Loading...
HomeMy WebLinkAbout20191531 Ver 1_PCN Form Submission_20191105DR 02*10n of Water R"Ourc" Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r Yes r No Is this project a public transportation project?* r Yes r No Change only if needed. BIMS # Assigned * Version#* 20191531 1 Is a payment required for this project?* * No payment required What amout is owed?* * Fee received r $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Fayetteville Regional Office - (910) 433-3300 Chad Turlington:eads\ccturlington Information for Initial Review 1a. Name of project: Jessups Mill Pond Dam Repair 1a. Who is the Primary Contact?* Jon Swaim 1 b. Primary Contact Email:* jon.svvaim@mcgillassociates.com Date Submitted 11/5/2019 Nearest Body of Water Indian Creek(Jessups Pond) Basin Cape Fear Water Classification C Site Coordinates Latitude: 34.862585 A. Processing Information County (or Counties) where the project is located: Cumberland Is this project a public transportation project?* r Yes r No Longitude: -78.729078 1a. Type(s) of approval sought from the Corps: V Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (NWP) r- Regional General Permit (RGP) r- Standard (IP) 1c. Primary Contact Phone:* (828)386-1920 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: P 401 Water Quality Certification - Regular r Ni Jurisdictional General Permit r Individual Permit 03 - Maintenance le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 19. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? P Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of North Carolina 2b. Deed book and page no.: 7730-0519 2c. Responsible party: Gary Gardner, Engineering Section Chief 2d.Address Street Address 116 W Jones St Address Line 2 city Raleigh Postal / Zip Code 27603 2e. Telephone Number: (919)707-4091 2g. Email Address:* gary.gardner@ncwildlife.org 4. Agent/Consultant (if applicable) 4a. Name: Jon Swaim State / Rwinoe / R-gion NC Country us 2f. Fax Number: r Yes r No rYes rNo 4b. Business Name: Mcgill Associates P.A. 4c.Address Street Address 1013 State Farm Road Address Line 2 City Boone Postal / Zip Code 28607 4d. Telephone Number: (828)386-1920 4f. Email Address:* jon.swaim@mcgillassociates.com Agent Authorization Letter* JessupsMillAgent Authsigned.pdf C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town: Cedar Creek 2. Project Identification 2a. Property Identification Number: 0480475020 2c. Project Address Street Address 9021 Cedar Creek Rd Address Line 2 City Cedar Creek Postal / Zip Code 28312 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Indian Creek (Jessups Pond) 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300050103 4. Project Description and History State / Rovince / Ftegion NC Country us 4e. Fax Number: 2b. Property size: 2.44 State / Rovince / Fbgion NC Country us 178.95KB 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The proposed project site consists of an appropmate 40 linear foot breached area of the Jessups Pond Dam, 0.18-acres of the Jessups Pond bottom, and upland areas surrounding the upstream and downstream sides of the dam. Land in the vicinity consists of primarily undeveloped forested land with residential and commercial properties spread throughout. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r- Yes r No IT Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS Map.pdf 6.64MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil Map.pdf 788.28KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:* The purpose of the proposed project is to upgrade and rebuild the Jessups Pond dam which was breached during Hurricane Matthew in 2016 Rebuilding the dam will return the pond in its original footprint to its original water elevation, re-establishing historic open water and shoreline habitat, and public recreational uses. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed project consists of installing a broad crest weir (spillway) to accommodate runoff up to a 100-year event without overtopping the embankment. The spillway will be placed at the location of the breach and embedded into the existing embankments. The crest of the spillway will be set at the pre -breach normal water surface elevation of 95.5'. See Sheets C- 101 through C-504 for plans and details. The existing riser structure will be replaced with a new structure of similar dimensions. The elevations of the vertical weirs in the proposed structure will be set to maintain the pre -breach normal water surface elevation of 95.5'. The outfall headwall will be replaced. Riprap will be placed on the upstream and downstream face of the spillway, downstream face of the existing embankment, and along the top of bank on Indian Creek at the 10'x10' riser structure outlet to prevent erosion. The upstream face of the existing embankment will be scarified and overlain with embankment fill to reduce seepage potential. Overgrown vegetation on the dam will be removed to prevent future failure. The proposed plans will result in approximately 0.18-acres of temporary impacts to pre -breach open water (DWI, See Impact Map) as disturbance to the original pond bed during construction. Disturbance will mainly be attributed to equipment access and materials storage. A pump around or other approved flow diversion will be used during construction to maintain downstream flow and prevent sediment release into Indian Creek. Disturbed pond bed will be returned to original contours and elevations post construction and stabilized with native NC wetland seed mix Silt fencing will be installed to prevent sediment release into open water area and Indian Creek. Typical earth moving equipment such as front-end loaders, back hoe, and dump trucks will be used. 4j. Please upload project drawings for the proposed project. Jessup's Mill Dam.pdf 5.94MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jon Swaim Agency/Consultant Company: Mcgill Associates P.A. Other: 5d1. Jurisdictional determination upload Jessups Pond - JDFinal.pdf 4.38MB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Single and complete project. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands ❑ Streams -tributaries F Buffers V Open Waters ❑ Pond Construction 4.Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area OW1 Rebuild Dam T Jessups Pond(Indian Creek) Excavation Pond 0.18 4g. Total temporary open water Impacts: 4g. Total permanent open water impacts: 0.18 0.00 4g. Total open water impacts: 0.18 4h. Comments: Temporary impacts associated with equipment access and materials storage during re -construction of dam. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Project design intended to rebuild dam in existing footprint. Disturbed areas caused by equipment access will be kept to a minimum. Materials will be stored in upland areas as much as practical. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Pond bed impacts limited to access and lay down areas. Stream flow will be diverted during construction to limit sediment release into Indian creek. Silt fence will be installed during construction to limit erosion. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Proposed impacts are temporary which requires no compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: No riparian buffer rules for the Cape Fear River. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information ICJ 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* Proposed project to be funded by the State of North Carolina. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No I Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Proposed project is for maintenance of existing dam failure. No additional development anticipated as a result of the proposed work. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No r WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* (Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r- Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r- No 5g. Does this project involve bridge maintenance or removal? r- Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://wAw.fws.gov/raleigh/species/cntylist/cumberland.html No species occurrence or critical habitat found during site visit. Impacts will be limited to previously disturbed areas. One mature pine tree (10" +/- DBH) will be removed from the dam area as a result of the proposed work (see Sheet C-101). No red -cockaded woodpecker presence or signs of nesting were found during site survey. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://vwAv.habitat.noaa.gov/protection/efh/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpovveb/ 7c. Historic or Prehistoric Information Upload NCHPO Map.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r- Yes r No 8c. What source(s) did you use to make the floodplain determination?* https://fris.nc.gov/fris/Fbme.aspx Miscellaneous Comments 593.73KB Miscellaneous attachments not previously requested. IMPACT MAP.pdf 531.67KB Signature m By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jon Swaim Signature a& 15.1-1;`1 Date 11/5/2019 NJ me, l' Shaping C01111111111[t12s Together AGENT AUTHORIZATION FORM PROJECT NAME: Jessups Pond Dam Repair Project PROPERTY LEGAL DESCRIPTION: DB:7730 PG:0519 PARCELID. 