Loading...
HomeMy WebLinkAboutNCG030082_CEI_20191108ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mann + Hummel Purolator Filters Na LLC Attn: Joshua Speller, Plant Manager 3200 Natal Road Fayetteville, NC 28306 NORTH CAROLINA Environmental Quality November 8, 2019 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG030000 Mann + Hummel Purolator Filters Na LLC Mann + Hummel Purolator Filters NA, LLC, Certificate of Coverage NCG030082 Cumberland County Dear Mr. Speller: On October 29, 2019, a site inspection was conducted for the Mann + Hummel Purolator Filters NA, LLC facility located at 3200 Natal Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Ron Ditchie, Facility Manager and Ms. Amy Mateo, HSE Manager were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG030000 under Certificate of Coverage NCG030082. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Unnamed Tributary to Buckhead Creek (Buckland Creek), a Class C waterbody in the Cape Fear River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG030000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@ncdenr.gov. Sincerely, Melissa Joyner Environmental Specialist DEMLR Enclosure: Compliance Evaluation Inspection ec: Ronald Ditchie, Facility Manager (via email) Amy Mateo, HSE Manager (via email) cc: FRO — DEMLR, Stormwater Files North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources -DEQ! Fayetteville Regional Office 1 225 Green Street, Suite T141 Fayetteville, North Carolina 28301 910.433.3300 Compliance Inspection Report Permit: NGG030082 Effective: 11/01/18 Expiration: 05/31/21 Owner; Mann+Hummel Purolator Filters Na LLC SOC: Effective: Expiration: Facility: Mann+Hummel Purolator Filters NA, LLC 3200 Natal Rd County: Cumberland Region: Fayetteville Fayetteville NC 28306 Contact Person: Joshua Speller Title: Phone: 910-426-4217 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): on -Site Representative(s): On -site representative Amy Mateo 910-426-4841 On -site representative Ronald Ditchie 910-426-4299 Related Permits: Inspection Date: 10/29/2019 EntryTime: 01:OOPM Exit Time: 04:40PM Primary Inspector: Melissa A Joyner Phone: Secondary Inspector($): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit; NCGO30082 Owner - Facility: Mann+Hummel Purolator Filters Na LLC Inspection Date: 10/29/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Mr. Ron Ditchie, Facility Manager and Ms.Amy Mateo, HSE Manager at the Mann + Hummel Purolator Filters NA, LLC facility. She reviewed the Stormwater Pollution Prevention Plan. The Site Map needs to be updated to indicate the percentage of each drainage area which is impervious. Per the conditions in General Permit NCG030000, there should be documentation annually that the facility has had spills and the corrective actions taken to mitigate spill impacts or had no spills over the past three years. This information was recorded in 2018. Also, there should be documentation, annually, that Outfalls #1 and #2 have been evaluated for the presence of non-stormwater discharges. Records for Annual Employee Training were noted for 2018. Additional documentation of employee training was not able to be located during the inspection but will be sent to the Inspector at a later date. The Analytical and Qualitative Monitoring Records were reviewed. Although there have been no discharges from Outfall #2, the Annual Stormwater Discharge Monitoring Report should be marked "No Discharge" and submitted to the Division of Water Quality, to the address on the back of the form. The facility grounds were inspected including Outfalls #1 and #2 which appeared well -maintained. There was a catch basin located near the "Components Stamping Area" which needs protection. It is recommended that after the protection is installed that it be inspected during the weekly facility's inspections of the Best Management Practices. Page 2 of 3 Permit: NCG030082 Owner - Facility: Mann+Hummel Purolator Filters Na LLC Inspection Date: 10/29/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? E ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring - Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3