by this project will only be 79,680 GPD. We wanted to clarify this at this time for your use in review and approval of this project. Please find enclosed the following items for your review and approval: • Check in the amount of $480.00 (to be hand delivered) • 24x36 Engineering Plans • FTA 04-16 Fast Track Sewer Application • Developer's Operational Agreement • FTSE 04-16 Flow Tracking Acceptance Application • Site Maps • Sewer Generator Sizing Report • Sewer Generator Specifications • NC Certificate of Authority • MSD Sewer Allocation Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 If you should have any questions or need any additional information during your review, please do not hesitate to call our office. Sincerely, Jason Foster, P.E. Civil Design Concepts, P.A. jfoster@cdcgo.com ; ue simpu'poP , ass "% 4w—s 91 0 C7 b C7 00 z v v a z r � o O Oz V! U LL Z 03 E i.L. U � �a Qa..' R� Lo Z W 0 M mLLI T 0 z w z c» Lu � r- uw O Q (L f� Q ml a T E Q W � � LoQz o z 0 ' U, Is- —_ LL.l k� 31 IL 0 LEI LEIcc 0 j0 I LI1 Ln �0 L13 N 10 r— Lo IL Ul s cr Ln ILL O State of North Carolina Department of Environmental Quality Division of Water Resources DWR P� 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ® If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En ig neer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ® Submit the most recently issued existing permit. ® Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ® Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ® Developers of lots to be sold ® Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality DI-11 R Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by MR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Oxmoor Aprtments. LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name:_Ziyh { S ® per 15A NCAC 02T .0I06(b) Title: 49fwwj AtDKSGr AK. sty 4. Applicant's mailing address: 820 Shades Creek Parkway, Suite 2300 City: Birmingham State: Alabama Zip: 35209- 5. Applicant's contact information: Phone number: (205) 877-3199 Email Address: II. PROJECT INFORMATION: 1. Project name: Retreat at Arden Farms 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Buncombe 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.475362' Longitude:-82.567271' 5. Parcel ID (if applicable): 9634-87-1028 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Jason Foster, PE License Number: 047671 Firm: Civil Design Concepts, PA Mailing address: 168 Patton Avenue City: Asheville State: NC Zip: 28801-_ Phone number: (828) 252-5388 Email Address: jfosteracdc og com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Water Reclamation Facility Owner Name: MSD of Buncombe County Permit Number: NCO024911 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQCS00004 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): MSD of Buncombe County Collection System FORM: FTA 04-16 Page 1 of 5 VL GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ® Yes ❑No ❑N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ® Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) 4 Is there a Pretreatment Program in effect? ❑ Yes [—]No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ®No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow',b No. of Units Flow Residential 120 gal/day per bedroom 1248 150000 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 150000 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ® Flow has already been allocated in Permit Number: 2018207 ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 661 DIP 8 1814 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: ARDEN FARMS PUMP STATION 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.474058' Longitude:-82.564742' 3. Design flow of the pump station: 0.15 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 140 gallons per minute at 105 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 4 1373 PVC 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(Q) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee ➢ If noncompliance with 02T.0305( or (a), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ❑ Yes ® No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ❑ No ® N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: Jason Foster, PE attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): Authority's name & title from Application Item 1.3.) �N