Loading...
HomeMy WebLinkAboutNCC191995_NOI Application_20191108Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/19/2019 5:03:30 PM (NCG01 NOI Submission) Approve by Farkas, Jim J 9/20/2019 12:36:26 PM (Review- Construction NOI 16113) • The task was assigned to Farkas, Jim J by round robin distribution 9/19/2019 5:03 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 23, 2019 5:00 PM 9/19/2019 5:03 PM Submit by Garcia, Lauren V 11/8/2019 8:52:58 AM (Payment Verification for NCC191995) * Carl Stagle • Garcia, Lauren V assigned the task to Garcia, Lauren V 11/8/2019 8:52 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 1, 2019 5:00 PM 9/20/2019 12:36 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Lee Walker Heights 2. County* Buncombe 3. Highway or Street 50 Wilbar Avenue Address * Street name only is acceptable if no address number assigned yet 4. City or Township* Asheville 5. State * NC 117-8) sT.:2,i) it fiIi f_T1II a 10141 6. Zip Code* 28801 7. Latitude * Enter the latitude in decimal degrees 35.5858 8. Longitude * Enter the longitude in decimal degrees (MIST be negative) -82.5526 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/23/2019 Estimated Construction Project Start Date 10. Date to End* 04/30/2021 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial Gassification for Development 12. Acres to be 16.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 17.24 (acres)* 14. Post- 5.50 construction (Estimated) impervious area (acres) * NCC Project NCC-BUNCO-2019-Lee Walker Heights Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving French Broad River Wate rbody* %rre of waterbody into which stormuater runoff will discharge 15b. Waterbody 6-(54.75) Index No.* NC Waterbody Index Narrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Weaver Cooke Construction Name * 2. First Name* Michael ff Corporation, enter Registered Agent First l\b e 3. Last Name * Spafford ff Corporation, enter Registered Agent Last Barre 3b. Title Senior V.P. Operations 4. Permitee E-mail mspafford@weavercooke.com Address* 5. Permittee 336-378-7900 Telephone No.* 6. Permittee Mailing Street Address Address* 8401 Key Boulevard Address Line 2 City Greensboro Postal / Zip Code 27409-6000 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 8401 Key Boulevard Address Line 2 City Greensboro Postal / Zip Code 27409-6000 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Proiect Site Contact hforrration 1. Type of Non -Government Ownership* 2. Primary Site Kelley Contact - First Name * 3. Primary Site McClure Contact - Last Name * 4. Title Superintendent 5. Site Contact E- kmcclure@weavercooke.com mail Address* 6. Site Contact 828-506-3443 Telephone No.* 7. Organization Weaver Cooke Construction Name 8. Site Contact Street Address Mailing Address* 319 Biltmore Avenue Address Line 2 oty Asheville Pbstal / Zip Code 28801 9. Consultant Name (optional) Carl Slagle First and Last narre 10. Consultant E- cslagle@weavercooke.com mail This person will be copied on all correspondence. 11. Consultant 8282302453 Telephone No. State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/19/2019 Approved * 2. E&SC Plan Project BUNCO-2020-002 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Asheville (ARO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Lee Walker Heights - E&SC Plan Approval Letter 9- Approval 99.96KB 19-19. pdf letter/documentation Mist be RJF forrrat 6. NOI Certification Signed NOI Certification Form 9-19-19.pdf 90.02KB Form Mist be RJFformat This is an Express f• No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature rlr��a`' r�atc� Type Name * Michael J. Spafford Title Sr. V.P. Operations Organization Weaver Cooke Construction, LLC Date * 09/19/2019 F. Tracking and COC Info NOI Tracking No. 16113 NC Reference No. NCG01-2019-1995 Uses 'count number variable (incremented by SP) Certificate of NCC191995 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 1995 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)