Loading...
HomeMy WebLinkAboutSW6191004_PN_95396_Multipurpose_Training_Facility_SWM_and_ES_Calcs_Narrative_11/7/2019CIVIL CALCULATIONS SOTF Multipurpose Training Facility PN 95396 The civil calculations attached are for the storm water management and erosion and sediment control analysis. 100% Submittal: 12 July 2019 Prepared by: 5 Stantec Stantec Consulting Services Inc. 801 Jones Franklin Road, Suite 300 Raleigh, North Carolina, 27606 (919) 851-6866 //Fax (919) 851-7024 caRo Ro. �oeoFEssio'�,� = SEAL = 49 _ LNG I S P� \9%212099 TABLE OF CONTENTS Sediment Erosion Control and Stormwater Management Project Narrative....................................................................................................................01 NRCS Report..............................................................................................................03 EISA Section 438 Calculations.................................................................................07 Rip -Rap Outlet Protection Sizing............................................................................16 Water Quality Volume Calcs...................................................................................18 Channel Sizing and Velocity Calcs..........................................................................23 DrainageArea Maps................................................................................................28 Ft. Bragg, SOTF Multi -Purpose Training Facility Project Sediment Erosion Control and Stormwater Management Narrative The proposed project known as Fort Bragg SOTF Multi -Purpose Training Facility project consists of a new concrete training facility along with access/maintenance roads, and storm drainage. The new training structure is similar to a walk -out basement in terms of grading and access app asphalt parking lot, concrete pavement, and stormwater management infiltration basin #1 - #2. This report presents the sediment and erosion control and stormwater management calculations for the project. The property is located on Fort Bragg in Cumberland County, North Carolina with access to the site from Lamont Road. The project is located in the north/northwest portion of the compound. The scope of work for the project includes civil site work and minor electrical site utilities design along with clearing and grubbing of existing trees. The project is located in a wooded area on the north side of a crowned highpoint which drains primarily to the north and east with a smaller share of drainage to the southeast. The site consists primarily of hydrologic Group A soils (see NRCS report) which has been corroborated with favorable infiltration rates (3.3 in/hr and 2.02 in/hr—see geotechnical report submitted under separate cover). SEDIMENT AND EROSION CONTROL The site sits on a crowned high point with gradual slopes typically less than 6% within the limits of disturbance (LOD). The primary disturbance activity for the construction of the facility will be excavation; therefore, the primary means of sediment leaving the site will be within storm drain systems and in the initial stage of clearing and utility trenching. The perimeter is protected with a combination of sediment fence, J-hooks, and sediment fence outlets. The storm drain system will use inlet protection and rip -rap outlet protection to prevent sediment laden water from leaving site. There is only one point of entry/exit to the site where a temporary construction entrance/exit is located (the western most edge of the LOD). A concrete washout station is also provided near the entrance/exit. All stormwater facilities will be constructed last, once all drainage areas have been stabilized. STORMWATER MANAGEMENT The site has been