Loading...
HomeMy WebLinkAboutNCG140009_Inspection Report_20191108ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Southern Concrete Materials Attention: Jeff Lamm Post Office Box 5395 Asheville, North Carolina 28813 NORTH CAROLINA Environmental Quality November 8, 2019 Subject: Compliance Evaluation Inspection Permit: NCG140000 Certificate of Coverage: NCG140009 Macon County, North Carolina Dear Mr. Lamm: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on November 6, 2019. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer r__ Isaiah Reed, CPSWQ, C SCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E QJ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 701 Swannanoa, North Carolina 28778 NOH1HCNiJ'JNP o.yvermnmcnwim.oww.ub 828.296.4500 Compliance Inspection Report Permit: NCG140009 Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Concrete Materials SOC: Effective: Expiration: Facility: Southern Concrete Mat -Macon County: Macon 49 Wells Grove Rd Region: Asheville Franklin NC 28734 Contact Person: Jason Greene Title: Phone: 828-707-8502 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/06/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: EntryTime: 11:OOAM Exit Time: 12:15PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant E Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140009 Owner -Facility: Southern Concrete Materials Inspection Date: 11/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On November 6, 2019 this facility was inspected for compliance. I met with Bill Price on site. During the inspection, the following items were noted: 1) The location of the monitoring records was not clear, and the distinction between the wastewater and stormwater monitoring records was not clearly distinguished. The extent of the monitoring records could not be fully evaluated at the time of the inspection. A more thorough records review will be performed during the follow-up inspection. The permittee is directed to locate and include all monitoring records in the Stormwater Pollution Prevention plan. 2) Secondary containment for the add/mix and other chemicals was not provided in all locations. The treatment basins were discharging at the time of the inspection, demonstrating that they do not functionally contain any spill that may reach them. The permittee is directed to immediately begin efforts to provide secondary containment for all bulk storage of liquid materials on site. If the maintenance of the treatment area on site will provide secondary containment in the future, documentation of that analysis and calculation is required. 3) The drain valve for the secondary containment drain valve at the fuel storage was open at the time of the inspection. The permittee is directed to include inspection of that valve in future inspections at the facility, and to provide a lock for the drain valve. Please give the above items your immediate attention. This facility will be re -inspected on or after December 12, 2019. If the above items are not addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG140009 Owner - Facility: Southern Concrete Materials Inspection Date: 11/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including ouifall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative ouifall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment Page 3 of 3