0480475020 STREET ADDRESS: 9021 Cedar Creek Rd Please Print Property Owner/Representative: State of North Carolina GarV Gardner (If Representative) Title. Section Chief Engineering, NCWRC The undersigned, registered property owners of the above noted property, do hereby authorize Jon Swaim of McGill Associates P.A. (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's/Representative's Address (if different than property above): 116 W Jones St Raleigh, NC 27603 Telephone: 919-707-4091 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Sign e-- Authorized Signature Date: N i) Date: 1013 STATE FARM ROAD, BOONE, NORTH CAROLINA 28607 1 828.386.1920 1 www.mcgillassociates.com a E I M I GRAPHIC SCALE -1000 0 500 1000 I INCH =1000 FEET ITCCN M-in lvl_'llCl,ll , GU17 a) a PROJECT # 17.01903 Study Limit jo JESSUP POND PROJECT 1 Ca' I I Shaping Communities Together CUMBERLAND COUNTY, �/ NORTH CAROLINA WE) S'fATE FARM ROAD BOONE, NC 28607 PH. (828) 386-1920 34o 51' 55" N I 34o 51' 35" N Soil Map —Cumberland County, North Carolina a 707370 707440 707510 707580 707650 707370 707440 707510 707580 707650 v Map Scale: 1:3,000 if printed on A portrait (8.5" x 11") sheet. ` Meters N 0 40 80 1E0 240 Feet 0 100 200 400 600 Map projection: Web Mercator Gonermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 USDA Natural Resources Web Soil Survey am Conservation Service National Cooperative Soil Survey 707720 707720 a 707790 34o 51' 55" N 1 34o 51' 35" N 707790 En 3/27/2019 Pagel of 3 MAP LEGEND Area of Interest (AOI) u Area of Interest (AOI) Soils 0 Soil Map Unit Polygons ,y Soil Map Unit Lines Soil Map Unit Points Special Point Features t Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Soil Map —Cumberland County, North Carolina Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Cumberland County, North Carolina Survey Area Data: Version 19, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2015—Nov 28, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usi)nn Natural Resources Web Soil Survey 3/27/2019 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Cumberland County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CaB Candor sand, 1 to 8 percent slopes 0.0 1.5% LaB Lakeland sand, 1 to 8 percent slopes 0.3 9.5% TR Torhunta and Lynn Haven soils 0.1 2.0% W Water 2.6 86.9% Totals for Area of Interest 3.0 100.0% USDA Natural Resources Web Soil Survey 3/27/2019 Conservation Service National Cooperative Soil Survey Page 3 of 3 C01407 House �.t lllklsqq�4 March 27, 2019 ICUMBERLAND 0 ° n �S lmlrroh: Rp Y BLADEN Irl� 00, M8U7n00.i ChUj1rh AV NR Points NR Boundaries NR Individual ListinRegister Boundary * NR Listing, Gone Eloundary of Destroyed/Removed NR Listing NRHD Center Point SL Points 1:48,149 0 0.33 0.65 1.3 mi 0 0.5 1 2 km State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA USGS SL Individual Entry INDIAN CREEK i I CEDAR CREEK RD. � / �`X� � LI ^ \ T / r—---_-_- --- --- l IW----=rga-----qa-----qa-----Aa---- Aa---\` -°- mpa-----m°a-----Aa-----------------ma----— — — T° r\ ----------92 --m°a---\--m° GRAVEL`1-- -DR - - - -- J——-- `_— _------ _ _- - - ------------ ---- v------ --------9 — — - ` ---------------------- ------ ---- - ----------------------------------------------------------------------------- _ ----- — ---------------------------------------------------------------------------- - -- -- PSTRUCTION— — — — — — — — — — ENTRANCE — I�I = p \ -- Uri I ,- ■ ,°o- — — — PROP. SILT FENCE OUTLET. TYP. o o ���o ���o o ���o 0 0 - _ --o o ---o o -o -o ��o �o o a o ��o 0 sa-- _ i _----- _ ----------------------------- .. ------------------9B-- `_' - ram+ lei �� - -_- U �L Novv /i - - - - - - - - - ------------------ / \' BEG. SPILLWAY \� Y� i / 0 \ / 0 \l DIP EX. TREEUNE, TYR \ / 7. /-r�.I.� 1 i i 11 I i i7 ri�rii'I Ti7. Ex. SILT FENCE. Tv �. 9j s - \ / \ J-m°a-----m°a-----mpa-----mpa-- m _\��_ _ _ ---- -- - ----^•°a----"°"m°a L---m°_a_ mpa=--- 0` L L1moa�---S 2 RIPRAP P v v ' -_- - - - - 0 ` ` - DETAIL SH. C ) 0 Y � � / / PROP. CUSS 2 RIPRAP / 8. I � I/ ' � v(SEE 503 i 9 _ 11 00 DIRT RD ----_ Al2 00_5 95 - END SPILLWAY _--_ PROP. CONC. END WALL _-��/ / 1 h,' jlll/ I10 I. - _ 12+6.34. 6.00' LT (SEE DETAIL SH_C-5D1) / I 0 I -- yT= PROP. CLASS 2 PoPRAP gg I l•, l 1 00� : 7 �, A / - / -(SEE DETAIL SH. C-503) 94 PROP. TOP E' RISER STRUCTURE W/ STORMRAX TRASH �\ INSTALLE COMPACTED --- --- _---y--_ , / - 93� ------ PROVIDE (3) 7' W1DE HEIRS ON N, S, E WALLS - \ ABC DRIVE ON TOP TO // // 93 __ RACK. TOP EL 95.5. _ / RESTORE ACCESS DPoVE---- I I l ` - - --�--- --EL 96.5' W/ FLAT STDRMRAX TRASH RACKS \ PROVIDE 11 SCH BO PVC DRAIN WITH DATE VALVE � -- - 0 \\%� - -7 INV. EL 91.0'. �9\ --_-- t550 CONNECT TO EX. 48' PIPE (SEE DETAIL SH. C-501) _----- 15400 /- w — --------------_— ----- — ---- ORDINARY HIGH WATER MARK ----------- _ _—----- --- ---' — ----_ O PROP. slLr FENCE TYv. O Y v ` ' - --- - _ _ - — — ---- i Y% V A— -`--------- ��I'_-- ----' v , 1 A A a- ------ i s V < EL T v ORDINARY HIGH WATER MARK vv `v TEMPORARY IMPACT AREA — OW1 �Y 1 i A �D APPROX. 0.18—ACRESTF vI �� T i i \I JESSOPS MILL- POND ( 1 I \ \ DIRT [RD A PRELIMINARY FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION BEFORFr O D O O 40 SHEET 5400 Suite1 Trinity Road �� �Q o� ,1ESSUP'S MILL POND DAM REPAIR GRAPHICSCALE DIVISION VALUE= zo FEET IMPACT MAP Suite h, NORTH CAROLINA WILDLIFE IMPACT mcgi Raleigh, NC27607 ��� V ° oTTJRmANAOER DESIGNER 919.378.9111 !� m o �� RESOURCES COMMISSION BJR MMG NC Firm License # C-0459 V 9"ie tom' Q� GING QpP PRaecT MANAGER REVIEWER uAIE PRaecra TUNDINOa mcgillassociates.com CUMBERLAND COUNTY, NORTH CAROLINA NO. DAIE By DESCRIPTION IDS MH OCTOBER, 2019 19.00117 N/A JESSUP I S MILL POND DAM REPAIR CUMBERLAND COUNTY, NORTH CAROLINA SCO (16- 16456-03) SCHEDULE OF DRAWINGS �Q • N G-001 .... COVER SHEET G-002 .... GENERAL NOTES AND LEGEND / N G-003 .... GENERAL EROSION CONTROL NOTES HARNETT CONTACT PERSON COUNTY G-004 .... NCDEQ NCG01 GENERAL PERMIT NOTES BRAD KLEINMAIER, PE CAPITAL PROJECTS COORDINATOR G-005 NCDEQ NCG01 GENERAL PERMIT NOTES NORTH CAROLINA WILDLIFE RESOURCES COMMISSION 1720 MAIL SERVICE CENTER CD-101 EXISTING CONDITIONS AND DEMOLITION PLAN m RALEIGH, NORTH CAROLINA 27699-1720 FAYETTEVILLE o C-101 .... PLAN AND PROFILE AND EROSION CONTROL PLAN SAMPSON ENGINEER COUNTY C-301 .... CROSS-SECTION VIEWS STA. 10+00 - STA. 11+50 DORI SABEH, PE, GISP CLINTON PROJECT MGILL ASSOCIATES LOCATION C-302 .... CROSS-SECTION VIEWS STA. 12+00 - STA. 13+50 NO 5400 TRINITY ROAD CUMBERLAND SUITE 107 C-303 .... CROSS-SECTION VIEWS STA. 14+00 - STA. 15+50 RALEIGH, NORTH CAROLINA 27607 PROJECT LOCATION C-501 .... OUTLET STRUCTURE DETAILS LOCATION MAP NOT TO SCALE C-502 .... OUTLET STRUCTURE DETAILS C-503 .... SPILLWAY AND RIPRAP PROTECTION DETAILS CUMBERLAND COUNTY C-504 .... MISCELLANEOUS AND EROSION CONTROL DETAILS BLADEN COUNTY 2000 0 1000 2000 4000 VICINITY MAP GRAPHIC SCALE DIVISION VALUE = 2000 FEET 5400 Trinity Road ,p Suite 107 Raleigh, NC 27607 PRELIMINARY - FOR REVIEW PURPOSES ONLY - CC3 919.378.9111 NOT RELEASED FOR Z`0 NC Firm License # C-0459 CONSTRUCTION� fto m cg i l l associ ates . co m OCTOBER, 2019 U) U) w 0 0 0 a PROPOSED CONSTRUCTION SEQUENCE GENERAL CONSTRUCTION NOTES REVISED FOR THIS PROJECT ABBREVIATIONS EXISTING CONDITIONS LEGEND REVISED FOR THIS PROJECT 1. INSTALL EROSION CONTROL MEASURES ALONG THE PROJECT. ® AT MAX. MAXIMUM °PEL TELEPHONE PEDESTAL 0 CALCULATED POINT ELEC ELECTRIC PEDESTAL OIPS 2. CLEAR AREA AS REQUIRED FOR CONSTRUCTION. A AREA MECH. MECHANICAL PED 1 /2" REBAR SET WITH CAP SURVEY IS REFERENCED TO HORIZ: NAD83, STATE PLANE (FEET) NORTH CAROLINA �CATV CABLE TV PEDESTAL (FIFS 3200) VERTICAL: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) 3. DIVERT WATER THROUGH BREACH ONLY. A.B.C. AGGREGATE BASE COURSE MFR. MANUFACTURER PED ® CONCRETE MONUMENT BY MCGILL ASSOCIATES AC ACRE MH MANHOLE SIGN SIGN ®CM—R/W RIGHT-OF-WAY MONUMENT 4. REPLACE EXISTING CONTROL STRUCTURE AND ENDWALL AND GRADE UPSTREAM SLOPES OF EMBANKMENT. A.D. ALGEBRAIC DIFFERENCE MIN. MINIMUM CATV UNDERGROUND CABLE TV SIGN []DOT MON D.O.T. CONTROL POINT GRADE AREA AROUND NEW ENDWALLS AND PLACE RIPRAP PROTECTION. A.F.F. ABOVE FINISHED FLOOR MI MILE UG FOC UNDERGROUND FIBER OPTIC CABLE SIGN ORBF REBAR FOUND 5. DIVERT WATER THROUGH NEW STRUCTURE: KEEP GATE OPEN AND DEWATER AS NEEDED TO MAINTAIN WATER AL AREA LIGHT MJ MECHANICAL JOINT UG TCS UNDERGROUND TELEPHONE CABLE SIGN ORRSPIKE RAILROAD SPIKE LEVEL AT OR BELOW THE TOP OF THE ORIFICE. APPROX. APPROXIMATE UG GAS UNDERGROUND GAS LINE SIGN 0PK NL PK NAIL FOUND / SET ARCHITECTURAL # / NO. NUMBER 6. BUILD SPILLWAY &GRADE EMBANKMENT ARCH. N NORTH �UG ELEC UNDERGROUND ELECTRIC LINE SIGN SPINDLE SPINDLE FOUND SET ASSY. ASSEMBLY LP LIGHT POLE ®CPHUB HUB &TACK SET 7. STABILIZE ALL DISTURBED AREAS B-B BACK TO BACK NEMA MANUFACTURERSS ASSOCIATION / OUP UTILITY POLE ®CP/NL GPS CONTROL POINT NAIL SET FOUND 8. KEEP GATE OPEN AND WATER LEVEL AT OR BELOW TOP OF ORIFICE UNTIL APPROVAL TO IMPOUND IS BEAR. BEARING N/F NOW OR FORMERLY E GUY WIRE ANCHOR OCP/NL CONTROL POINT/NAIL SET GPS AUTHORIZED. BLDG. BUILDING N.I.C. NOT IN CONTRACT OTSP TRAFFIC SIGNAL