Loading...
HomeMy WebLinkAbout20181195 Ver 2_Davidson Co CC203681 Bridge 410_20191101 Wanucha, Dave From:Braquet, Stephanie Sent:Friday, November 1, 2019 12:06 PM To:Wanucha, Dave Subject:Davidson Co CC203681 Bridge 410 Attachments:Davidson Co Bridge 410 after storm.jpg; Bridge 410 After Repair.jpeg During the rain events over the last few days, we had a bank wash out on the above-mentioned project. The shoring shown in channel was put in place to add a water line. This is a very sandy area that had a lot of sand deposits downstream prior to construction starting. The water is still very high and we are unable to determine the amount of silt, if any, that was lost. Once the water recedes and we know if we lost any silt and the amounts, we will let you know. We have repaired the fencing and the bank was repaired and stabilized with geotextile fabric. A water line has to be placed further downstream than what you can see in the attached pictures. When the water line goes in, we will permanently seed and stabilize this bank. Thanks Stephanie Braquet Division 9 Environmental Specialist North Carolina Department of Transportation 336 747 7800 office scbraquet@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1