HomeMy WebLinkAboutNCG110158_Inspection Report_20191108ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
November 8, 2019
Metropolitan Sewer District of Buncombe County
Attention: Roger Edwards
2028 Riverside Drive
Asheville, North Carolina 28804
Subject: Compliance Evaluation Inspection
Permit: NCG110000
Certificate of Coverage: NCG110158
Buncombe County, North Carolina
Dear Mr. Edwards:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on October 22, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Smcerel /
Isaiah Reed, C Q, CEPSCI, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NOHIH CPRlN1NP
828.296.4500
Compliance Insoection Reoort
Permit: NCG110158 Effective: 07/27/18 Expiration: 05/31/23 Owner: Metropolitan Sewerage District of Buncombe
County North Carolina
SOC: Effective: Expiration: Facility: French Broad River Water Reclamation Facility
County: Buncombe 2028 Riverside Dr
Region: Asheville
Asheville NC 28804
Contact Person: Peter C Weed Title:
Directions to Facility:
located west of future 126 in Woodfin, take the elk mountain rd exit west to riverside drive
System Classifications:
Primary ORC: Certification:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Phone: 828-225-8204
Phone:
Inspection Date: 10/22/2019 EntryTime: 01:15PM Exit Time: 02:30PM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Municipal WWTP > 1MGD, Stormwater Discharge, COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCG110158 Owner -Facility: Metropolitan Sewerage District of Buncombe County North Carolina
Inspection Date: 10122/2019 Inspection Type : Compliance Evaluation Reason for visit: Routine
Inspection Summary:
On October 22, 2019 this facility was inspected for compliance. i met with Roger Edwards on site. No major issues were
noted during the inspection. However, I recommend the following recommendations regarding the Stormwater Pollution
Prevention Plan:
1) It is recommended that the Qualitative reports be expanded to include a facility inspection in the same document. Due to
the nature and location of the monitoring point, additional observations around the facility (as discussed during the
inspection) would be beneficial.
2) A dedicated map just for the "Site Map" requirement in the SWPPP would allow for a more functional SWPPP.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG110158 Owner - Facility: Metropolitan Sewerage District of Buncombe County North Carolina
Inspection Date: 10/2212019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
N ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
N ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ❑ ❑
Comment
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
0 ❑ ❑ ❑
# Were all outfalls observed during the inspection?
0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
0 ❑ ❑ ❑
Comment
Page 3 of 3