POLE OCP/TEMP CONTROL POINT TEMPORARY MARK BOC BACK OF CURB NTS NOT TO SCALE RxR RAILROAD CROSSING SIGNAL NGS METAL ROD NATIONAL GEODETIC SURVEY METAL ROD BOT. BOTTOM O MH MANHOLE O.C. ON CENTER(S) Q ssMH SANITARY SEWER MANHOLE ®NGS CM NATIONAL GEODETIC SURVEY CONCRETE MONUMENT � CENTERLINE O.D. OUTSIDE DIAMETER � TEMPORARY CONTROL POINT SET C.A.B.C. CRUSHED AGGREGATE BASE COURSE OHE OVERHEAD ELECTRIC O SDMH STORM DRAIN MANHOLE ® NETWORK TRIANGULATION POINT CB CATCH BASIN OPER OPERATION O COMMH COMMUNICATION MANHOLE O° C-C CENTER TO CENTER OPNG OPENING ELMH ELECTRICAL MANHOLE STAKE STAKE FOUND CF CUBIC FEET O J.B. JUNCTION BOX 0 INTERSTATE HIGHWAY CFM CUBIC FEET PER MINUTE PB PLAT BOOK +SPIGOT SPIGOT/YARD HYDRANT 66 U.S. HIGHWAY FFE C&G CURB AND GUTTER PC POINT OF CURVATURE O C.O. SEWER CLEAN -OUT ELEVATION FINISHED FLOOR ELEVATION CH CHORD PERM. PERMANENT O E.SS ELECTRIC SERVICE STUB -OUT O Mw MONITORING WELL Cl CURB INLET PG PAGE O G.SS GAS SERVICE STUB -OUT OPZ PIEZOMETER CL. CLASS PI POINT OF INTERSECTION ®CB CATCH BASIN ® LANDFILL GAS MONITORING PROBE CNST CONSTRUCTION PITO POINT OF INTERSECTION - TURN OUT ®CI CURB INLET O SURFACE WATER SAMPLING LOCATION C.O. CLEAN -OUT PL PROPERTY LINE OwM WATER METER 69 LANDFILL GAS VENT CO. COMPANY PP POWER POLE AFH FIRE HYDRANT 0 LANDFILL GAS COLLECTION WELLHEAD PROP. PROPOSED COL COLUMN oa wv WATER VALVE Qw POTABLE WATER WELL PS POINT OF SWITCH CONC. CONCRETE . BLOWOFFVALVE BLOW OFF VALVE OMB MAILBOX OR PAPER BOX CONN CONNECTION PSI POUNDS PER SQUARE INCH bG/M GAS METER oP6 POSTAL DROP BOX CPP CORRUGATED PLASTIC PIPE PT POINT OF TANGENCY PT POINT b G/v GAS VALVE .4SAT DISH SATELLITE DISH CSP CORRUGATED STEEL PIPE PVC POLYVINYL CHLORIDE x ICV IRRIGATION CONTROL VALVE OYARD ORNAMENT STATUE, BIRD BATHS, ETC. CULV. CULVERT P.V.C. POINT OF VERTICAL CURVATURE x PIV POST INDICATOR VALVE TREES / DEG DEGREE(S) P.V.I. POINT OF VERTICAL INTERSECTION ® E.JUNC ELECTRIC JUNCTION BOX OR OUTLET SHRUBS /BUSHES p DELTA ANGLE PVMT PAVEMENT 0 eox TRAFFIC SIGNAL BOX (H) HORIZONTAL GROUND DISTANCE 0 / DIA. DIAMETER P.V.T. POINT OF VERTICAL TANGENCY GEOTECHNICAL BORING D DEPTH / DEEP e (G) NC STATE PLANE GRID DISTANCE DB DEED BOOK R RADIUSCULVERT Dc DEGREE OF CURVATURE RCP REINFORCED CONCRETE PIPE x x x FENCE DET DETAIL RD ROAD SILT FENCE DI DROP INLET RED. REDUCER-o-o-o-o-o-o-o-o-o-o-o-o-o-o- GUARD RAIL REQ'D. REQUIRED APPROXIMATE LOCATION OF DIP DUCTILE IRON PIPE RJ RESTRAINED JOINT - - - - s- - - - - s EXISTING SEWER LINES DN DOWN RR RAILROAD — — — — — w— W— APPROXIMATE LOCATION OF D/W DRIVEWAY RT RIGHT EXISTING WATER LINES DWG(S). DRAWING(S) ROW RIGHT OF WAY ----G ----G APPROXIMATE LOCATION OF EXISTING GAS LINES E EAST S SOUTH I I I I I I I I I I I I I I I I I I I I I I TOP OF SLOPE EA. EACH SAN SANITARY I I I I I I I I I I I I I I I I I I I I I I TOE OF SLOPE EL/ELEV ELEVATION SCH SCHEDULE--DL-----DL-----DL-- DITCH LINES ELEC. ELECTRICAL SDMH STORM DRAIN MANHOLE - - - - - CTV— - - - - CTV— APPROXIMATE LOCATION of EOP EDGE OF PAVEMENT UNDERGROUND CABLE TV LINE ESMT EASEMENT SEC SECONDS CTV APPROXIMATE LOCATION OF EX/EXIST EXISTING SECT. SECTION OVERHEAD CABLE TV LINE SED. SEDIMENT-----FOC— FOc— APPROXIMATE LOCATION OF F.D. FLOOR DRAIN SEW SEWER UNDERGROUND FIBER OPTIC CABLE LINE FDC FIRE DEPARTMENT CONNECTION(S) SF SQUARE FEET - - - -E- - - - -E APPROXIMATE LOCATION of FES FLARED END SECTION SHT. / SH. SHEET UNDERGROUND ELECTRIC LINE SP SERVICE POLE E E FFE FINISHED FLOOR ELEVATION APPROXIMATE LOCATION OF FH FIRE HYDRANT SPEC. SPECIFICATION OVERHEAD ELECTRIC LINE SQ. SQUARE — — — — T— — — — — T APPROXIMATE LOCATION OF FHA FIRE HYDRANT ASSEMBLY UNDERGROUND TELEPHONE LINES SR STATE ROAD FI FLOW INDICATOR APPROXIMATE LOCATION OF FLEX. FLEXIBLE SS STAINLESS STEEL T T OVERHEAD TELEPHONE LINES FL FLANGE SSCO SANITARY SEWER CLEANOUT - - - - -ROW- - - - -ROW- RIGHT-OF-WAY FM FORCE MAIN SSMH SANITARY SEWER MANHOLE TREELINE FO FIBER OPTIC CABLE STA. STATION FOP FIBER OPTIC POST STD. STANDARD O O O SHRUBLINE FOSC FIBER OPTIC SIGNAL CABLE STL STEEL — — — — PROPERTY LINE NOT SURVEYED FOC FACE OF CURB S/W SIDEWALK ROCKLINE FT FEET --- — -- — — — STREAM LINE FUT FUTURE T/C TOP OF CURB _ - - - - - TEL. TELEPHONE — CENTERLINE GA GAUGE TEMP. TEMPORARY CENTERLINE VARIANT GAL. GALLON TK THICK SWAM PLI N E/WETLAN DS G TOP OF GRAT ING TING GALV. GALVANIZED / EN GENERATOR T.O. TOP OF..._____U — — — — — u APPROXIMATE LOCATION OF G GA GUTTER LINE TP TELEPHONE PEDESTAL OVERHEAD UTILITY LINE GV GATE VALVE T/S TOP OF SLAB GW GUY WIRE/ANCHOR TSB TRAFFIC SIGNAL BOX IPS IRON PIN SET CPP CORRUGATED PLASTIC PIPE TST TEMPORARY SEDIMENT TRAP CMU CONCRETE MASONRY UNIT DIP DUCTILE IRON PIPE HD HEAVY DUTY T/W TOP OF WALL R/W RIGHT OF WAY E&T ELECTRIC & TELEPHONE HEX. HEXAGONAL TYP. TYPICAL CL CENTERLINE FOC FIBER OPTIC CABLE HOR(IZ). HORIZONTAL C CURVE (SEE CURVE TABLE) GIP GALVANIZED IRON PIPE HP HIGH POINT U/G UNDER GROUND O/H OVERHEAD UGE UNDER GROUND ELECTRIC COB POINT OF BEGINNING HWL HIGH WATER LEVEL CID CALCULATED POINT RCP REINFORCED CONCRETE PIPE HWY. HIGHWAY UP UTILITY POLE PB PLAT BOOK U/G UNDERGROUND UV ULTRAVIOLET VCP VITRIFIED CLAY PIPE ICV IRRIGATION CONTROL VALVE DB DEED BOOK PVC POLYVINYL CHLORIDE PIPE I.D. INSIDE DIAMETER V VALVE L LINE (SEE LINE TABLE) FFE FINISHED FLOOR ELEVATION IN INCH(ES) VC VERTICAL CURVE BLDG BUILDING PG PAGE INV. INVERT VERT. VERTICAL CIP CAST IRON PIPE REF REFERENCE CMP CORRUGATED METAL PIPE DOT DEPARTMENT OF TRANSPORTATION JB JUNCTION BOX W WIDTH NGS NATIONAL GEODETIC SYRVEY W WEST CONC CONCRETE NCSP NORTH CAROLINA STATE PLANE K CURVE COEFFICIENT W NTH PROP PROPOSED MTR BOX METER BOX / EX/EXIST EXISTING EL ELEVATION L LENGTH WD WIDE LB POUND(S) WL WATER LEVEL LD LIGHT DUTY WA WATER LINE LF LINEAR FEET WM WATER METER LG LONG WSE WATER SURFACE ELEVATION LP LIGHT POLE WV WATER VALVE LT LEFT WWF WELDED WIRE FABRIC LWL LOW WATER LEVEL YD YARD YI YARD INLET YH YARD HYDRANT PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION gEFORF yo SHEET � G � PAPER SIZE 24"X36" 5400 Trinity Road �Q. �Q� o� JESSUP S MILL POND DAM REPAIR GENERAL NOTES AND LEGEND Suite 107 NORTH CAROLINA WILDLIFE Raleigh, NC 27607 , Q OFFICE MANAGER DESIGNER 919.378.9111 RESOURCES COMMISSION BJR MMG G=002 C9 !,� N � NC Firm License # C-0459 Q�- GING QPROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # m cg i I lassociates. com CUMBERLAND COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION DS MH OCTOBER, 2019 19.00117 N/A C GENERAL EROSION CONTROL NOTES 43 UPDATED MARCH, 2017 EC NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES 44 UPDATED JULY, 2019 1. FINISH GRADE TOLERANCES SHALL BE AS NOTED IN THE SPECIFICATIONS. THE ENGINEER MAY MAKE GRADE CHANGES AS REQUIRED IN THE FIELD WITHOUT EFFECTING THE UNIT BID PRICE GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH FOR UNCLASSIFIED EXCAVATION. REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), DIVISION 2. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION. THE FOLLOWING THICKNESS, WITH WATER ADDED OR SOIL CONDITIONED TO THE OPTIMUM MOISTURE CONTENT AS CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. DETERMINED BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION EQUAL TO OR GREATER THAN 95% (100% IN THE TOP 2' OF THE SUB GRADE BELOW ROADWAYS AND PARKING LOTS) OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE -DENSITY RELATIONSHIP TEST, COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT ASTM D698 OR AASHTO-99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. OF ENVIRONMENTAL QUALITY (NCDEQ). DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), 3. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE PLACED ON DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE ANY AREA NOT CLEARED AND GRUBBED. AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 4. ALL SOIL EROSION CONTROL MEASURES REQUIRED BY THE GRADING PLAN SHALL BE PERFORMED PRIOR TO GRADING, CLEARING OR GRUBBING. ALL EROSION CONTROL DEVICES SUCH AS SILT 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF FENCES, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE ENGINEER'S APPROVAL. PAYMENT SHALL BE CONSIDERED INCIDENTAL TO CLEARING AND GRUBBING. IF DURING SECTION. THE LIFE OF THE PROJECT, A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR CREATES "GULLIES" AND "WASHED AREAS", THESE SHALL BE REPAIRED AT NO EXTRA COST, AND NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANK SHALL BE INSTALLED PER ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY STREAM PROTECTION DURING EXCAVATION DETAIL. SEEDING AND MULCHING SHALL BE COMPLETED DAILY APPROVED EROSION CONTROL PLANS WHETHER INDICATED IN THE CONSTRUCTION PLANS OR UNDER IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE SEPARATE COVER. INSTALLED CLOSER THAN 5' FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT 5. DISPOSABLE MATERIAL CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. A. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERWISE. 4. