HomeMy WebLinkAboutNC0077968_Compliance Evaluation Inspection_20191030ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Tim Horner
3073 Beaver Hill Drive
Burlington, NC 27215
NORTH CAROLINA
Environmental Quality
October 30, 2019
Subject: Compliance Evaluation Inspection Report
NPDES Permit NCO077968
Reedy Fork MHP WWTP, Alamance County
Dear Mr. Horner:
On October 4 2019, Paul DiMatteo of the Division of Water Resources (Division), Winston-Salem
Regional Office met with Anthony Montero, Operator in Responsible Charge (ORC), to conduct
a Compliance Evaluation Inspection of the above referenced wastewater treatment plant.
This inspection consists of (1) a review of the permit and accompanying documentation to
determine compliance with permit conditions, and (2) an on -site inspection of several collection
system components. The attached inspection form notes the areas that were evaluated for the
inspection, with any notable findings outlined as follows.
If you have any questions concerning this report please contact Paul DiMatteo at (336) 776-9691
or Lon Snider at (336) 776-9800.
Sincerely,
DocuSiiggned by:
LL_4,
l sMaCt
1 49 25C 4EA.
Lon m er, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Enclosures — Inspection Report
CC: WSRO Laserfiche Files
D North Carolina Department of Environmental Quality I Division of Water Resources
EQ�p
Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
NORTH CAROLINA �
o•o•°"•mme""°"^•"vin"•i� /� 336.776.9800
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 IF I 3 I NCO077968 111 12 I 19/10/04 I17 18 I S J 19 L G] 201 I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
671
70 I I 71 I I 72 I r I 73 I I 74 75I I I I I I I I80
u I� I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
01:15PM 19/10/04
17/02/01
Reedy Fork Mobile Home Park
3437 Shepard Rd
Exit Time/Date
Permit Expiration Date
Elon NC 27244
02:15PM 19/10/04
21/05/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Anthony Oscar Montero/ORC/336-433-7221/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Tim Horner,3073 Beaver Hill Dr Burlington NC 27215H336-222-8682/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Paul DiMatteo DWR/WSRO WQ/336-776-9691/
Signature of Management Q A Reviewer Docusigned by: Agency/Office/Phone and Fax Numbers Date
'? Stiidu- 10/31/2019
FL-
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO077968 I11 121 19/10/04 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO077968 Owner - Facility: Reedy Fork Mobile Home Park
Inspection Date: 10/04/2019 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment:
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Page# 3
Permit: NCO077968 Owner - Facility: Reedy Fork Mobile Home Park
Inspection Date: 10/04/2019 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑
Comment:
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
S
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter has a chart recorder that doesn't work.
Flow is read with an ISCO 3210 over what appeared to be a Palmer-Bowlus flume in a
manhole after disinfection.
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Equalization Basins
Yes No NA NE
Is the basin aerated?
❑
0
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Page# 4
Permit: NCO077968
Inspection Date: 10/04/2019
Equalization Basins
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Owner - Facility: Reedy Fork Mobile Home Park
Inspection Type: Compliance Evaluation
Yes No NA NE
■
❑
❑
❑
❑
■
❑
❑
❑
❑
❑
Comment: Operator said that the equalization basin hasn't had aeration since he became ORC, though
we noted that the fall of wastewater into the basin introduces air.
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
❑
❑
❑
Comment:
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
❑ ❑
0
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
0 ❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
❑ ❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑ ❑
❑
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site? 0 ❑ ❑ ❑
Page# 5
Permit: NCO077968
Inspection Date: 10/04/2019
Disinfection - UV
Owner - Facility: Reedy Fork Mobile Home Park
Inspection Type: Compliance Evaluation
Yes No NA NE
Are UV bulbs clean?
0
❑
❑
❑
Is UV intensity adequate?
❑
❑
❑
Is transmittance at or above designed level?
❑
❑
❑
Is there a backup system on site?
0
❑
❑
❑
Is effluent clear and free of solids?
E
❑
❑
❑
Comment: 5/8 bulbs were on at the time of inspection. There are 2 UV trains and only
one runs at a
time.
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
❑
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
❑
Comment: Certified Lab #5359 Homers MHP
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
❑
0
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: Please note that the composite sampling conducted should be flow proportional, as
described in the Permit.
Page# 6