CARo�''% SEAL 04767�i5 "MI iNEo F /A1SO\A attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Q Signature: ® Date: C Z I FORM: FTA 04-16 Page 5 of 5 VIII. PUMP STATION DESIGN CRITERIA (If applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: ARDEN FARMS BUILDING #3000 PUMP STATION 2. Approximate Coordinates (decimal Degrees): Latitude: 35.47632K Longitude:-82.565756' 3. Design flow of the pump station: 0.00084 million gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 13 gallons per minute at 14 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 4 75 PVC STATE OF NORTH CAROLINA COUNTY OF BUNCOMBE Permit No. DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this 25th day of OCTOBER 2019 , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and OXMOOR APARTMENTS, LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in BUNCOMBE County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as RETREAT AT ARDEN FARMS (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Enter Proposed Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Quality has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 02/03 Page 1 of 2 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit may require as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT COMMISSION Coleen H. Sullins, Director Division of Water Quality (Date) OXMOOR APARTMENTS, LLC Name o EVELOPER Bv: MIAQX SIGNHERE (Signature) -T►Wro" —0- T%Hts, Ar4rz pep/ew/GT(�lP/ SIGNHERE Print Name and Title OCTOBER 25th 23rd 2019 (Date) FORM: DEV 02/03 Page 2 of 2 State of North Carolina Department of Environment Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications Division of Water Resources (FTSE-04-16) Entity Applicant Name: STEPHENBEVERIDGE Project Name for which flow is being requested: 2018207 - RETREAT AT ARDEN FARMS(aka LONG SHOALS HORSE FAR More than one ME may be required for a single project if the owner of the WWTP is not responsible for al! pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Water Reclamation b. WWTP Facility Permit #: NCO024911 c. WWTP facility's permitted flow: d. Estimated obligated flow not yet tributary to WWTP: e. WWTP facility's actual avg flow: f. Total flow for this specific request: g. Total actual and obligated flows to the facility: 40 20.7596 0.1248 28.7883 All flows are in MGD h. Percent of permitted flow used: 72% 11. Complete this section for each pump station you are responsible for along the route of this proposed water flow. List pump stations located between the project connection point and the WWTP (A) (B) (C) (D)=(B+C) Design Approx. Obligated, Not Total Current Pump Station Firm Average Daily Current Avg. Yet Tributary Flow Plus (Name or Capacity,* Flow** (Firm / Daily Flow, Daily Flow, Obligated Flow Number) MGD pf) MGD MGD MGD Carrier Bridge 22.600 9.040 7.358 2.3748 9.733 Clayton Road 1.313 0.525 0.150 0.2738 0.423 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <= 0. Downstream Facility Name (Sewer): MSD of Buncombe County Collection System Downstream Permit Number: WQCS00004 (E)=(A-D) Available Capacity *** -0.693 0.102 111. Certification Statement: 1 —1-1 b`Grllcira-( certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated alon�ute to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data . This certification applies to those items listed above in Sections 1 and 11 plus all attached planning assessment addendums for which 1 am the responsible pa5P-�. igrtatpre of this forVindicateslacceptance of this wastewater flow. Page 1 of 1 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 24.4 % and 2.3748 MGD of the Available Capacity (E) in Pump Station Carrier Bridge ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.177 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Carrier Bridge PS Replacement is in design or under construction with planned completion in late 2023 ; and/or d. The following applies: The French Broad Interceptor - Carrier Bridge PER (completed by CDM Smith in 2019 recommends replacing the existing pump station with a new 34 MGD pump station (expandable to 40 MGD) to accommodate future wastewater flows through 2070. The project will add approximately 12 MGD of additional firm capacity by late 2023. This project is incorporated into MSD's 10-yr Capital Improvement Plan which provides funding for land purchase (in FY 19/20) engineering design (FY 19/20 and FY 20/21), and construction (FY 21/22 and FY 22/23). Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing tcial Signature Page 3 of 6 FTSE 10-18 -USGS science for a changing world 82°37'30" 35°30' 39290C 27'; 25' 620 FI 35°22'3 82°37'30" " Produced by the United States Geological Survey North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid: Universal Transverse Mercator, Zone 17S 10 000-foot ticks: North Carolina Coordinate System of 1983 This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands. Imagery .............................................NAIP, October 2014 Roads ................................ U.S. Census Bureau, 2015 - 2016 Roads within US Forest Service Lands.............FSTopo Data with limited Forest Service updates, 2012 - 2016 Names...............................................................GNIS, 2016 Hydrography ....................National Hydrography Dataset, 2014 Contours............................National Elevation Dataset, 2008 Boundaries ............ Multiple sources; see metadata file 1972 - 2016 Wetlands ......... FWS National Wetlands Inventory 1977 - 2014 U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY 6° 31" 116 MILS 0° 54' 16 MILS UTM GRID AND 2016 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET U.S. National Grid 100,000-m Square ID LV r77�1 The National Map USTopo 35' 32'30" 35' SCALE 1:24 000 1 0.5 0 KILOMETERS 1 2 1000 500 0 METERS 1000 2000 1 0.5 0 1 MILES 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET CONTOUR INTERVAL 20 FEET NORTH AMERICAN VERTICAL DATUM OF 1988 This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011. A metadata file associated with this product is draft version 0.6.19 32'30" NORTH • CAROLIN QUADRANGLE LOCATION 1 Enka 1 2 3 2 Asheville 3 Oteen 4 5 4 Dunsmore Mountain 5 Fruitland 6 Pisgah Forest 6 7 8 7 Horse Shoe 8 Hendersonville ADJOINING QUADRANGLES SKYLAND QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES 82°30' °^^ 35°30' 29 i0 000 =ET 27 26 27'30" '24 '23 '22 '21 25' '20 '19 '18 '17 '16000mN 35°22'30" ` 82°30' ROAD CLASSIFICATION Expressway Local Connector N 7 Secondary Hwy Local Road co Ramp 4WD N . Interstate Route US Route O State Route Y M FS Primary Route O FS Passenger FS High N X Route Clearance Route O � Check with local Forest Service unit M co for current travel conditions and restrictions. v co O r` u- SKYLAND, NC ZQ 2016 z z MS D Web Map 1 in = 600 ft Author: MSD of Buncombe County GIS Date: 91412018 The Metropolitan Sewerage District of Buncombe County, NC has prepared these maps based on best available information for use in assisting District maintenance work, service area analysis, and planning. The District does not warrant the accuracy of any of the information shown. Field verification is advised for all information shown on the maps or included with manhole data. No guarantee is given as to the accuracy or currency of any of the data. Therefore, in no event shall the District be liable for any special, indirect, or consequential damages or any damages whatsoever resulting from loss of use, data, or profits, whether in an action of contract, negligence, or other action, arising out of or in connection with the use of the information herein provided. Grid shown is North Carolina State Plane Coordinate System NAD 1983 (North American Datum 1983). Project name: Arden Farm Sewer Customer's name: Civil Design Concepts Customer contact: Jason Foster Voltage: 277/480 Application: Construction Phase: 3 Emissions Requirement: Stationary emergency Frequency: 60Hz (US EPA) Altitude: 500 Feet Alt. Temp. Rise Duty: 130°C Standby Max. Ambient Temp.: 85 Degrees F Qty of Gensets: 1 Min. Genset Loading : 10 Fuel type: Natural gas Max. Genset Loading : 100 Country : United States Site ... requirements Running kW: 31.26 Max. Starting kW: 41.95 in step 2 Running kVA: 37.77 Max. Starting kVA: 89.25 in step 2 Running P.F.: 0.83 Generator selection 4P10X Rated kW: Genset Model: KG50 Alternator: 53.00 Engine: KG6208 Alternator Leads: 12 Site Rated kW : 52.29 Emission level: EPA Certified Alt. Starting kVA at 275.00 UL 2200 Certified 35% V dip: BHP: 103.00 Cal Alt Temp rise 80C Displacement: 378.00 with site loads: RPM: 1800 Excitation System : PMG Voltage Dip Limit: 30.00 % Calculated Voltage Dip: 16.28 % Frequency Dip Limit: 10.00 % Calculated Frequency Dip: 