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE B. SOLID WASTES TO BE REMOVED, SUCH AS SIDEWALKS, CURBS, PAVEMENT, ETC., MUST BE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND PLACED IN SPECIFIC DISPOSAL AREAS DELINEATED ON THE PLANS OR REMOVED FROM THE RESOURCES, LAND QUALITY SECTION. SITE AS REQUIRED BY THE SPECIFICATIONS. THIS MATERIAL SHALL HAVE A MINIMUM COVER OF 2'. THE CONTRACTOR SHALL MAINTAIN SPECIFIED COMPACTION REQUIREMENTS IN THESE AREAS. WHEN DISPOSAL SITES ARE NOT PROVIDED, THE CONTRACTOR SHALL REMOVE THIS 5 CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS, WASTE FROM THE SITE AND PROPERLY DISPOSE OF IT AT HIS EXPENSE. AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION C. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. APPURTENANCES, UTILITY POLES, ETC., SHALL BE THE PROPERTY OF THE SPECIFIC UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, 6. ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM DESTROY, SALVAGE, REUSE, SELL OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. D. IF ON SITE BURNING IS AN ACCEPTABLE METHOD OF DISPOSING OF FLAMMABLE WASTES AND WHEN BURNING IS ANTICIPATED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND MEETING GOVERNING CODES. THE CONTRACTOR SHALL NOTIFY 7, PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS THE ENGINEER OR HIS REPRESENTATIVE AS TO THE SPECIFIC LOCATION OF BURNING. ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. AFTER BURNING IS COMPLETED, PURE ASH MAY BE DISPOSED OF BY MIXING WITH FILL DIRT. ALL MATERIAL NOT TOTALLY BURNED SHALL BE DISPOSED OF AS SPECIFIED IN "B" 8. SEED AND PLACE EROSION CONTROL MATTING ON ALL CUT AND FILL SLOPES THAT ARE NOT ROCK ABOVE. THE CONTRACTOR SHALL NOT HOLD UP WORK PROGRESS FOR THE PURPOSE OF IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. WAITING FORA BURNING DAY". 9. ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE 6. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE CONSTRUCTION, THE CONTRACTOR SHALL INSTALL NECESSARY UNDER DRAINS AND STONE ALLOWED FOR EQUIPMENT CROSSINGS. AS DIRECTED BY THE ENGINEER. ALL WORK SHALL BE PAID BASED UPON UNIT BIDS, UNLESS SPECIFIED OTHERWISE. 7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 8. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREAS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS. THE FINISHED SURFACE SHALL BE TO GRADE AND SMOOTH, FREE OF ALL ROCKS LARGER THAN 3", EQUIPMENT TRACKS, DIRT CLODS, BUMPS, RIDGES AND GOUGES PRIOR TO SEEDING; THE SURFACE SHALL BE LOOSENED TO A DEPTH OF t4"-6" TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. ALL SEEDING SHALL BE PERFORMED BY A MECHANICAL "HYDRO -SEEDER". HAND SEEDING SHALL BE AUTHORIZED ON AN AREA BY AREA APPROVAL BY THE ENGINEER. 10. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE CORRUGATED METAL PIPE (CMP) CONFORMING TO AASHTO M-36, WITH RE -ROLLED ENDS TO ACCOMMODATE CORRUGATED COUPLING BANDS. 18" PIPE SHALL BE 16 GAUGE, 24" AND 30" PIPE SHALL BE 14 GAUGE AND 36" PIPE AND OVER SHALL BE 12 GAUGE AS SPECIFIED ON THE PLANS, PIPE AND COUPLING BANDS SHALL CONFORM TO NCDOT 1032-3 FOR PLAIN PIPE OR 1032-4 (A) FOR BITUMINOUS COATED AND PARTIALLY PAVED PIPE. DIMPLE BANDS SHALL NOT BE USED. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) CONFORMING TO AASHTO M-170, AS CONTAINED IN NCDOT STANDARD SPECIFICATION 1032-9 FOR WALL "B" TYPE. WHERE SPECIFIED, ALL STORM DRAIN PIPE SHALL BE HIGH DENSITY POLYETHYLENE (HDPE). SMOOTH WALL INTERIOR, WITH WATER TIGHT JOINTS, BACKFILLED WITH # 57 WASHED STONE UP TO MIN. 6" OVER THE TOP OF THE PIPE. HDPE PIPE USED FOR STORM DRAINAGE DETENTION SYSTEMS SHALL BE "HANCOR BLUE SEAL" OR APPROVED EQUAL. ALL CORRUGATED METAL STORM DRAIN PIPE (CMP) SHALL BE ALUMINIZED TYPE 2 CORRUGATED STEEL MANUFACTURED IN ACCORDANCE WITH THE REQUIREMENTS OF AASHTO M-36. THE PIPE SHALL BE MANUFACTURED FROM ALUMINIZED STEEL TYPE 2 MATERIAL CONFORMING TO THE REQUIREMENTS OF AASHTO M-274. ALL PIPE SHALL BE FURNISHED WITH RE -ROLLED ENDS AND SHALL BE JOINED WITH HUGGER BANDS. THE USE OF DIMPLE BANDS WILL NOT BE ALLOWED. PIPE THROUGH 24" DIAMETER SHALL BE 16 GAUGE, PIPE THROUGH 42" DIAMETER SHALL BE 14 GAUGE, PIPE THROUGH 54., DIAMETER SHALL BE 12 GAUGE. 11. CONTRACTOR SHALL VERIFY ALL ELEVATIONS BEFORE INSTALLATION OF FACILITIES. 12. CATCH BASINS CAST -IN -PLACE SHALL CONFORM TO THE REQUIREMENTS OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (LATEST EDITION) ARTICLES 840-1 THROUGH 840-3. CURB INLET CATCH BASIN SHALL CONFORM TO NCDOT STANDARD DETAILS 840.02 THROUGH 840.04. DROP INLETS SHALL CONFORM TO STANDARD DETAIL 840.14. JUNCTION BOXES SHALL CONFORM TO STANDARD DETAIL 840.31. 13. CURB INLET FRAME, GRATE AND HOOD SHALL BE NEENAH R-3233D, PRODUCTS BY DEWEY BROS., U.S. FOUNDRY OR EQUAL. DROP INLET FRAME AND GRATE SHALL BE NEENAH R-3339A OR EQUAL. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.04, OPENING FACING UPSTREAM. 14. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 1000, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 1040, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND/OR 834. 15. TOPS OF PROPOSED FRAMES AND GRATES SHALL BE FLUSH WITH FINISHED GRADE. 16. TINDALL PRE CAST CONCRETE BOXES ARE ACCEPTABLE ALTERNATIVES FOR PROPOSED CATCH BASINS. PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 10. SEED AND MULCH DENUDED AREA WITHIN TIME FRAME SPECIFIED (SEE TABLE). SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. LIME 4,000 LBS FERTILIZER (10-10-10) 1,000 LBS KY-31 FESCUE (POA PRATENSIS) 100 LBS (MOWED AND MAINTAINED AREAS ONLY) OR CREEPING RED FESCUE 100 LBS (NATURAL AREAS AND STREAMBANKS) STRAW MULCH 60-80 BALES FOR SUMMER SEEDING ADD TO THE ABOVE: GERMAN MILLET (SETARIA ITALICA) 40 LBS SMALL -STEMMED SUDAN GRASS (SORGHUM BICOLOR) 50 LBS FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN (SECALE CEREALE) 120 LBS IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: PURGE LIVE SEED SWITCHGRASS 4 LBS BROWNTOP MILLET OR PEARL MILLET (PENNISETUM GLAUCUM) 8 LBS GRAIN SORGHUM (SORGHUM BICOLOR (L.) MOENCH SSP. BICOLOR) 2 LBS ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. NATIVE SEEDING: THE CORRECT SEEDBED pH IS 5.5 TO 6.5. APPLY ZERO NITROGEN AT PLANTING. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). SEEDING DEPTH FOR ALL NATIVE SSP. EXCEPT E.GAMAGRASS (TRIPSACUM DACTYLOIDES) NEED TO BE 1 /4" - 1 /2". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. gEFORF y C 5400 Trinity Road Suite 107 Raleigh NC 27607 919.378.9111 N Cg NC Firm License # C-0459 mcgillassociate Q GING QP NO. I DATE I BY DESCRIPTION NATIVE PLANT SEEDING MIX FOR STREAM OR RIVERBANK STABILIZATION SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS, AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING: GRASSES - BIG BLUESTEM (ANDROPOGON GERARDII), INDIAN GRASS (SORGHASTRUM NUTANS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), SWITCHGRASS (PANICUM VIRGATUM). 15 LBS/ACRE EACH AUGUST THRU MAY - GREENRYE (SECALE CEREALE) 25 LBS/ACRE EACH MAY 1 THRU AUGUST - MILLET (PENNISETUM GLAUCUM) 25 LBS/ACRE EE,,qq NN TREES - SILKY DOGWOOD (CORNUS AMOMUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALNUS SERRl7LACTA) AND ELDERBERRY (SAMBUUS CANADENSIS) NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. 12. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 13. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. 14. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. TEMPORARY SEEDING SPECIFICATION SEEDING MIXTURE: SPECIES RATE (lb/acre) RYE (grain) 120 SEEDING DATES: AUG 15 TO DEC 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LB/AC GROUND AGRICULTURAL LIMESTONE AND, 750 LB/AC 10-10-10 FERTILIZER. MULCH: APPLY 4000LB/AC STRAW. ANCHOR STRAW BY TACKING W/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK W/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1 SEEDING MIXTURE: SPECIES RATE (lb/acre) TALL FESCUE 100 SWITCHGRASS AND PARTRIDGE PEA MIX 30 KOBE LESPEDEZA 10 NURSE PLANTS: BETWEEN MAY 1 AND AUG 15, ADD 10LB/AC GERMAN MILLET OR 15 LB/AC SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 LB/AC RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE LESPENDEZAS IN MARCH. SEEDING DATES: BEST POSSIBLE AUG 25 - SEPT 15 AUG 20 - OCT 25 FEB 15 - MAR 20 FEB 1 - APRIL 15 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 4000 LB/AC GROUND AGRICULTURAL LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER. MULCH: APPLY 4000 LB/AC GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY TACKING W/ ASPHALT, ROVING OR NETTING, NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR, RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RE -SEED, RE -FERTILIZE, RE -MULCH DAMAGED AREAS IMMEDIATELY. DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION SEEDING MIXTURE: SPECIES RATE (Ib/ac) TALL FESCUE 250 (6 Ib/1000 sq ft) NURSE PLANTS: BETWEEN MAY 1 AND AU 15, ADD 10 LB/AC GERMAN MILLET OR 15 LB/AC SUDANGRASS, PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 LB/AC RYE (GRAIN). SOIL AMENDMENTS: APPLY LIME AND FERTILIZE ACCORDING TO SOIL TEST, OR APPLY 4000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: USE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THE HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4000 LB/AC GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: INSPECT AND REPAIR MULCH FREQUENTLY. RE -FERTILIZE IN LATE WINTER ACCORDING TO SOIL TESTS OR APPLY 150 LB/AC 10-10-10 FERTILIZER (3 Ib/1000 sq ft). MOW REGULARLY TO A HEIGHT OF 2" TO 4". EC MAINTENANCE PLAN 45 J UPDATED MARCH, 2017 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN NO CASE NOT LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES APPROX. 