Wanucha, Dave
From:Braquet, Stephanie
Sent:Friday, November 1, 2019 12:06 PM
To:Wanucha, Dave
Subject:Davidson Co CC203681 Bridge 410
Attachments:Davidson Co Bridge 410 after storm.jpg; Bridge 410 After Repair.jpeg
During the rain events over the last few days, we had a bank wash out on the above-mentioned project. The shoring
shown in channel was put in place to add a water line. This is a very sandy area that had a lot of sand deposits
downstream prior to construction starting. The water is still very high and we are unable to determine the amount of silt, if
any, that was lost. Once the water recedes and we know if we lost any silt and the amounts, we will let you know. We
have repaired the fencing and the bank was repaired and stabilized with geotextile fabric. A water line has to be placed
further downstream than what you can see in the attached pictures. When the water line goes in, we will permanently
seed and stabilize this bank.
Thanks
Stephanie Braquet
Division 9 Environmental Specialist
North Carolina Department of Transportation
336 747 7800 office
scbraquet@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1