Loading...
HomeMy WebLinkAbout310482_Inspection_20191107Division of Water Resources Facility Number - F 0 Division of Soil and Water Conservation Q Other Agency Type of Visit: & Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: "Islu ' -� ►J� - 2�4 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: C k-\ r \ S G Ve NAJC Integrator: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. I I Wean to Finish I I I to Finish Farrow Feeder Farroto w to Finish Other Other Latitude: Region: Phone: 110 2Y'�1o223 Certification Number: Certification Number: Design Current Wet Poultry Capacity Pop. Layer Non -La er Other Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) Longitude: Design Current Cattle Capacity pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow [:]Yes No ❑ NA ❑ NE ❑ Yes ❑ No E3<A ❑ NE ❑ Yes ❑ No M4A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Io ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Io ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: Date of Inspection: I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No L 4A ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: SV+�AtiI Spillway?: Designed Freeboard (in): lei ` S I ci Observed Freeboard (in): S �_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Io ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0No ❑ NA ❑ NE maintenance or improvement? Waste Ayolieation 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes to ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes []'IYo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Io0 ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0-1 o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ErNo.❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Qlrq, ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes ❑ No ❑ NA NE Page 2 of 3 21412015 Continued Facility Number: jDate of Inspection' 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1� " ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [—]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? [—]Yes No ❑ ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 21&0 ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ONo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 171jv 157-o Phone: �l�� Ci (o 7 1 Date: i 2141 (15