0.5 FEET DEEP AT THE SILT FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREA SHALL BE FERTILIZED, RESEED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE SEEDING SPECIFICATION TO MAINTAIN A VIGOROUS AND DENSE VEGETATIVE COVER. 4. MAINTAIN ALL MATTING THAT HAS BEEN PLACE ON SLOPES AND IN DITCHES. CHECK FOR GOOD GROUND CONTACT AND FOR THE OCCURRENCE OF ANY EROSION UNDER THE MATTING. MONITOR AND REPAIR OR REPLACE AS NECESSARY. 5. THE CONTRACTOR SHALL MAINTAIN SELF INSPECTION REPORTS AS REQUIRED BY NCDEQ AND THE NPDES CONSTRUCTION STORMWATER PERMIT. SELF INSPECTIONS ARE TO BE CONDUCTED AFTER EACH PHASE OF THE PROJECT FOR THE RECORD OF THE INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL MEASURERS. 6. SEDIMENT SHALL BE REMOVED FROM THE TEMPORARY SKIMMER AND SEDIMENT BASINS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. CLEAN OUT AND RESHAPE BASIN BACK TO THEIR ORIGINAL DIMENSIONS. SKIMMERS SHALL BE CHECK FOR CLOGGING AND CLEANED OUT. REPAIR OR REPLACE ANY DAMAGED BAFFLES. JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA PAPER SIZE 24"X36" OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER IDS MH GENERAL EROSION CONTROL NOTES DATE OCTOBER, 2019 PROJECT # FUNDING # 19.00117 N/A SHEET G=003 0 0 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SANDBAGS(TYP.) OR STAPLES 10 MIL SILT FENCE 1:1 7PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES (TYP.) 2 X X HIGH COHESIVE & LOW FILTRATION SOIL BERM CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES: WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75%OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE 10. MIN 1 - - - 1 -11 SANDBAGS (TYP.) OR STAPLES ICLEARLY MARKED SIGNAGE W ONCRETE NOTING DEVICE (18"X24" MIN.) ASHOUT PLAN SANDBAGS(TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75%OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING gEFORF y C 5400 Trinity Road Suite 107 Raleigh NC 27607 919.378.9111 N NC Firm License # C-0459C9 mcgillassociate Q GING QP NO. I DATE I BY DESCRIPTION JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA EFFECTIVE: 04/01/19 PAPER SIZE 24"X36" OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER DS MH PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION NCGO1 GENERAL PERMIT NOTES DATE OCTOBER, 2019 PROJECT # 19.00117 FUNDING # N/A SHEET G=004 PART III ._. ViTiNIff SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated o A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions o Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING gEFORF y C 5400 Trinity Road Suite 107 Raleigh NC 27607 919.378.9111 N C9 NC Firm License # C-0459 �i 9,�� mcgillassociate Q GING QP NO. I DATE I BY DESCRIPTION JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA EFFECTIVE: 04/01/19 PAPER SIZE 24"X36" OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER IDS MH DATE PRELIMINARY - FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION NCGO1 GENERAL PERMIT NOTES OCTOBER, 2019 PROJECT # li&elleleimrA FUNDING # 1►U_1 SHEET G=005 51 I I / / EX. SILT FENCE TYP. \ \ \ \ \ l / / / —�/ 1 \ \ \ 1 1 \ 1 INDIAN CREEK e \\\ill/ —MO�I— \\ MOM — M M—I— —I—M�M / MOM-----MOM-----MOM-----MOM-----MOM-----MOM----- — -----M M— -- _� —=----MOM-----MOM-----MOM— --�' 021---- 0 \ ma*—_—. ��-AM021\— M M---- o' M021-----MOM-----mom-----MOMS----mom-----mom---\--MO\ M021 —�—� I —I---- \ I — ----- I�"zF� F F F F F"�-- �\ �� l \ \ \ \--- T w 1 \ I 1 I I \ \\ —_/�' ---------------- sz--- \ �' \ \ 1 \� \\ ��\\ \ \ \ \ I I \\ GRAVEL DR — — EX. 4" PVC ----- _s /------------ __ ___----------93 -----_ INV. OUT = 43'� EX. 4" PVC \ _ ---- ------------------------- ----- ---- 92` l� \ 1 I — —— — — — — — — — — — — — — ------------------------------ sa---- / \ / INV. OUT = 92.31' \ 1 1 _ — — — — — ------------------------------- _ — — — — — — — —\\ \ 1 1 ) )K / _-------------------------- l / — — — _ — — — — — — — — — — — — — — — — — —-------------------- s — \\\ \\\\ \\\\\\\\\ 1\ \ I I \ \ 1\\\!:`�, \� EX. 15" CPP \\\ \\ 11 1\ / ---- ---------------------------------------------------- :ly \ _-- z-- — ------------------------------------------------------------------ _ —INV. IN= 5.24 --------_ ______________ -- -------------------------------------------------------- �': .- �/��—' ) \ \\___� 1 r— INV. OUT = 94.96' — — — — _J \ 1 I 11 i I \\ ----- 1 i Do00— - ------------------------------------------------------ss--- y - -n--EX.CB -- -- -- —O—O o—o—o—o—o—o—o—o—o—o—o—o—o—o — — — I III- RIM EL.=98.79' lit- � �� a a / rn rn,/ y roro W 0� M i�00rn rn rnrni99 ICI I I I `\\�IN 15" RCP 11� I I I INV. IN = 95.87' DOT MONUMENT GPS CEDAR CREEK RD. I \ y 11 / �'/ 4t- I I I _ 1- /■ INV. OUT = 95.34' N: 404766.47 — —100— — — — Ijl \ II/ / / /I�- I I I I ■ EL: 208172 2.57 — — I'I \\ y III\ \ / / i / It* I I I ■ f00- � .— — o—o—o—o—o—o—o—o—o—o—o—o- - _0 0 0 0 0 0 0 0 99 100— / — �j/// I--------------------------------------------------98-- X-=�^ -� - - - - _��- �- - --�k-F F P+ ------- ------ — / _ I----------------s7/> -'1 _ F F 1 F F F FIT - / / j/) / \\\ \ \ I 1 ) EX. CB \\\ T$ F F / BOTTOM OF BRIDGE /\ \ 11 \ \) 1,�1�r I I ---------- INV. OUT = 96.29' / \ �� \\ / / RIM EL. = 98.76' _ \ \ j \ / / l / \ \ \ / / ; / BOTTOM OF BRIDGE \ \� \ � J \� //'/ X. ,� ' -',� ;' INV. OUT = 95.95' SPINDLE SET------ f-f r \ ���// / \ ` N: 405021.23 -� -{ \ , \ , ��/c / \ / - E: 2081020.30 % '✓ ( / 0 \ / 0 \ 1 DIRT I 9 E. o, _ l _ w \ \ 1 0 v - --I—MOM-----MOM-----MOM-----MOM---=--M(i4 __—IMAM----=�d02� --- MOM -----MOM-- --MOM-----MQM-----MOMS----MOM J--MQa--- mes -/ y�'rL� s l�l0 I �I�L1MOM�----MOM-----MOM---- MOM -----MOM-- M M 9�—M 9$ OM-- M — MOM 'Al:a —MOMS \ \ 4 II— o _ \ \ \ \ _ I I 0 00 N17' 43' 15.88"W — — — — — / 0 10+ I 51.59 A°'11+00 DIRT RD 2ry00 �� A�`I�!I �// /s7 \ _—_-- -----� ------ EX. ENDWALL 1 ✓ // \�� // /..///I ¢ 1 / / 8,� //— - \\`— _TO BE REPLACED 9 EX. DIRT ROAD, TYP. _l �/ / i , h-11' / I`Ni'' I NQ8' 19' 3 ----- -------ss-/\\ / p If ---- B—o1//�/i!/ / / /f/' / I+ I \� 1 i 399.93 I 13 00 \ \/ EX. SILT FENCE, TYP. / — — _ _ — r \ EX. RIP RAP B-02 — 14 9 / TO BE REMOVED /—__98 -- \ \ _—_ _ _—__ 00 — --- 9 \ \� � / / ( / _ / \ /� � � TO BE REMOVED / / \ / / \ i \AND REUSED IN __ _ _ --- / GRADED AREAS _ --_ EX 48 RCP ----------1 — — _ — — — _ N14 33' 23.89"W 15 00 \ 15+ \\ R 98 48 97 IM—__INV. (E) IN = 90.54' I B-03 99/ /// // /i�95/ //���� ���/ I I \ \\ INV. (W) OUT = 89.64'-----__ �fJESSUPS MILL POND \\ \\\ \\ l // /� --- ---_ ----EX. SIGN I / \ 1 I / 0 ��I \\ REMOVE AND /�� '/ 1 / / REMOVE ALL TRESS ON 1 \ --� _ _ -- \----------- ` \ / EMBANKMENT TOP AND SLOPES. , �� REINSTALL SIGN TREES 6—INCH DIAMETER AND LESS SHALL BE CUT FLUSH AT \\ \ �^ \ \ \ TOP OF FLASHBOARD WEIR = 95.50' THE GROUND. TREES LARGER THAN \ \ \I 6—INCH DIAMETER SHALL BE \ \ STRUCTURE AND APPURTENANCE TO REMOVED PER DETAIL SH C-504 1 BE REMOVED VNTHOUT DAMAGING EX. TREELINE, TYP. STA. 11+00 — 14+50 \ / THE PIPE. \ \ \\ 1 I F 90. 1 EX. CYPRESS WATERLINE, TYP. \ / / 1 0101 10 I I / ORDINARY HIGH WATER ORDINARY HIGH WATER I I l 1 I \ \ DIRT W gEFORF y C 5400 Trinity Road Suite 107 Raleigh NC 27607 919.378.9111 N NC Firm License # C-0459 mcgillassociate Q GING QP NO. I DATE I BY DESCRIPTION / JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER DS MH I I I I I I I\ I I I PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION EXISTING CONDITIONS AND DEMOLITION PLAN DATE PROJECT # FUNDING # OCTOBER, 2019 19.00117 N/A SHEET CD=101 0 0 w ----------------------- ___--------- -- ---------------- -------------------------------------------------- — — — — — — — — — _ _ -95- ----------------- ----- --- \\�\\\ ,\ y INDIAN CREEK ----------------9s---------- - - - - - - --------- ----\ �\ --- `� \ \ ---------__---------------------- - - - ;--r- ------------- ---- _ 1 — O_O—O—O—O—O—O— DOT MONUMENT GPS — — SPINDLE SET 1 I 1 / j I Ilr I I I �\ ' TEMP. CONSTRUCTION N: 404766.47 0 ENTRANCE E: 2081082.57 I E: 2081020.30 ` EL: 99.72 — — CEDAR CREEK RD. I —too— EL: 99.07 y II / /� LIMITS OF DISTURBANCE, TYP. -- II � ylll � /� � / I --- -- -- -o-o-o-o-o-o-0-0-0=0_990-0-0-0 -0-0-0-0-0 -o-o-o 100- --------- I 1 - ; , PROP. SILT FENCE -_ � � o / � � � E:F T N-�- ----------- / I OUTLET. TYP. \ \ \ - / %.1. i_ii- i- i i i i T 1-i AJ \ \ 1 ��' W MOM-----MOM-----MOM-----MOM— —ARAM--- ----MOM-----MOM--- —MOM-----MQM-----MOMS----MOM ���— MOMS--_MOy-3� —M0M_ < 08 I L mom ----- mom ----- mom -- PROP. CLASS 2 RIPRAP 8. I — — — — — — `\''i 8g — _ '�, n I I I / (SEE DETAIL SH. C-503) 10 00 — 11 00 DIRT RD —�� / 0 93 94 s7 — -- \ I 95 _ END SPILLWAY 00 15 _ - - iT PROP. CONC. ENDWALL MOM - - - - - - - - - - - - nAAn%J / ----MOM--- \ 1 1 / Td / ---- - TO EL. = 99.0' 4 .4 / Jh, III. \ I . I_ — — — — — — 1 I Q II INSTALL 6" COMPACTED \ ` 1 I, j.. .. 1 /.. 13yu ABC DRIVE ON TOP TO / / - 94 4 C RESTORE ACCESS DRIVE - - -�� _ _ // - - / 93 92 - - - - - EX. TREELINE, TYP.