broken down into two main drainage areas (one for each infiltration trench) for the purposes of determining the required stormwater management volume requirements for each infiltration basin. The site has been graded to capture all the impervious areas either in storm drain systems or surface flow via swales and sheet flow. The impervious areas consist mainly of the concrete roof/pad of the training facility and the maintenance/crane access road which is comprised of 12 inches of NCDOT #4 washed stone laid on geotextile fabric. The northwestern portion of the site Page 1 of 29 is captured primarily through a storm drain network with false sumps at manholes with grated inlet tops. This network outfalls to an infiltration trench: SWM#2. The northeastern portion of the site enters SWM #2 via sheet flow. The southeastern portion of the site primarily enters SWM#2 via a small swale with a small portion entering via an inlet which drains via 15" RCP (Gov. mandated minimum pipe size) to an outfall. The southwestern portion of the site drains to a SWM#1, an infiltration trench, which is a graded as a false sump. A rock weir overflow was designed for this facility to channel the water through a specific part of the berm such that the overflow would not enter the channel leading to SWM #2. Due to the nature of the site (heavily wooded and training activities), the facilities have been oversized to ensure longevity and prevent stormwater issues at the site. Page 2 of 29 _ _ / / \ : ) : § ( y ( q ( \ __ __ Occ%w m%m «%m 23 ,z,a g / &o �/ / _ __ __ OCC%M m%m / / \ : —) \ ` �j 0 §k § § 2g ) / \ ( < \ z ) @ ( f t f oo / .6 _ / � J 2 7 ) e ) j k / ) \ @ §/ §C/) ) �\ �! ` _ _) = 22 / ] z Q z «% ! Page sy» 0 Z /W V W J a Q N — N 7 U) m U O 0-0 O U y a) U O O O) E ai Q m Q m m NE E 32 y 0) 0 O O " N m (6 O- p O U m a) _0y E y > O O a) C > Q O -0 U) 6 > m 0 m rn E E m m 0 a)m m E N O C m N y U) a) m E rn rn E a) U — a) -0 m y E N 7 O N N U) a) m m wE UU)i O O m O N a) UU) a) m N m m a) I N 6 C `p V O -C y -O m U) 3 C m Q E C U)NN O E U) » - '— a) N O O- O O m E —0 Cc: U m m ay) a�i `� 00 o Q " aaaci U) a) U) U) (n O N L -6 a) -p m Z O o Z N n 2� -6 E v'i o > CL m 0 a w a) U) m 2 p Q O a) O a) m E U m m W CL N m U)mCLy m L U N y a) O C N p m _ m D O_ O a) a) p N O w Q >+ � U U .�.. 0 a) > �_ � p -O rn O- U) O m p_ E E T m a) N 2 E- '� m m O-0 m O O_ a) N E N a) 7 u) U 2 jn U) a) .o Q w '6 a) a) O � N a) m-0 a) m o a) U)J N .y a) m 0 fOA O- C O Q Utl) i a) -6 O -0 a) Z E U O a) m m .o a) a) °) m m a) m 0 N p_ "-0 E O >, L N N m m O 'm6 N m m N E O a) 0 C m U) L (6 U .N C Q m O -O m T aa) O ` a) E Q m-aEO a) _ 0 0 a) y O4(5 fOA (n i O y U O O_ a) (n a) E O N O. L a) C E FL E cn U U O 6 Q m H o UScn cn D v m H U .9 5 a) R y N C N L R C- o U L 0 o a R a a 0 R L m o m a R y w m `o m U U 0 Z in O Q R R C 0 7 0 a tt ( O R R rt 45 R F m o R a o O w y 0) `o y a o > w H 2) a° o a 0 0 0 c Q v rn Q m 0 Z rn Q 16 co co Q v) R .j R 0 0 a y O m -0 0 0 0 o a. o 0 a m m 0 Z rn Q a m m S t t tj � � t � ■ ■ ■ ■ 1 { 1 Q co m Z Page 4 of 29 Hydrologic Soil Group —Cumberland County, North Carolina Soil Map - Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand, 2 to 8 percent slopes C 1.0 11.3% BaD Blaney loamy sand, 8 to 15 percent slopes C 0.2 1.9% TR Torhunta and Lynn Haven soils A/D 0.7 8.1 % WaB Wagram loamy sand, 0 to 6 percent slopes A 6.9 78.6% Totals for Area of Interest 8.