Loading...
HomeMy WebLinkAboutNCG200469_Inspection Report_20191108ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Tri-State Scrap Metal, Inc. Attn: John Gribble 79 Pond Road Asheville, North Carolina 28806 NORTH CAROLINA Environmental Quality November 8, 2019 Subject: Compliance Evaluation Inspection Permit: NCG200000 Certificate of Coverage: NCG200469 Buncombe County, North Carolina Dear Mr. Gribble: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on November 5, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Since Isaiah Reed, WQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ5� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanua, North Carolina 28778 Noamcuwuw. wo828.296.4500 Permit: NCG200469 SOC: County: Buncombe Region: Asheville Contact Person: John Gribble Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 08/01/19 Expiration: 05/31/24 Owner: Tri-State Scrap Metal Inc Effective: Expiration: Facility: Tri-State Scrap Metal, Inc. 79 Pond Rd Inspection Date: 11/05/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Entry Time: 11:30AM Certification: Asheville NC 28806 Phone: 828-670-9006 Phone: Exit Time: 12:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge CDC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG200469 Owner -Facility: Tri-State Scrap Metal Inc Inspection Date: 11/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On November 5, 2019 this facility was inspected for complaince and to determine what progress had been made relating to the previousely issued NOV. I met with John Gribble on site. No issues were noted with the Stormwater Pollution Prevention Plan during the inspection. However, a practical means of inspecting the facility and determining the effectiveness of the BMPs on site has not been established. The permittee is directed to submit a written plan of action concerning how the process at the facility will be modified to allow for facility inspections. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NGG200469 Owner -Facility: Tri-State Scrap Metal Inc Inspection Date: 11/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: See summary for more information Permit and Oulfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ■❑❑❑ ■❑❑❑ N ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ E ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑■❑❑ ❑■❑❑ Yes No NA NE ■❑❑❑ ■❑❑❑ ❑❑■❑ ■❑❑❑ Page 3 of 3