\-- gil //9 90 \ Q _ Q - ADD 2' EMBANKMENT FILL 4 00/// \ (_SEE CROSS SECTIONS SHEETS) --------- - 15 00 \ / 15150 \\\ 1 / / REMOVE TREE, TYP. _ 9 _y - _ _ ■ - 1 \ \ 1 l (SEE DETAIL SH. C-503) 9 / / \ - _ _ - - _ _ \ 8 I \ ' - - - - - - - - / i /\ ^ -- \ I \ l I I I I I I I I I I I I I I I \ Nor19C+\ \\ 9 EX. 48" RCP --- ---- __ — \ BEG. SPILLWAYamp- \ 9 \ \\ INV. IN = 90.54' ------ --_- - \--------��// \� 12+9.34, 6.00 RT - \ -\ \ S \ 97-INV. OUT = 89.64'T------------ - --- -_---_ --\ Xi TREELINE, TYP. it j PROP. CLASS 2 RIPRAP \ EL. = 95.5' 9R \ \ - - - ---------- - '---\\` s PROP. 77 LF SPILLWAY \ ` EX. SILT FENCE, TYP. - - - - - _ _ _ _ _ - — / (SEE DETAIL SH. C-503) � \ � g _ _ _ (SEE DETAIL SH. C-503) 9 \ \ \ 9 ------ - _ — _ — _ — -\ \------ \ JESSU�S MILL POND Q / / I \ EX. CYPRESS WATERLINE, TYP. � \ RP LAC N 8" RCP 89 3 PROP. SILT FENCE TYP. 1 `\ \ \ JOINT. ORDINARY HIGH WATER C. \ \ \ I LIMITS OF DISTURBANCE, TYP. \ \ / \ \ APRON - PROP. 1O'X10' RISER STRUCTURE ® EL. 97.4- j W/ \ \ \ r 91 RMRAX TRASH RACKPROVIDE (3) 7' WIDE WEIRS ON N. S. E WALLS O EL. 95.5' \I777 > l 9�� W/ FLAT STORMRAX TRASH RACKS. ORDINARY HIGH WATER \ 1 \�' \ �. ^' PROVIDE 10" SCH 80 PVC DRAIN WITH GATE VALVE ®INV. EL 91.0. nn CONNECT TO EX. 48" PIPE. (SEE DETAIL SH. C-501) \\ Ui aao Go to n o G N M M II PROP. EMBANKMENT CREST II II II a EL. 99' a a a N N U) Q 100 in m O1 m °1 m °f 100 Q W Q> a W — W -0.00% W 2' CLASS 2 RIP RAP W 0.00% W h �i 77' Lv 95 A 4 .a " 95 a PROP. SPILLWAY TOP EL. = 95.5' 8"THICK CONCRETE CAP I REPLACE EXISTING SOIL (SEE DETAIL SH. C-503) I WITH EMBANKMENT FILL 1' BENCH z 90 90 CLAY CORE EXTEND TO EL. = 80' �1 86 86 10+00 11 +00 12+00 13+00 14+00 15+00 15+50 gEFORF y C 5400 Trinity Road Suite 107 Raleigh NC 27607 919.378.9111 N NC Firm License # C-0459 �i 9,�(c mcgillassociate Q GING QP NO. I DATE I BY DESCRIPTION JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER IDS MH PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION PLAN AND PROFILE AND EROSION CONTROL PLAN DATE OCTOBER, 2019 PROJECT # FUNDING # 19.00117 N/A SHEET C=1 01 0 0 GRADING AND EMBANKMENT NOTES: 1. EMBANKMENT GRADING FOR LOCATIONS WHERE EMBANKMENT TOP ELEVATION IS BELOW 99.0' ONLY AND/OR LIMITS SHOWN IN THE PLAN SHEETS. MAINTAIN EXISTING WHERE TOP ELEVATION IS ABOVE 99.0' 2. A MINIMUM OF 1 FT OVERCUT EXCAVATION IS REQUIRED PRIOR TO PLACEMENT OF FILL/GRADING. 3. ALL ADDITIONAL FILL PLACED OVER EXISTING SLOPES SHALL BE BENCHED IN 1FT VERTICAL INCREMENTS INTO THE EXISTING SLOPE. 4. OVERCUT MATERIAL NOT SUITABLE FOR FILL SHALL BE HAULED OFFSITE AND SHALL BE PROPERLY DISPOSED. 5. GRADING (INCLUDING OVERCUT EXCAVATION) SHALL BE EXTENDED MIN. 50' BEYOND THE LIMIT OF PROPOSED WORK TO TIE TO EXISTING GROUND AREAS BELOW 99.0'. 6. WORK DESCRIBED ABOVE SHALL BE INCLUDED IN THE LUMP SUM BID PRICE. UNSUITABLE MATERIAL ENCOUNTERED BELOW 1 FT OVERCUT EXCAVATION AND EXCAVATION LIMITS SHOWN ON THE PLANS SHALL BE PAID AT THE UNIT BID PRICE FOR UNDERCUT EXCAVATION. 105 EXTERIOR 01111 40 INTERIOR 6" COMPACTED ABC DRIVE PROP. EMBANKMENT 0.' - 99.0' CREST EXISTING GRADE p NORMAL POOL WATER EL. = 95.5' 28.49 R CEDAR CREEK RD. �'� ------- ----- - ------------- ------------ --- '� - -- -- V OVERCUT EXCAVATION-- EX. GRAVEL DRIVE ------------- ------------ --- ------------ ------------ ------------ 0161 WIT11 0161 9T00 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 1000 11 +50 105 EXTERIOR INTERIOR 105 100 95 CREST - PROP. EMBANKMENT EL. = 99.0' EXISTING GRADE 6" COMPACT ABC DRIVE NORMAL POOL WATER EL. = 95.5' ,- -- EX. GRAVEL DRIVE =-;- , ' CEDAR CREED RD. -- ' 1' OVERCUT EXCAVATION , 100 95 9P00 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 1000 11 +00 EXTERIOR INTERIOR 105 105 100 95 PROP. EMBANKMENT CREST EL = 99.0' EXISTING GRADE ---- -------------- ------- -- ------------- ---- - -- ______ ----- ------------ EX. GRAVEL POOL p EL. = 95.5' ' CEDAR CREEK RD. EXCAVATION ------------- DRIVE - ------' 1' OVERCUT EX. GRAVEL DRIVE - NORMAL WATER 100 95 9T00 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 1000 10+ 50 105 EXTERIOR INTERIOR 105 100 CEDAR CREEK RD. 95 EXISTING GRADE 100 95 I I 1 1 9 g 0 �00 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 10+00 5400 Trinity Road P� Suite 107mcg I Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 Q� m cg i I lassociates. com JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION GING QCUMBERLAND COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION PROFILE HORIZONTAL: 1" = 10' VERTICAL: 1" = 5' PAPER SIZE 24"X36" OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER IDS MH PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION CROSS-SECTION VIEWS STA. 10+00 - STA. 11 +50 DATE PROJECT # FUNDING # OCTOBER, 2019 1 19.00117 N/A SHEET C=301 Q 0 0 U) U) w 0 0 0 a GRADING AND EMBANKMENT NOTES: 1. EMBANKMENT GRADING FOR LOCATIONS WHERE EMBANKMENT TOP ELEVATION IS BELOW 99.0' ONLY AND/OR LIMITS SHOWN IN THE PLAN SHEETS. MAINTAIN EXISTING WHERE TOP ELEVATION IS ABOVE 99.0' 2. A MINIMUM OF 1 FT OVERCUT EXCAVATION IS REQUIRED PRIOR TO PLACEMENT OF FILL/GRADING. 3. ALL ADDITIONAL FILL PLACED OVER EXISTING SLOPES SHALL BE BENCHED IN 1FT VERTICAL INCREMENTS INTO THE EXISTING SLOPE. 4. OVERCUT MATERIAL NOT SUITABLE FOR FILL SHALL BE HAULED OFFSITE AND SHALL BE PROPERLY DISPOSED. 5. GRADING (INCLUDING OVERCUT EXCAVATION) SHALL BE EXTENDED MIN. 50' BEYOND THE LIMIT OF PROPOSED WORK TO TIE TO EXISTING GROUND AREAS BELOW 99.0'. 6. WORK DESCRIBED ABOVE SHALL BE INCLUDED IN THE LUMP SUM BID PRICE. UNSUITABLE MATERIAL ENCOUNTERED BELOW 1 FT OVERCUT EXCAVATION AND EXCAVATION LIMITS SHOWN ON THE PLANS SHALL BE PAID AT THE UNIT BID PRICE FOR UNDERCUT EXCAVATION. PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 100 95 M PROP. EMBANKMENT CREST EL = 99.0' EXTERIOR ADD V MIN. EMBANKMENT FILL INTERIOR EX. ENDWALL ------'- ---- --"---- NORMAL POOL WATER EL. = 95.5' -� ----- V OVERCUT EXCAVATION 01 EL. 91.58 ------- --- REMOVE EXCESS SEDIMENT 2 RIP RAP �` `.� 59.22 R 2' CLASS ---------- - / ENDWALL PROP. EXISTING GRADE ------------------------------- CEDAR CREEK RD. 100 95 •EG 8&0 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 800 13+50 EXTERIOR INTERIOR 100 95 w CLASS 2 RIP RAP _ NORMAL POOL - _ WATER EL. - 95.5' ------------------------- ------------- - 2' � - ,, •� CEDAR CREEK RD. GRADE i EXISTING i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------- ------------ --------- --i i w 1' OVERCUT EXCAVATION v - f 100 95 8T20 110 160 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 805 13+00 EXTERIOR INTERIOR 100 95 091 06 -------------------------------------------------------- PROP. SPILLWAY CREST EL. = 95.5' 8" CONC. CAP DETAIL SH. C-503) _ EXCAVATE REPLACE EMBANKMENT _ NORMAL WATER POOL EL. = 95.5' (SEE ------- ---- EX. SOIL AND W/ FILL EL. 90.66 - ---'-� ,�• i �,�• �\ CEDAR CREEK i 2' CLASS 2 RIP RAP RD. EXISTING GRADE i --------------------------------------- ------------------------ i \ CLAY CORE 100 95 MA F:M 8&0 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 800 12+50 EXTERIOR INTERIOR 100 95 90 8 100 95 90 1700 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 10D7 12+00 PROP. EMBANKMENT CREST EL. = 99.0' 6" COMPACT ABC DRIVE CEDAR CREEK RD. i i i EL. 95.06 3 _ NORMAL POOL WATER EL. = 95.5' • �\ EL. 91.85 EXISTING GRADE -' - - ------------ 1' OVERCUT - EXCAVATION ----- ------- BEFORpe PROFILE SHEET HORIZONTAL: 1" = 10' FA5400 Trinity Road Q�' vQ�`' °God JESSUP'S MILL POND DAM REPAIR VERTICAL: 1" = 5' CROSS-SECTION VIEWS Suite 107 �� • NORTH CAROLINA WILDLIFE PAPER SIZE24"X36" STA. 12+00 - STA. 13+50 Raleigh, NC 27607 , 1 OFFICE MANAGER DESIGNER 919.378.9111 10 N RESOURCES COMMISSION BJR MMG C=302 C9 I I I � NC Firm License # C-0459 Q�- GING QPROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # m cg i I lassociates. com CUMBERLAND COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION IDS MH OCTOBER, 2019 19.00117 N/A GRADING AND EMBANKMENT NOTES: 1. EMBANKMENT GRADING FOR LOCATIONS WHERE EMBANKMENT TOP ELEVATION IS BELOW 99.0' ONLY AND/OR LIMITS SHOWN IN THE PLAN SHEETS. MAINTAIN EXISTING WHERE TOP ELEVATION IS ABOVE 99.0' 2. A MINIMUM OF 1 FT OVERCUT EXCAVATION IS REQUIRED PRIOR TO PLACEMENT OF FILL/GRADING. 3. ALL ADDITIONAL FILL PLACED OVER EXISTING SLOPES SHALL BE BENCHED IN 1FT VERTICAL INCREMENTS INTO THE EXISTING SLOPE. 4. OVERCUT MATERIAL NOT SUITABLE FOR FILL SHALL BE HAULED OFFSITE AND SHALL BE PROPERLY DISPOSED. 5. GRADING (INCLUDING OVERCUT EXCAVATION) SHALL BE EXTENDED MIN. 50' BEYOND THE LIMIT OF PROPOSED WORK TO TIE TO EXISTING GROUND AREAS BELOW 99.0'. 6. WORK DESCRIBED ABOVE SHALL BE INCLUDED IN THE LUMP SUM BID PRICE. UNSUITABLE MATERIAL ENCOUNTERED BELOW 1 FT OVERCUT EXCAVATION AND EXCAVATION LIMITS SHOWN ON THE PLANS SHALL BE PAID AT THE UNIT BID PRICE FOR UNDERCUT EXCAVATION. 100 95 -------------1- 1-- I --- CEDAR CREEK RD. EXTERIOR EXISTING GRADE ---------r- INTERIOR NORMAL POOL WATER EL. = 95.5' ------ 100 95 -T10 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90- 15+ 50 EXTERIOR INTERIOR MENESEEMEREM"w 95 ------------------ CEDAR CREEK RD.