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2019 Page 3 of 4 Page 5 of 29 Hydrologic Soil Group —Cumberland County, North Carolina Soil Map Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2019 Page 4 of 4 Page 6 of 29 F. W W H J J Q W Page 7 of 29 LAND USE To calculate the EISA runoff requirement enter the pre- and post -project land use in acres The runoff volume difference between pre- and past -project is the Z A volume required to be retained on site - Note: If the runoff di f'erence is a negative number, the post -project rolume is reduced horn the pre -project condition and no additional retention volume is reTlkm Land Use Wooded (poor): Wooded (fair): 36 Pre -project Pexcentag-e iu acres of site 0 4 0 0 Post -project Percentage area in acres of site 4 0 Runoff volume calculations -pre--project Post -project Dffere mite CN: 30 61 Wooded (good): 30 65 100 3aO 0 0 Acre-feet: 0-000 0-012 0-01 t Meadow: 39 0 0 0 Gallons: 0 3895 3895 Brush and weeds (poor): 48 0 0 0 Cubic feet: 0 521 321 Brush and weeds (fair): 35 0 0 0 US: 0-00 0-01 0.01 Brush and weeds (good): 0 0 4 51 cubic feet is the EIA runoff Lavin: 49 0 2-771 75-9 volume required to be retained Roads and drives (wlo C and G): 83 0 0 0 0 on site. Roads and drives (wf C and G): 98 0 0 0-563 13-4 Parting, driveways and sidewalks: 98 0 0 0 o Building roof: gg 0 0 0.316 8.66 Bare soil: 0 0 0 0 Trees - grassy (poor): 0 0 0 0 Trees - grassy (fair): 43 0 0 0 0 Trees - grassy (good): 32 0 0 0 0 Open space (lawns, parks, cem-) <50% 68 0 0 0 0 Open space (lams, parks, cem-) <75%gr 49 0 0 0 0 Open space (lawns, parks, aem-) >75%9grass: 39 0 0 0 0 Gravel road: Dirt road: MA TOTAL LIMIT OF DISTURBANCE = 3.65 Page 8 of 29 LO 0) ii 7 7 75 i 0 11 Page 9 of 29 H Q H J_ LL z rq it ,I I Iv rW r_ J Q LL J 'o _H Z 2 Page 10 of 29 1-bite Info 2--Runoff FBioretention wale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Quality LAND USE To calculate the EISA runoff requirement enter the pre and post -project land use in acres The runoff volume difference between pre- and post -project is the E15A volume required to be retained on site - Note: IF the runoff difference is a negative number, the post -project r-olume is reduced from the pre -project condition and no additional retention r-olume is required - Land Use pro Percentage P°st-pF°1 Runoff volume calculations of siteres��� area in acres V4�oaded ( oar)- � Avirm Prepr4tect host protect Diere� r Wooded (fair): Wooded (good): Meadow: Brush and weeds (poor): Brush and weeds (fair): Brush and weeds (good): Lavin: Roads and drives (wlo C. and G): Roads and drives (wl C. and G): Parking. driveways and sidewalks: Building roof - Bare soil: Trees - grassy (poor): Trees - grassy (fair): Trees - grassy (good): Open space (lawns, parks, cem-) <50% Open space (lawns, parks, cem-) <75% Open space (lawns, parks, cem-) >75% Gravel road: Dirt road: IEel I/_141ILTA IIIto] a0lF-Ilhlilk] 1-00to] ; Me]11-Y) Page 11 of 29 Page 12 of 29 H Q GC H J_ LL z N it t� rW r_ J Q LL J z Page 13 of 29 Multi -Purpose Trainer W7/10/2019 UP N 95396 1+IT1�I View C' t Pie�v Repork Add PYojec# I Delete Project � Retention volume pro,, i + 0 1-bite Info 2-Runoff Bi retentian I Swale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Quality L.AN D USE To calculate the ESA runoff requirement enter the pre- and post -project land use in acres The runoff volume difference between pre- and post -project is the EISA volume required to be retained on site_ Note: IF the runoff difference is a negative number, the post-projEct volume is reduced from the pre -project condition and no additional retention vol _AL_ _AL_ Land We Pre -project Percentage Past -project. Peroenta Runoff volume calculations 'Eq in acres Of site area in acres Of sitePW dn � Pr,—pnaJeet Post pra}ect Dierence Wooded (poor): 45 0 0 0 Wooded (fair): 36 0 0 0 Site C: 30 63 41 Wooded (good): 30 2.25 0 0 Acre-feet: 0.000 0.011 0.011 4leadow: 39 0 0 0 0 Gallons: 0 3677 3677 Brush and reeds (poor): 48 0 0 0 0 Cubic feet: 0 492 492 Brush and reeds (fair): 35 0 0 0 0 CFS: 0.00 0.01 Brush