9.38 % Harmonic Distortion 10.00 % Calculated Harmonic 0.00 % Limit: Distortion: Calculated Genset % Loaded: 59.78 % The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 1 The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 Model : KG50, Alternator: 4P10X Step # 1 Qty Run Start Volt Dip Freq Dip Volt. % % Dist. % LkW kVA PF I kW kVA PIP L Misc. Linear Load 1 5.00 5.00 1.00 5.00 5.00 1.00 Site Lights 3 Phase Step Total 5.00 5.00 1.00 5.00 5.00 1.00 1.13 1.08 0.00 Cum.Total 5.00 5.00 1.00 0.00% -020% -0.40 % -0-50% -0.80% -1.00% -120 % —Voltage —Frequency The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 Step # 2 Motor Pump 15.00 HP 3 Phase Motor code : G Loaded NEMA Design across the line Step Total Cum.Total Qty Run Start Volt Dip Freq Dip Volt. % % Dist. % kW kVA PF kW WA PIP 1 12.94 16.44 i 0.79 41.95 i 89.25 0.47 12.94 I 16.44 I 0.79 I 41.95 I 89.25 I 0.47 I 16.28 I 9.38 I 0.00 17.94 20.60 0.87 0.00% -2.00% -4.00% -6-00% -8.00% -10.00% -12.00% -14.00% -16 00% -18.00% —Voltage —Frequency The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 4 Step # 3 Motor Panel Fan 5.00 HP 3 Phase Motor code : H Loaded NEMA Design across the line Step Total Cum.Total Qty Run Start Volt Dip Freq Dip Volt. % % Dist. % kW kVA PF kW kVA PF 1 4.55 6.07 i 0.75 18.43 i 33.50 0.55 1 4.55 6.07 0.75 I 18.43 I 33.50 I 0.55 I 6.35 I 4.17 I 0.00 22.49 26.57 0.85 0.00% -1.00% -2.00% -3.00% -4.00% -5.00% -6-00% -7.00% — Voltage — Frequency The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 5 Step # 4 Motor Scrubber 10.00 HP 3 Phase Motor code : G Loaded NEMA Design across the line Step Total Cum.Total Grand Total Qty Run Start Volt Dip Freq Dip Volt. % % Dist. % kW kVA PF kW kVA PIP 1 8.78 11.25 1 0.78 29.75 1 59.50 0.50 1 I 1 8.78 1 11.25 1 0.78 I 29.75 59.50 I 0.50 31.26 1 37.77 1 0.83 31.26 1 37.77 1 0.83 1 11.27 I 6.80 0.00 16.28 9.38 0.00 0.00% -2.00% -4.00% -6-00% -8.00% -10.00% -12.00% —Voltage —Frequency The analysis provided from Power Solutions Center are for reference only. The installer must work with the local distributor and technician to confirm actual requirements when planning the installation. Kohler Co. reserves the right to change design or specifications without notice and without any obligation or liability whatsoever. Kohler Co. expressly disclaims any responsibility for consequential damages. Software version: 1.0029.5.32 Tuesday, March 26, 2019 6 KOHLER. Model: KG50 190-600 V Gas 0 9001 EPA -Certified for Stationary 4 KOHLER, Emergency Applications NATIONALLY REGISTERED Ratings Range 60 Hz 50 Hz Standby: kW 53-53 44-44 kVA 53-66 44-55 Generator Set Ratings Standard Features • Kohler Co. provides one -source responsibility for the generating system and accessories. • The generator set and its components are prototype -tested, factory -built, and production -tested. • The 60 Hz generator set offers a UL 2200 listing. • The generator set accepts rated load in one step. • The 60 Hz generator set meets NFPA 110, Level 1, when equipped with the necessary accessories and installed per NFPA standards. • A one-year limited warranty covers all generator set systems and components. Two- and five-year extended limited warranties are also available. • Alternator features: The unique Fast -Response® X excitation system delivers excellent voltage response and short-circuit capability using a rare-earth, permanent magnet (PM) -excited alternator. The brushless, rotating -field alternator has broadrange reconnectability. Natural Gas LP Gas 130°C Rise 130°C Rise Standby Rating Standby Rating Alternator Voltage Ph Hz kW/kVA Amps kW/kVA Amps 120/208 3 60 53/66 184 53/66 184 127/220 3 60 53/66 174 53/66 174 120/240 3 60 53/66 159 53/66 159 120/240 1 60 53/53 221 53/53 221 139/240 3 60 53/66 159 53/66 159 220/380 3 60 53/66 101 53/66 101 277/480 3 60 53/66 80 53/66 80 4P8X 347/600 3 60 53/66 64 53/66 64 110/190 3 50 44/55 168 44/55 168 115/200 3 50 44/55 159 44/55 159 120/208 3 50 44/55 153 44/55 153 110/220 3 50 44/55 145 44/55 145 110/220 1 50 44/44 200 44/44 200 220/380 3 50 44/55 84 44/55 84 230/400 3 50 44/55 80 44/55 80 240/415 3 50 44/55 77 44/55 77 120/208 3 60 53/66 184 53/66 184 127/220 3 60 53/66 174 53/66 174 120/240 3 60 53/66 159 53/66 159 120/240 1 60 53/53 221 53/53 221 139/240 3 60 53/66 159 53/66 159 220/380 3 60 53/66 101 53/66 101 277/480 3 60 53/66 80 53/66 80 4P10X 