- -1 EXISTING GRADE -- i----------- ��i _ NORMAL POOL WATER EL. = 95.5' 95 -T10 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 go- 15+00 EXTERIOR INTERIOR �.M"w 95 CEDAR CREEK RD. -------------------------- ---------------------------- ---- EXISTING GRADE _ NORMAL POOL WATER EL. = 95.5' 95 -T10 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90- 14+ 50 EXTERIOR INTERIOR 100 95 Q 0 0 v 99.0 ---. -- EXISTING GRADE --� ---------- 1' EMBANKMENT FILL NORMAL POOL WATER EL. = 95.5' ' CEDAR CREEK RD. _ EL. 91I.A.5 -- ` 53.07 1' OVERCUT EXCAVATI N --- -------- - - 100 we 8f30 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 7d5 14+00 5400 Trinity Road P� Suite 107 Raleigh, NC 27607 C9 919.378.9111 !,� NC Firm License # C-0459 Q� m cg i I lassociates. com a JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION GING QCUMBERLAND COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION PROFILE HORIZONTAL: 1" = 10' VERTICAL: 1" = 5' PAPER SIZE 24"X36" OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER IDS MH PRELIMINARY - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION CROSS-SECTION VIEWS STA. 14+00 - STA. 15+50 DATE PROJECT # FUNDING # OCTOBER, 2019 1 19.00117 N/A SHEET C=303 I r+j PLAN G 9 G I I I I I[ -- � I I 4 I I 1 I -�-� - - -- --- L DDWEL OPTIOttAL CONSTALICTIDN JOINT REMOVE EXCESS SEDIMENT ELEVATION i i INV. OUT = 89.64' PROP. (3) 7' WIDE W N, S, E WALLS EL. - W/ TRASH RACKS 8. EX. 48" R REPLACE rr r� r vvrr. r INV. EL. = 90.54' �� ,, gEFORF y C 5400 Trinity Road P Qv�' Suite 107 1 Raleigh NC 27607 919.378.9111 !,� N mcgill NC Firm License # C-0459 �i 9,�� mcgillassociate Q GING QP PROP. CONC. ENDWALL (SEE DETAIL. THIS SH.) SLOPE AS I NDI QAT'E0 ON PLANS PLACE BRODVE OR BELL END OF PIPE TO FACE OF WALL Y� (IF C❑NST. JOINT IS USED) P I FFf' #4 - BARS DGV4 E L END ELEVATION BAR- or '" DOWELS IN ENDWALL WTTH REINFORCED CONCRETE PIPE LOG. PIPE aIA. ELWLE PTPE DOUBLE PIPE 15" 16r. 24' `10„ 42. fig., 1.5- 19" 24„ 30., 38;r 42,r 40.. BARS �,xl, ,rx i, ,. X.. X. , ,r�;r r ,r V. ., „ „ ,x.. , ., „ , ,, . Yr G QTY. 2 2 3 a 4 4 2 S 0 :2 2 a 0 4 4 2 V QT-Y . - - - - - _ _ 1 t 2 2 2 3 G on. 2 2 121 3 1 4 4 5 2 3 3 4 A 5 TOTAL LBS. 1 9 1 9 1 14 14 1 14 65 65 12 12 23 T7 E12 DIMENS10#F8 AND CONCRETE OUANTIT 1ES USING C011CRETE PIPE COMMUN DIMENSIONS SINGLE PIPE DIDUBLE PIPE D R T L VD3 L VDI „ r� r, N rG r. ,,4 21 i, D ,-5 5'- 0.7 ,M 2 -2' N 7r-8 1.0 18" 3r-7" 1'-10" 3'-2" 21A " 10" 5'-A" 1.1) 2'-7" 13r-1 t" 1.3 24" 4'-2" 2'-1" 4'-13" 3 10" $'-U" 1.5 31-5" 1 t'-6" 2.a 0r' 15'-0" 2'-e" 4'-7" 444" 11%'P a'-2" 13'-5 3.1 '35'' 2'-all e_8r. 5.-8,, ,r TI A 11r-�,. r21.a V .4 �gar-r1" 1-4r'' 1C3'-oil 4.5 42" IE'-2„ 3,_111 81-4" 51..," 1142" 7:R'-8" 4.5 5'-10" 18'-8" 6.0 'SEE SHEET 3 PROP. EMBANKMENT CREST EL. = 99.0' EX. GRADE 4 L�J Sri b E Cc- W =0C.S < iI­-LL 0 Lij LU � J� = LU c CC CC LL LU Uj CL CL C 0 � LU LU J 00 ca fr 0 ! -!EET 1 GF "' 838.01 -. FLAT ROOF RECTANGULAR RACKS/WEIRS (STANDARD SIZES) DIMENSIONS IN INCHES TO THE NEAREST 1/4" HOST STRUCTURE INSIDE DIMENS164S LENGTH WALL THICKNESS (REQUIRED) WOTH 'AS DISTRIBUTED BY CONTEW CONSTRUCT10N PRODUCTS NATIONALLY* WIDTN A 11 3$ 116 3 4 22 S 27 f 32 7 8 38 1 A 43 8 8 4 54 318 15.g 3 4 55 1/15 170 1 2- 175 7 81 7 9 187 1 4 CODE 1 02 1 03 1 04 1 05 1 06 1 07 1 08 1 09 110 11 1 12 1 13 1 14 1 T 5 1 16 Lf=NQTH E 11 3$ 116 3 4- 122 I B 127 1 52 7 ZB j 38 1 4 14.3 5/BI 49 154 318 159 3 4 165 1 JE 70 1 75 7 8 181 7-S 187 1 4 CAE 02 03 1 04 05 0 07 08 0J 10 1 11 1 12 1 13 1 14 1 15 1 16 HEI FIT C 17 1 2 112 7 8 CODE 01 02 1 GRID 2 GRID HIGH HIGH l�IiC1>I ■iiC !tM MtME PM IL OM A. SkiII- •oo 'MET D ESTER, DHIG 45C69 fi}p33 n. r.$M2j rA ; ,ri13145.73Aw 0 mffmw PROP. (3) 7' WIDE WEIRS ON N. S. E, WALLS EL = 95.5' -_------------ - - - - REPLACE 48" PIPE TO NEAREST - - JOINT 10'X10' RISER STRUCTURE N TS NO. I DATE I BY DESCRIPTION EX. 48" RCP EMABKMENT CROSS SECTION N TS TORMRAX TRASH RACK EE DETAIL, THIS SH.) TOP OF RISER EL. - 97.4' STRUCTURE STEPS (SEE DETAIL SH. C-502) L. = 91.0' 8' VALVE STEM EXTENSION W/ REMOVABLE T-BAR HANDLE 10" GATE VALVE 10" PVC ORIFICE INV. = 91.0' INV. EL. = 90.54' SCREW ON PVC CAP ADJUSTABLE GATE VALVE SUPPORT 10" PVC TEE FLAT ROOF (FR) WDTH (A) LENGTH (B) HEIGHT (C) COSTGMER: PROJECT: STORMRAX TRASH RACK (SEE DETAIL, THIS SH.) 8' VALVE STEM EXTENSION W/ REMOVABLE T-BAR HANDLE 10" GATE VALVE 12"#5 DOWELS AT 12" SPACING PROP. 8" 5'X5' CONC. APRON EL. = 89.0' NOTE: ALL PVC PIPES AND FITTINGS SHALL BE SCHEDULE 80. 4 44 ` 4 ORIFICE DETAIL N TS JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA APRON PAPER SIZE 24"X36" PROP. 10" ORIFICE W/ TEE INV. EL. = 91.0' (SEE DETAIL, THIS SH.) DATE: DRAWN BY. APP'D BY: DETAIL: PRELIMINARY - FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION OUTLET STRUCTURE DETAILS OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # IDS MH OCTOBER, 2019 19.00117 N/A SHEET C=501 O O C A CLR. TYP. ` #4 RESARS ' �k {Ck - - - - - - -I I L M 1 I ri I m #5 REBARS 12 CENTEFtS T-yP SECTION }A -A' 11 { o #4 P BARS + 4 WAFFLE WALL PLAN V I EVIL 6ri 7Lr rr IF ' 1 MIN. CLA . W W Lu ' YIN ( LAP Y F m rt ONREBARS $' , #5 REBARS 12" CENTERS (TYP. ) j-41 SECTION ` - C' I' %LN i [} #4 REBARS � 1 + M I Lu m M I+ Q k I ' I --I , f-r I � + CC 4 #5 REBARS a .{ ��12"GENTER5 - ECTION '13 � � H C THE PATTERN OF THE QD KNOCK -OUT PANELS ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. 1'' MIN. CLR.�TN '� .+ P. .{ 'i w + • . Il '{ 1 .•J • Ck t t :W t •� CLR.ITYR) ��WAFFLE BALL ISOMETRIC VIEW 4x4 4xW4 WWF ( LAP #5 R E SARS @ 12 , WWF 61' 0N- CENTERS (HORI. Y TO REBAFIS ) & VERT . ) ( USE WITH 4' X 4' & LARDER DRAINAGE STRUCTURES TYPICAL) . SOLID WALL PLAN I EW -'' 'v' p , ' ee t .I�;+t t;� 4s { '� p' . • . 13 { ' ' • 117 PA r ' r 4 x 4 W4 xW4 ' :' • '� . { . �' •, : v' t •, Y + + Y.. �, •, �' '• INV� F LAP F' w ' �. ,�t '' ' '. , ` ` �' '. # ' • �' ;. •!.� Y I'1'M FO �7 - fit' ¢ + •'+'. ' ' �' ''• ''• 4 4 + + TO AEBARS t' y1 t ,`T+ y t ,`' . y+ #5 REBARS w �2" CENTERS TCPJCAL �` "'i tp SECTION 'D -D' SOLID WALL ISOMETRIC VIEW NOTES: INSTALL ALL STEPS PfOTRUDING 4" FROM INSIDE FACE OF STRUCTURE FALL. STEP$ DIFFERING IN DIMENSIONS, ODN FIUVRATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDE@ THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF T4E PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCA STEPS. �1 PLAN V4 r r ELEVATION PLAN 1,6 it ELEVATION U) co w 0 0 rn 0 CQM F SIDE ELEVATION CAST 180N SECTION A -A 5400 Trinity Road Suite 107 Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 m cg i I lassociates. com PLAN 0} �G r M1 i SIDE ELEVATION 9 N rl I 1 4tr ELEVATION PLAN CAST IRON #6 BAR OR #8 BAR CALV'O. SIDE ELEVATION 3 REINFORCING STEEL rtOTE : t _ DO NOT USE IN " SANITARY SEWER MANHOLES. ELEVATION NO. I DATE I BY F— < CD ■ CL W Q L� r F__ H F_0 _j oow � • �--� H� Lu n M y J cc < i w ui++.. U- 05 EL z z < d q Im Lu IL 1SHEET 1 OF 2 840.45 m 0 Lt CL �w W<<LL� H:E: ;p_ H LL O J I--1 rt � L • H r � 721 Er a. 0 UJ LL w -I Lu H Lu Q � H Q < w HE ET 7 OF 1 840-66 DESCRIPTION GENERAL NOTES: THIS PRECAST BOA{ MAY BE USED FOR THE FOLLOWING STANDARDS: 840.01, 840.02, 840.04. 840.05, 840.13, 840.14, 840.15, 840.17, 840.18, 840.19, 340.26, 84-0.2.7, B40.28, 840.31, 840.32 AND 840.41. R INSTAILL PRECAST DRAINAGE STRUCTURES AND PAY FOR IN ACCORDANCE WITH SPECIFIGATION SECTIDN 840. * DO NUT PLACE PRECAST DRAINAGE STRUCTURES UNDER TRAFFIC OR WHERE TRAFFIC WILL BE DETDUREO. USE 4000 PSI CONCRETE. PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM ASIS FOR GRADE GO AND YIELDED WIRE FABRIC CONFORMING TO ASTM Al 004. # LIMIT MAXIMUM DEPTH TO TOP OF BOTTOM SLAB FOR WAFFLE WALL STRUCTURE TO 10'-0" i LI-MIT SOLID WALL STRUCTURE TO 16' * PLACE LIFT HOLES 09 PINS Its ACCORDANCE WITH. OSHA STANDARD 1926.704. CUT OR FanM OPENINGS FOR PIPE TO PROVIDE REQUIRED SIZE AND LOCATION. OFFIENT WAFFLE WALL STRUCTURES 80 THAT PIPES ENTER THROUGH THE KNOCKOUTIWAFFLE PANELS ONLY. PIPES MAY ENTER THROUGH THE CORNERS OF SOLID WALL BOXES IF A MINIMUM OF P" OF WALL IS PROVIDED ABOVE THE HOLE. ALL ELEMENTS PRECAST TO MEET ASTM C913. * i FAME. AND GRATE HEIGHT MAY BE ADJUSTED WITH CONCRETE OR BRICK IN ACCORDANCE WITH STANDARD 640.25. PROVIDE PRECAST STRUCTURES OVER 4'-0" IN DEPTH WITH STEPS AS DIRECTED BY THE ENGINEER. -A WELDED WIRE F'A,BRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * SEAL JOINTS WITH A FLEXIBLE BUTYL RUBSEi3 BASE CONFORMING TO FEDERAL SPECIFICATION SS-S-21A3 AASHTO M-198r TYPE B - BUTYL RUBBER. * LIMIT MAXIMUM STRUCTURE SIZE TO INSIDE CLEAR DIMENSIONS OF 5'-Orr 'X 5'-00' . " THE OUTSIDE PIPE DIAMETER PLUS 2'0 OFF THE OPENING HEGUIRED FOR FRAME AND GRATE IS THE MINIMUM STRUCTURE SIZE WHICHEVER IS GREATEN. USE MANHOLE FRAME AND COVER AS INDICATED ON THE PLANS. REINFORCE GPENING AS SHOWN ON THIS SHEET. OPENING SHALI. SE LOCATED AS REQUIRED I- STEPS I I #E5 BAR S ' I OPENING L PLAN TOP SLAB PRECAST RISER PLAN JESSUP'S MILL POND DAM REPAIR NORTH CAROLINA WILDLIFE RESOURCES COMMISSION CUMBERLAND COUNTY, NORTH CAROLINA { { + �: •$' V, 41 1 < • REBARS CENTERS = '= �_ • > F -1 ' iF ISF4 r1 W < < LL @ OPNIIGi SECTION `C—Cf < C CORNER COT DETAIL WALL BOX) " 'L' OP 'W' S' #4 RE BARS f}" CPNTF;RS yy�� �y o ��77 f R4 REEBTAI�'!L l�S [� !i+ 1 r' k 6r' GAY i CFLi3 CLR *' W U- J 3- 4 4 H gn aj ir 0 L < z Z W J 'RECAST RISER DETAIL - < SECTION VIEW SECTION VIEW OPTIONAL JOINT DETAILS