HomeMy WebLinkAbout310482_Inspection_20191107Division of Water Resources
Facility Number - F 0 Division of Soil and Water Conservation
Q Other Agency
Type of Visit: & Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County:
Farm Name: "Islu ' -� ►J� - 2�4 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Phone:
Onsite Representative: C k-\ r \ S G Ve NAJC Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Design Current
Swine Capacity Pop.
I I Wean to Finish I I I
to Finish
Farrow Feeder
Farroto w to Finish
Other
Other
Latitude:
Region:
Phone: 110 2Y'�1o223
Certification Number:
Certification Number:
Design Current
Wet Poultry Capacity Pop.
Layer
Non -La er
Other
Design Current
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
Longitude:
Design Current
Cattle Capacity pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
[:]Yes No ❑ NA ❑ NE
❑ Yes
❑ No
E3<A
❑ NE
❑ Yes
❑ No
M4A
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Io ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Io ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facili Number: Date of Inspection: I
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No L 4A ❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5 Structure 6
Identifier: SV+�AtiI
Spillway?:
Designed Freeboard (in): lei ` S I ci
Observed Freeboard (in): S �_
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes No ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental reat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes No ❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes Io ❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes 0No ❑ NA
❑ NE
maintenance or improvement?
Waste Ayolieation
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes o ❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes to ❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s)
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes []'IYo ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes Io0 ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0-1 o ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
ErNo.❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No ❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
Qlrq, ❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
No ❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes o ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes ❑ No ❑ NA NE
Page 2 of 3 21412015 Continued
Facility Number: jDate of Inspection' 1
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1� " ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey [—]Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? [—]Yes No ❑ ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes o ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes 21&0 ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ONo ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
171jv 157-o
Phone: �l�� Ci (o 7 1
Date: i
2141 (15