347/600 3 60 53/66 64 53/66 64 110/190 3 50 44/55 168 44/55 168 115/200 3 50 44/55 159 44/55 159 120/208 3 50 44/55 153 44/55 153 110/220 3 50 44/55 145 44/55 145 110/220 1 50 44/44 200 44/44 200 220/380 3 50 44/55 84 44/55 84 230/400 3 50 44/55 80 44/55 80 240/415 3 50 44/55 77 44/55 77 4Q8X 120/240 1 60 53/53 221 53/53 221 110/220 1 50 44/44 200 44/44 200 4Q10X 120/240 1 60 53/53 221 53/53 221 110/220 1 50 44/44 200 44/44 200 RATINGS: All three-phase units are rated at 0.8 power factor. All single-phase units are rated at 1.0 power factor. Standby Ratings: The standby rating is applicable to varying loads for the duration of a power outage. There is no overload capability for this rating. Ratings are in accordance with ISO-8528-1 and ISO-3046-1. For limited running time and continuous ratings, consult the factory. Obtain technical information bulletin (TIB-101) for ratings guidelines, complete ratings definitions, and site condition derates. The generator set manufacturer reserves the right to change the design or specifications without notice and without any obligation or liability whatsoever. For dual fuel engines, use the natural gas ratings for both the primary and secondary fuels. G4-280 (KG50) 11/18e Alternator Specifications Specifications Alternator Manufacturer Kohler Type 4-Pole, Rotating -Field Exciter type Brushless, Rare -Earth Permanent Magnet Leads: quantity, type 4P8X, 4P10X 12, Reconnectable 4Q8X, 4Q10X 4, 110-120/220-240 V Voltage regulator Solid State, Volts/Hz Insulation: NEMA MG1 Material Class H Temperature rise 130°C, Standby Bearing: quantity, type 1, Sealed Coupling Flexible Disc Amortisseur windings Full Voltage regulation, no-load to full -load Controller Dependent One-step load acceptance 100% of Rating Unbalanced load capability 100% of Rated Standby Current Peak motor starting kVA: (35% dip for voltages below) 480 V, 400 V 4P8X (12 lead) 255 (60 Hz), 215 (50 Hz) 480 V, 400 V 4P1 OX (12 lead) 275 (60 Hz), 220 (50 Hz) 240 V, 220 V 4Q8X (4 lead) 120 (60 Hz), 96 (50 Hz) 240 V, 220 V 4Q1 OX (4 lead) 144 (60 Hz), 121 (50 Hz) Engine • The unique Fast -Response® X excitation system delivers excellent voltage response and short-circuit capability using a rare-earth, permanent magnet (PM) -excited alternator. • The brushless, rotating -field alternator has broadrange reconnectability. • NEMA MG1, IEEE, and ANSI standards compliance for temperature rise and motor starting. • Sustained short-circuit current of up to 300% of the rated current for up to 10 seconds. • Sustained short-circuit current enabling downstream circuit breakers to trip without collapsing the alternator field. • Self -ventilated and dripproof construction. Application Data Engine Specifications 60 Hz 50 Hz Manufacturer Kohler Engine: model, type KG6208 6.2 L Natural Aspiration Cylinder arrangement V-8 Displacement, L (cu. in.) 6.2(378) Bore and stroke, mm (in.) 101.6 x 95.25 (4.00 x 3.75) Compression ratio 10.5:1 Rated rpm 1800 1500 Max. power at rated rpm, kW (HP) 77.0 (103) 64.3 (86) Cylinder head material Cast Aluminum Piston type and material High Silicon Aluminum Crankshaft material Cast Iron Valve (exhaust) material Forged Steel Governor type Electronic Frequency regulation, no-load to full -load Isochronous Frequency regulation, steady state ±1.0% Frequency Fixed Air cleaner type, all models Dry Exhaust Exhaust System 60 Hz 50 Hz Exhaust manifold type Dry Exhaust flow at rated kW, m3/min. (cfm) 11.7 (414) 9.8(345) Exhaust temperature at rated kW, dry exhaust, °C (°F) 677 (1250) Exhaust temperature at rated kW, dry exhaust, °C (°F) 593 (1100) Maximum allowable back pressure, kPa (in. Hg) 10.2 (3.0) Exhaust outlet size at engine hookup, mm (in.) 76 (3.0) OD Engine Electrical Engine Electrical System 60 Hz 50 Hz Ignition system Electronic, Distributor Ignition system Electronic Battery charging alternator: Ground (negative/positive) Negative Volts (DC) 12 Ampere rating 130 Starter motor rated voltage (DC) 12 Battery, recommended cold cranking amps (CCA): Qty., rating for -18°C (0°F) 1,630 Battery voltage (DC) 12 Fuel Fuel System 60 Hz 50 Hz Fuel type Natural Gas, LP Gas, or Dual Fuel Fuel supply line inlet 1 NPTF Natural gas fuel supply pressure, kPa (in. H2O) 1.74-2.74 (7-11) LPG vapor withdrawal fuel supply pressure, kPa (in. H2O) 1.24-2.74 (5-11) Dual fuel engine, LPG vapor withdrawal fuel