PAPER SIZE 24"X36" d CC � Lu Lu � SHEET 2 CF 2 840.4 PRELIMINARY — FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION OUTLET STRUCTURE DETAILS OFFICE MANAGER DESIGNER BJR MMG PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # DS MH OCTOBER, 2019 19.00117 N/A SHEET C=502 0 0 a I1 NA 9U_ -A y )V i MEMO AM ftwb M re ��� ■ PROPOSED BROAD CRESTED WEIR SECTIONS 2' CLASS 2 RIP RAP EXISTING GRADE 6" #57 WASHED STONE PRELIMINARY FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 5400 Trinity Road Suite 107 C9Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 m cg i I lassociates. com WEIR TOP EL. 95.5' 4'-0" MIN NON WOVEN GEOTEXTILE (MIRAFl 18ON OR EQUAL) 123' 8" THICK CONCRETE NON WOVEN GEOTEXTILE (MIRAFl 180N OR EQUAL) PROPOSED BROAD CRESTED WEIR SECTION A -A N TS GROOVED JOINT EXPANSION JOINT PROPOSED BROAD CRESTED WEIR SECTION B-B N TS JESSUP'S MILL POND 2.5' 2.5' 'ATERTIGHT JOINT SEALER NOTES: 1 PI ACF �" PYPANCION .101NTQ AT 95' INTPP\/AI I, - #57 STONE 4'-0" MIN. 1 1 MIN. OR AS SHOWN ON PLANS NON WOVEN GEOTEXTILE (MIRAFl 180N OR EQUAL) 2'-6" 2' CLASS 2 RIP RAP 2'-6" MIN. RIP RAP SLOPE PROTECTION DETAIL N TS PIPE OUTLET TO FLAT AREA — NO WELL DEFINED CHANNEL INSTALL FIL FABRIC #57 STONE - I� L a II SECTION A -A PIPE OUTLET TO WELL-DEFINED CHANNEL INST FABRIC OR �L�I a A I INSTALL FILTER FABRIC INSTALL NOTES #57 STONE SECTION C-C FABRIC 1. La IS THE LENGTH OF THE RIPRAP APRON 2. d= 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL—DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 5. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.41. RIPRAP APRON SIZING PLAN i~ La� SECTION B-B PLAN "7NE OUTLET PIPE DIAMETER RIPRAP SIZE APRON LENGTH APRON WIDTH APRON THICKNESS (dm1.51d.5xd5o) No. (Do) (d50) (La) (W=Do+La) ALL PIPES 48" 1.2' 16' 20' 2.5' EC 17 PIPE OUTLET PROTECTION UPDATED MARCH, 2017 NOT TO SCALE BEFORF yo SHEET G10 JESSUP'S MILL POND DAM REPAIR PAPER SIZE24"X36" SPILLWAY AND RIPRAP NORTH CAROLINA WILDLIFE PROTECTION DETAILS OFFICE MANAGER DESIGNER RESOURCES COMMISSION BJR MMG C=503 Q� GING QP� CUMBER LAND COUNTY NORTH CA RO L I NA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # NO. DATE I BY DESCRIPTION IDS MH OCTOBER, 2019 19.00117 N/A 0 0 TOP OF BANK EXISTING ROAD EC 24 36' MIN. 6" 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD FILTER FABRIC M1 50' MIN. 4'_ 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD 2"-3" COARSE AGGREGATE (RAILROAD BALLAST) FILTER FABRIC NOTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. STONE TO BE 2 - 3 INCH WASHED STONE RAILROAD BALLAST. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.06. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2- INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY CONSTRUCTION ENTRANCE REMOVED TREE THAN 40' REL REMOVE A THAN 1 /2 UPDATED MARCH, 2017 NOT TO SCALE TREE REMOVAL DETAIL 5400 Trinity Road Suite 107 Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 m cg i I lassociates. com NOT TO SCALE STANDARD HARDWARE CLOTH - EXTEND 12" POST BELOW GRADE RIP RAP FACED WITH #57 WASHED STONE - 6" THK. MIN. 0 12a GROUND-;- \ / 04 \ \/ OPTIONAL 5' x 10' x 2' DEEP SEDIMENT TRAP 8" EXCAVATE 8" x 12" TRENCH UPSLOPE ALONG LINE OF POSTS. EXTEND HARDWARE CLOTH INTO TRENCH. BACKFILL TRENCH AND COMPACT SOIL. SECTION ADDITIONAL HORIZONTAL BRACE AT OPENING 8'-0" MAX. 4' O.C. � f 111111111111 . /FA 14 MA MA Nil i1!0!��i!i!i!i!i►i!i!i!%i!i!1.ATTACH HARDWARE CLOTH TO STANDARD HARDWARE r// CLOTH - EXTEND 12" POST SECURELY WITH TIES POINTBELOW GRADE SILT FENCE OUTLET TO BE LOCATED AT LOW ELEVATION SILT FENCE OAS SPECIFIED - NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1 /3 HEIGHT OF BARRIER. 4. SILT FENCE OUTLETS SHALL BE LOCATED AT LOW POINTS IN CONTINUOUS RUNS OF SILT FENCE. EC SILT FENCE -OUTLET 2 UPDATED MARCH, 2017 NOT TO SCALE 5' STE (MIN. WIRE FENCE 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE MIN. 14 GAUGE 6"X6" WIRE 6' MAX EXTRA STRENGTH FABRIC WITHOUT UNDO' CCAI/1C 1 VI%Vvr%I\V M-WilV THE TRENCH SECTION VIEW FILTER FABRIC STEEL POST BACKFILL TRENCH EXISTING AND THORODUGHLYT GROUND UPSLOPE 8" (DISTURBED AREA) MIN. 24" \// SLOPE SLOPE LENGTH(FT) MAXIMUM AREA(SQFT) <2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 PROPOSED SILT I :o I EXISTING STREAM FENCE X PROPOSED TEMPORARY I WORK AREA PUMP AROUND x-_ i \ I IMPERVIOUS SAN'bA�DIKE P TO BE INSTALLED -' _ . _ I IN CHANNEL 3' HEIGHT X G x 1 E X X I PROPOSED SILT 1�� FENCE I .................... X ............................ ............................... .......................... ..................ii..,.n........................... I. 1...., .................................... .. .. ........................................................ . ........................... ........... .. �.. ,F . .............................................. ..................... ... ................... .................... .. ... ........................NJ .............�� ............�,.. ..• .' . li.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.........If......... 11..................................... .,,.............................................. . I......... .................. .................... ,, .......... . X:.. rt............................................... ............................................... I ' X X L........ x x ROADWAY EXISTING PIPE TO BE REPLACED I I PUMP INSTALL EARTHEN BERM TO PROTECT ( STREAM IF DEVICE WERE TO FAIL NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.62. PLAN SYMBOL MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. EC SILT FENCE UPDATED MARCH, 2017 NOT TO SCALE X I DEWATERING DEVICE - GRAVITY -BASED GEOTEXTILE FILTER BAG (US FILTER BAG OR EQUAL) A- PLACE DEWATERING DEVICE ON NO. 57 STONE PAD ENERGY I IMPERVIOUS SANDBAG DISSIPATOR I I DIKE 3' HEIGHT to PROPOSED SILT - FENCE I T PROPOSED SILT FENCE SECTION ANTS TEMPORARY STREAM BYPASS DETAIL (FOR REFERENCE ONLY) TEMPORARY BYPASS NOTES 1. Install all erosion control measures as shown in detail of Temporary Stream Bypass. 2. Construct impervious dike on upstream side of existing channel and install temporary bypass pump to divert water around construction area. 3. Construct impervious dike on downstream side of existing channel to prevent backing up of stream water into the construction area. 4. Dewater the construction area using another temporary pump and discharge water into a dewatering basin until sediment has settled and water can be discharged back into stream. 5. Begin construction of cross -culvert. Contractor shall inspect system daily before beginning any construction. No construction shall continue if system is not fully operational. 6. Any wash material removed from bypass area should be stoned outside the flood zone until construction is complete. 7. Upon completion of culvert construction, remove bypass system within (2) two calender days. 8. Stabilize all areas disturbed during construction. 9. Contractor shall receive prior approval from engineer if choosing to use another method in lieu of bypass channel. EMBANKMENT SLOPE \ DIRECTION TO MINIMIZE EXPOSURE OF TOPSOIL DISTURBED EARTH AND SOIL EROSION 28"-56" DURING TREE REMOVAL FREE DRAINING MATERIAL g 1. ALL ROOT REMOVAL OR EXCAVATION IN EXCESS OF 4' SHALL BE APPROVED AND MONITORED BY ENGINEER OR AUTHORIZED REPRESENTATIVE. 6"-12" GRAVEL 2. ESTABLISH AND MAINTAIN SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE WITH 6"-12" SAND TOE OF NCDENR LAND QUALITY REQUIREMENTS AND THE CONTRACT DOCUMENTS. �// EMBANKMENT 2. SCHEDULE REMOVAL OF A SEQUENCE OF FIVE TREES (MAXIMUM) AT ANY ONE TIME BEFORE ALL D RESULTING DISTURBED AREAS ARE REPAIRED AND COMPLETELY STABILIZED. PHASED TREE REMOVAL WILL BE CONDUCTED IN A MANNER THAT INDIVIDUAL TREES WILL NOT BE REMOVED SEEPAGE FROM WITHIN A 40 FOOT RADIUS RELATIVE TO ONE ANOTHER PRIOR TO COMPLETION OF BACKFILLING AND COMPACTION OF THE DISTURBED AREAS. THE DAM EMBANKMENT, PRIMARILY THE DOWNSTREAM SLOPE, SHALL BE CLOSELY MONITORED FOR INDICATIONS OF DISTRESS OR SEEPAGE. IF SEEPAGE IS IDENTIFIED, A REVERSE FILTER SYSTEM SHALL BE PLACED BY THE DAM SEEPAGE REPAIR DETAIL CONTRACTOR AT THE DIRECTION OF THE ENGINEER TO PERMIT SEEPAGE WATER TO EXIT THE NOT TO SCALE EMBANKMENT WITHOUT MIGRATION OF IN -SITU MATERIALS (SEE ADJACENT INSERTS). 3. ROOT MASSES ARE ANTICIPATED TO EXTEND APPROXIMATELY 3 OR 4 FEET BELOW THE SURFACE. REMOVAL OF ROOT MASSES ENCOUNTERED THAT EXTEND BELOW THIS DEPTH SHALL BE SUPERVISED BY A LICENSED PROFESSIONAL ENGINEER OR A REPRESENTATIVE ACTING UNDER HIS DIRECTION. 4. BACKFILL AND COMPACT (SIX -INCH MAXIMUM LIFTS) TO 95 PERCENT STANDARD PROCTOR; SEED PRELIMINARY AND MULCH DISTURBED AREAS WITHIN 48 HOURS OF INITIAL DISTURBANCE. - FOR REVIEW PURPOSES ONLY - 5. REMOVE ALL EROSION CONTROL DEVICES AFTER INSPECTION AND APPROVAL BY THE ENGINEER. NOT RELEASED FOR CONSTRUCTION ,BEFORF yo SHEET JESSUP'S MILL POND DAM REPAIR PAPER SIZE24"X36" MISCELLANEOUS AND ® NORTH CAROLINA WILDLIFE EROSION CONTROL DETAILS a OFFICE MANAGER DESIGNER P � RESOURCES COMMISSION BJR MMG C=504 Q� GING QP� CUMBER LAND COUNTY NORTH CA RO L I NA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # NO. DATE BY DESCRIPTION IDS MH OCTOBER, 2019 19.00117 N/A 0 0