and weeds (good): 30 0 0 0 0 IP 492 cubic feet is the EI SA runoff' Lavin: 49 0 1.63 72.4 volume recjuired to be retained Roads and drives (w/o C and G): 83 0 0 0 on site. Roads and driyes (w/ C and G): 98 0 0 0 Parking, driveways and sidewalks: 9130 0 0 0.3 5 S 1 S_ 9 Building roof- 99 0 0 0.262 11.6 Bare soil: 0 0 0 0 Trees - grassy (poor): 57 0 0 Trees - grassy (fair): 43 0 0 0 Trees - grassy (good): 32 0 0 0 0 Open space (lawns, parks, cem_) <50%grass: 68 0 0 0 0 Open space (lawns, parks, cem-) <75%grass: 49 0 0 0 Open space (lawns, parks, cem-) >75% a 39 0 0 0 Gravel road: 0 0 Dirt road: 0 0 TOTAL LIMIT OF DISTURBANCE = 2.25 Page 14 of 29 Page 15 of 29 — DATE 20190703 DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) / X / PROJECT NAME Multipurpose Training Facility P70-77M 0 178451232 Fort Bragg, NC MTB UHLUKLU BY UL5 Storm Outlet Structure - A7 FES No.= A7 Pipe Dia= 15 in Q 10 = 2.76 cfs Qfull = 4.52 cfs Vfu l l = 3.7 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone D50 DmAx Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Storm Outlet Structure - B2 FES No.= B2 Pipe Dia= 15 in Q 10 = 2.64 cfs Qfull = 4.80 cfs Vfu l l = 3.90 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s 3 Length Zone Dso DmAx Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Q10/Qfull = 0.61 V/Vfu I = 1.05 V = 3.8 fps = 1 = 4 in = 6 in = A = 12 in = 5 ft = 4 ft Q10/Qfull = 0.55 V/Vfu I = 1.02 V = 4.0 fps = 1 = 4 in = 6 in = A = 12 in = 5 ft = 4 ft Page 16 of 29 ' ' • • DATE 20190703 DESIGN PHASE PRELIM CONSTR / X / REVISION RECORD OTHER (SPECIFY) PROJECT NAME Multipurpose Training Facility PROJECT NO 178451232 LOCATION Fort Bragg, NC BY MTB CHECKED BY DLS Storm Outlet Structure C-1 and C-2 FES No.= *N/A Pipe Dia= 12 in Q 10 = 2.84 cfs Qfull = 3.56 cfs Vfu l l = 4.53 fps From Fig. 8.06.b.1: Zone From Fig. 8.06.b.2: D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width = 3xDia *Culvert Projecting from Fill Q10/Qfull = 0.80 V/Vfu I = 1.11 V = 5.0 fps = 1 = 4 in = 6 in = A = 12 in = 4 ft = 3 ft Page 17 of 29 10/3/2019 NCDEQ BMP Manual INFILTRATION BASIN #1 & #2 1.0" Water Quality Volume (WQv) (ACTUAL DRAINAGE AREA TO SWM DEVICE) Rv = runoff coefficient (Runoff/Rainfall) Rv = 0.05 + 0.009(I) Where "I" = % Impervious ("Simple Method" - Schueler, 1987) WQv = 1.0"RvA 12 Infiltration Basin #1 Fill in Values: tO.259 DA Impervious Area (Ex. & Prop.) "I"= 4 Percent Impervious of DA "A" = *DA (Acres) *Offiste area = 4,261 SF Answer: WQv = 0.022 Ac. Ft. 976 Cubic Feet Required 2,244 Cubic Feet Provided Infiltration Basin #2 Fill in Values: 0.606 DA Impervious Area (Ex. & Prop.) "I" = T7.3409J Percent Impervious of DA "A" = 2.215 *DA (Acres) *Offiste area = 6,045 SF Answer: WQv = N Ac. Ft. Cubic Feet Required Cubic Feet Provided = 11 282 SF impervious area A = Actual Drainage Area to SWM Device Rv= 0.374732 WQv= 0.37 inches CN(WQv)= 91.4 Use to comp. Qj-- = 26 380 SF impervious area A = Actual Drainage Area to SWM Device Rv= 0.296068 WQv= 0.30 inches CN(WQv)= 89.3 Use to comp. Qj-- Infiltration Basin #1 SA = DV (K/12/FS*T) DV= 2,244.40 cu ft K= 3.30 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) = 227 Surface Area Provided = 1 724 Infiltration Basin #2 SA = DV 0.718 *DA (Acres (K/12/FS*T) DV= 2,684.63 cu ft K= 2.02 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) = 443 Surface Area Provided = 1,391 NC DEQ Draw Down Time: Infiltration Basin #1 Total Volume (Exluding Surface Storage): 2,244 cu.ft. Infiltration Bottom Area: 724 sq ft. Maximum Release Time: 72 hrs Overflow Berm Elev: 244.50 Bottom of Basin: 1 243.00 Infiltration Rate: 1 3.30 in/hr (Boring 1-02) Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 243.00 Draw Down Time for only Infiltration with FS: 23 hrs OK