supply pressure, kPa (in. H2O) 1.24(5) Fuel Composition Limits * Nat. Gas LP Gas Methane, % by volume 90 min. — Ethane, % by volume 4.0 max. — Propane, % by volume 1.0 max. 85 min. Propene, % by volume 0.1 max. 5.0 max. C4 and higher, % by volume 0.3 max. 2.5 max. Sulfur, ppm mass 25 max. Lower heatin value, MJ/m3 (Btu/ft ), min. 33.2 (890) 84.2 (2260) * Fuels with other compositions may be acceptable. If your fuel is outside the listed specifications, contact your local distributor for further analysis and advice. G4-280 (KG50) 11/18e Lubrication Controllers Lubricating System 60 Hz 50 Hz Type Full Pressure Oil pan capacity, L (qt.) § 5.7 (6.0) Oil pan capacity with filter, L (qt.) § 7.1 (7.5) Oil filter: quantity, type § 1, Cartridge § Kohler recommends the use of Kohler Genuine oil and filters. Cooling Radiator System 60 Hz 50 Hz Ambient temperature, °C (°F) * 50 (122) Engine jacket water capacity, L (gal.) 7.3 (1.93) Radiator system capacity, including engine, L (gal.) 20.8 (5.5) Engine jacket water flow, Lpm (gpm) 129 (34.1) 108 (28.5) Heat rejected to cooling water at rated kW, dry exhaust, kW (Btu/min.) 61.7 (3510) 53.3 (3030) Water pump type Centrifugal Fan diameter, including blades, mm (in.) 533 (21) Fan, kWm (HP) 2.2 (2.9) 1.3 (1.7) Max. restriction of cooling air, intake and discharge side of radiator, kPa (in. H2O) 0.125 (0.5) * Enclosure with enclosed silencer reduces ambient temperature capability by 5°C (9°F). Operation Requirements Air Requirements 60 Hz 50 Hz Radiator -cooled cooling air, m3/min. (scfm) T 136 (4800) 113 (4000) Combustion air, m3/min. (cfm) 4.6(163) 3.9(136) Heat rejected to ambient air: Engine, kW (Btu/min.) 30.9 (1760) 26.5 (1510) Alternator, kW (Btu/min.) 7.7(440) 6.9(390) T Air density = 1.20 kg/m3 (0.075 Ibm/ft3) Fuel Consumption $ 60 Hz 50 Hz Natural Gas, m3/hr. (cfh) at % load Standby Ratings 100% 24.9 (879) 20.4 (721) 75% 19.7 (696) 14.8 (524) 50% 13.9 (490) 9.8 (345) 25% 7.9 (277) 5.8 (204) LP Gas, m3/hr. (cfh) at % load Standby Ratings 100% 9.5 (337) 8.5 (300) 75% 7.6 (267) 5.7 (199) 50% 5.1 (178) 4.2 (146) 25% 3.2 (113) 2.7 (96) $ Nominal fuel rating: Natural gas, 37 MJ/m3 (1000 Btu/ft.3) LP vapor, 93 MJ/m3 (2500 Btu/ft.3) LP vapor conversion factors: 8.58 ft.3 = 1 lb. 0.535 m3 = 1 kg. 36.39 ft.3 = 1 gal. 0 10 OOoO O O Ad a APM402 Controller Provides advanced control, system monitoring, and system diagnostics for optimum performance and compatibility. • Digital display and menu control provide easy local data access • Measurements are selectable in metric or English units • Remote communication thru a PC via network or serial configuration • Controller supports Modbus° protocol • Integrated hybrid voltage regulator with ±0.5% regulation • Built-in alternator thermal overload protection • NFPA 110 Level 1 capability Refer to G6-161 for additional controller features and accessories. G4-280 (KG50) 11/18e KOHLER, Standard Features • Alternator Protection • Battery Rack and Cables • Electronic, Isochronous Governor • Gas Fuel System (includes fuel mixer, electronic secondary gas regulator, gas solenoid valve, and flexible fuel line between the engine and the skid -mounted fuel system components) • Integral Vibration Isolation • Local Emergency Stop Switch • Oil Drain Extension • Operation and Installation Literature Available Options KOHLER CO., Kohler, Wisconsin 53044 USA Phone 920-457-4441, Fax 920-459-1646 For the nearest sales and service outlet in the US and Canada, phone 1-800-544-2444 KOHLERPower.com Miscellaneous ❑ Air Cleaner Restrictor Indicator ❑ Certified Test Report ❑ Engine Fluids (oil and coolant) Added ❑ Rated Power Factor Testing ❑ Rodent Guards ❑ Open Unit Accessory Kit (stone guards, radiator duct flange, flexible exhaust) Literature ❑ General Maintenance ❑ NFPA 110 ❑ Overhaul ❑ Production Approvals and Listings Warranty ❑ CSA Approval ❑ ❑ IBC Seismic Certification 2-Year Basic Limited Warranty ❑ UL 2200 Listing ❑ 5-Year Basic Limited Warranty ❑ Hurricane Rated Enclosure ❑ 5-Year Comprehensive Limited Warranty Enclosed Unit ❑ Sound Enclosure (with enclosed critical silencer) ❑ Weather Enclosure (with enclosed critical silencer) Open Unit ❑ Exhaust Silencer, Critical (kit: PA-352663) ❑ Flexible Exhaust Connector, Stainless Steel Fuel System ❑ Dual Fuel NG/LPG (automatic changeover) ❑ Flexible Fuel Line (required when the generator