Loading...
HomeMy WebLinkAboutNCG140159_Inspection Report_20191112ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Southern Concrete Materials Attention: Jeff lamm Post Office Box 5395 Asheville, North Carolina 28813 NORTH CAROLINA Environmental Quality November 12, 2019 Subject: Compliance Evaluation Inspection Permit: NCG140000 Certificate of Coverage: NCG140159 Tansylvania County, North Carolina Dear Mr. Lamm: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 23, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer L Isaiah Reed, CPS CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ7> North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 701 Swannanoa, North Carolina 28778 noamcaawrw °aou°°°"°'�inanh10ie1v 828.296.4500 Permit: NCG140159 SOC: County: Transylvania Region: Asheville Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 owner: Southern Concrete Materials Effective: Expiration: Facility: Southern Concrete Mat-Transylv Ecusta Rd Contact Person: James F Combest Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/23/2019 EntryTime: 02:OOPM Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Pisgah Forest NC 28768 Phone: 828-253-6421 Phone: Exit Time: 03:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/wastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG140159 Owner -Facility: Southern Concrete Materials Inspection Date: 10123/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On October 23, 2019 this facility was inspected for compliance. I met with Marty Smith on site. During the inspection, the following items were noted: 1) the site map did not include all industrial areas, property boundaries, and surface waters as required by the NCG140000 General Permit. The permittee is directed to revise and update the site map to meet all requirements of the permit. 2) The Stormwater pollution prevention plan did include a list of all spills (or the notation that no spills have occurred) for the previous 3 years. 3) The secondary containment structure was constructed to hold any spills. A plastic pipe installed near the bottom of the wall would not allow for containment. the permittee is directed to modify the secondary containment on site to hold and contain any spills occurring within it. 4) An annual certification that all outfalls have been evaluated for the presence of non-stormwater discharge was not located during the inspection. The permittee is directed to begin conducting these evaluations or locate documentation if the evaluations are already being conducted. Please give the above items your immediate attention. This facility will be re -inspected on or after December 19, 2019. If the above items are not addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 permit: NCG140159 Owner -Facility: Southern Concrete Materials Inspection Date: 10/23/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ E ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ E ❑ ❑ Comment Page 3 of 3