set skid is spring mounted) ❑ Fuel Filter Kit Controller ❑ Common Fault Relay ❑ Two Input/Five Output Module ❑ Remote Annunciator Panel ❑ Remote Emergency Stop ❑ Run Relay ❑ Manual Speed Adjust Cooling System ❑ Block Heater, 1500 W, 110-120 V Required for ambient temperatures below 10°C (50°F) ❑ Radiator Duct Flange Electrical System ❑ Alternator Strip Heater ❑ Battery ❑ Battery Charger ❑ Battery Charger Temperature Compensation ❑ Battery Heater ❑ Line Circuit Breaker (NEMA1 enclosure) ❑ Line Circuit Breaker with Shunt Trip (NEMA1 enclosure) Other Options Dimensions and Weights Overall Size, L x W x H, mm (in.): Wide Skid 2200 x 1040x 1170 (86.6 x 40.9 x 46.1) Narrow Skid 2200 x 864 x 1170 (86.6 x 34.0 x 46.1) Weight (radiator model), wet, kg (lb.): 862 (1900) T_ F-1 H I- W --1 6L NOTE: This drawing is provided for reference only and should not be used for planning DISTRIBUTED BY- © 2018 by Kohler Co. All rights reserved. G4-280 (KG50) 11/18e 4s Metropolitan Sewerage District of Buncombe County, North Carolina Allocation Approval This approval is not to be used to obtain a building permit and is for gravity sewer extension only. Applicant: STEPHEN BEVERIDGE Date: 9/18/2018 Company: CIVIL DESIGN CONCEPTS, PA Mailing Address: 168 PATTON AVENUE, ASHEVILLE, NC 28801 Phone: 8282525388 (Work) Project #: 2018207 Project Name: LONG SHOALS HORSE FARM APARTMENTS Project Location: LONG SHOALS ROAD PIN: 9634862977 9634871028 9634873103 9634873671 9634867547 MSD of Buncombe County has approved your request for 124,800 GIRD The connection point (manhole #) will be TBD The project will consist of (416) APARTMENTS Your final aooroval is contingent upon comDliance of the items below: A GRAVITY ONLY PUBLIC SEWER EXTENSION IS REQUIRED TO SUBJECT PARCEL. Please consult the Sewer Extension Manual for Developers on our website www.msdbc.org. If you still have questions after consulting the website please contact Kevin Johnson at (8 28)-254-9646. A.fully executed NCDOT 3-party encroachment agreement will be required before construction of sewer extension or MSD sewer replacement may begin within Long Shoals Road and Spring Valley Dr rights of way (currently proposed). This project will require a private sewer extension permit from NC DEQ. MSD will require copy of this permit prior to issuance of any building permits. Comments: MSD will require copy of engineer certification and as -built drawing of private sewer system prior to close-out and release of C.O.s. The North Carolina Department of Environmental Quality (NCDEQ) requires MSD to issue this approval based on line condition/capacity of the receiving sewer and remaining plant capacity. This allocation approval will expire on 09/18/2019 if no construction has started. If you have any questions, please contact MSD. l� Kev4 Johnson MSD Planning and Development NORTH CAROLINA a sDepartment of the Secretary of State CERTIFICATE OF AUTHORITY I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that OXMOOR APARTMENTS, L.L.C. having filed on this date an application conforming to the requirements of the General Statutes of North Carolina, a copy of which is liereto attached, is hereby granted authority to transact business in the State ofNorth Carolina. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 17th day of April, 2019. Scan to verify online. Document Id: C201910606556 Secretary of State Verify this certificate online at http://www.sosnc.gov/verification NORTH CAROLINA d Department of the Secretary of State `fL.(5'n wn3 To all whom these presents shall come, Greetings: I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify the following and hereto attached to be a true copy of APPLICATION FOR CERTIFICATE OF AUTHORITY Ka OXMOOR APARTMENTS, L.L.C. the original of which was .filed in this office on the 17th day of April, 2019. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 17th day of April, 2019. Scan to verify online. Certification# C201910606556-1 Reference# C201910606556-1 Page: 1 of Secretary of State Verify this certificate online at http://www.sosno.bov/verification State ofNorth Carolina Department of the Secretary of State SOSID: 1832875 Date Filed: 4/17/201.9 2:15:00 PM Elaine F. Marshall North Carolina Secretary of State C2019 106 06556 APPLICATION FOR CERTIFICATE, OF AUTHORITY FOR LIMITED LIABILITY COMPANY Pursuant to ¢SM-7-03 of the General Statutes ofNorth Carolina, the undersigned limited liability company hereby applies for a Certificate of Authodty to traasactbusiness in the State of North Carolina, and for that purpose submits the fallowing: 1. The name of the limited liability company ie®Xn100rApartments, L.L.C. and if fhe limited liability company name is unavailable for use in the State of Nortb Carolina, theaamc the limited liability company wishes to use is 2. Thostate orcouafryunder whose laws the limitedliability company was formed inAlabama 3. Principal office informstion: (Select ether a or b.) a. ® The limited liability company has a prindpalofice. The principai'offico tdephone number:. 2055-877-3199 The street address and county of the. principal office of the limited liability company is: Number and Street: 820 Shades Creek Parkway, Suite 2300 Birmingham gte.ALp�,35209r. Jefferson The mailing add ress,ifdifferent from tha street address, of the, ptincipal office of the corp ormflonia: Number and Shut, City: State;— Zip Code: County: b, ❑ The limited liability company does not have a prino[pol office, 4. The nun Otherogistoredagent :inthe State, ofNorth Carolina is: Paige W. Perry The street address and county of the registered agent's office in the State of North Carolina is: Namberandstrost: 3130 Fairhill Drive, Suite 108 Ch.Ralelgh state: NC ZipCode:276`12 eonnw. WAKE 6. The North Caroline mailing address, lfdiff"entfrom the srred address, ofthe registered agents office in the State of North Carolina is: Number and City: State: NC BUSINESS REGISTRATION DIVISION (Revised July 2017) Zip Code: County: P.O. BOX 29622 RALEIGH, NC27626-0622 (Form L-09) Certification# C201910606556-1. Reference# C201910606556- Page: 2 of 4 APPLICATION FOR CERTIFICATE OF AUTHORITY Pago 2 7. The namos, titles, and usual business addresses of the -current company officials of the limited liability company are: (use attachment tf necessary) (T7ris document must be signed by a person listed in item 7..) Name and Tltle Business Address Ingram D. Tynes ,Manager 820 Shades Creek Pkwy, Ste, 2300, Sham, AL 35209 S. Attached is a cartificate of existence (or document of similar import), duly authenticated by the secretary of state or other official having custody of limited liability company records in the state or country of formation. The Certificate ofExIstence must be less thandx monthsold. A nbatoconv of the certffication cannot beaccentad. 9. If the limited liability company is required to use a fictitious name in. order to transact business in this State, a copy of the resolution ofits managers adopting the fictitious name is attached 10, (Optional): Pleaseprovide a business e-mail achy Privacy Redaction The Secretary of State's office will a -mail the bustress au mancauy at me address pro�edmove aocc w en a document is filed. The e-mail provided wffl not ba riew %ble pnthe, w to For Moro information on why this service is offered, pleaso sec the instructions for this document 11. This application will be affective upon filing, unless a delayed date "or time is specified: This the 16ih days£ April 20 1 9 Oxmoor Apartments, L.L.C. JK rpeoLimiiedLiabilityCompany . Signature of company Official Ingram D. Tynes, Manager 7jppe or Print Name and Title Notes: 1. Filing fee Is S250.'Ibis document must be filed with the Secretary of State. BUSINESS REGISTRATION DIVISION (Sevised July 2017) P.O, BOX 29622 RALBIGB, NC 27626-0622 (Form L-09) Certification# C201910606556-1 Reference# C201910606556- Page: 3 of 4 John H. Merrill Secretary of State P.O. Box 5616 Montgomery, AL 36103-5616 STATE OFALABAMA 1, John H. Merrill, Secretary of State of Alabama, having custody of the Great and Principal Seal of said State, do hereby certify that the entity records on file in this office disclose that Oxmoor Apartments; L.L.C. was formed in Jefferson County, Alabama on December 6, 1995. The Alabama Entity Identification number for this entity is 652-928. I further certify that the records do not disclose that said entity has been dissolved, cancelled or terminated. In Testimony Whereof, I have hereunto set my hand and affixed the Great Seal of the State, at the Capitol, in the city of Montgomery, on this day. 04/17/2019 Date j 20190417000005778 John H. Merrill Secretary of State Certification# C201910606556-1 Reference# C201910606556- Page: 4 of 4