Infiltration Basin #2 Total Volume (Exluding Surface Storage): 2,685 cu.ft. Infiltration Bottom Area: 1,391 sq ft. Maximum Release Time: 72 hrs Overflow Elev: 224.10 Bottom of Basin: 1 223.77 Infiltration Rate: 1 2.02 in/hr (Boring 1-01) Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 223.77 Draw Down Time for only Infiltration with FS: F 23 hrs OK DRAINAGE AREA & IMPERVIOUS AREA Pre -Development Impervious Area (Within Drainage Areas) Infilt #1 0 SF Infilt #2 0 SF Post Development Impervious Area (Prop. & Ex.) (Within Drainage Area) Infilt #1 11,282 SF Infilt #2 26,380 SF Post Development Impervious Area (Prop. & Ex.) (Excudes Gravel) Infilt #1 2,352 SF Infilt #2 10,785 SF Project Limit of Disturbance (Using as Project Area) LOD 158,994 SF Pre -Development Impervious Area (Within LOD) LOD 0 SF Post Development Impervious Area (Prop. & Ex.) (Within LOD) LOD 37,662 SF Post Development Impervious Area (Prop. & Ex.) (Excludes Gravel) LOD 13,137 SF 1.0" Volume For Project Area (LOD) Using Simple Method Per Runoff Volume Simple Method NCDEQ Stormwater BMP Manual PRE -DEVELOPMENT RVPRE = 0.05 + 0.9 * IA _ Existing Site Impervious Area IA Total Area (Project Area) _ 0 IA 158,994 1A = 0.00 RVPRE = 0.05 POST DEVELOPMENT RvPosT = 0.05 + 0.9 * 1A _ Developed Site Impervious Area (Prop. & Ex.) IA Total Area (Project Area) 37,662 IA_ 158,994 1A = 0.24 RVPosT = 0.26 RvPosT = 0.12 (NO Gravel) Newly created Impervious area for the Project = 37,662 SF 1.0" VOLUME REQUIRED For Project Area (LOD) Using Simple Method Simple Method V = 3630 * P * (RVPOST - RVPRE) * DA P (1.0") = 1 IN DA = 158,994 SF DA = 3.65 AC V = 3,487 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (DOES NOT FACTOR IN PRE -CONDITIONS IMP. AREA, REMOVES Rvpre FROM EQUATION) V = 1,648 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (EXCLUDES GRAVEL) STORMWATER VOLUME SUMMARY CALCULATIONS VOLUME @ TOP OF TOP OF INFILTRATION SURFACE AREA @ DEPTH OF PONDING *VOL. **INFILTRATIO TOTAL TOP OF ***BOTTOM OVERFL EMBANK IMPERVIOUS BASIN # BOTTOM PONDING (TOP OF VOIDS N RATE VOLUME BASIN OF BASIN SHWT OW MENT AREA TREATING OVERFLO INLET PONDING W INLET) (SF) (FT) (CF) (CF) (IN/HR) (CF) (FT) (FT) (FT) (FT) (FT) (SF) 1 724 1.50 1,086 1,158 3.30 2,244 243.00 238.33 >236.33 244.50 244.50 11,282 2 1,391 0.33 459 2,226 2.02 2,685 223.77 219.10 >217.00 224.10 224.10 26,380 *Assumes a Void Ratio of 0.4 for the 1.5-2.5 inch speficied stone. Accounts for only the 4 feet of stone does not include pea gravel and sand. ** Based on observation from the geotechnical engineer SHWT = Seasonal High Water Table ***The bottom of sand filter layer where in -situ infiltration rate occurs Impervious Area Treating 37,662 sf Newly created Impervious Area 37,662 sf 1.0" WQV Required, Project Area (LOD) (Simple Method, Pre -Development Conditions NOT Considered) 3,487 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered) 3,357 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered, NO Gravel) 1,648 cf 1.0" WQV Provided 4,929 cf Ten Cwmcaner uvuid used: Municipal water depth f water iaW: r m' water Temp ( l Pic ray °F iest4OCirtiDn: 1-01 Qepth of Observed wirtar 26.4 inches tkmnlmmtr tEIpEIctty Ljquzinqrr. np cm Signs ruby 1L sge 7 u . k2n Flow ratq ur." Ios Halm DianurW.. 2A iruheq Stare SeLuratiornc 143D Water Head: 7 inches Hale Radirn' 1.MD Halt ID"mh_ 93 iryhm Tate CUNA �_ __ TUSt-CRrn}1Vnff Uquid WkLu. t_4u1iG ft31 Water Test Lean: 1-13d Deptb & Wmer TaUe. �-96" ovru t'¢rrts: CapacHy Liquid o Wei MEWR I r.Tkq FM r.n SI�N[TI�Et IL 1 31, t�r+ge u t3 e L now ratewed: Water Term i °Fk 65 9F Depth of 06serred Water 44 inches 105 Hale [ ornetrr: 7-A inchim 5121PI Satliiatrifl: 15.0t} W64-W Head: 5 l hei Hole RddFus- 1.20D Hale Depth: 5+6 inches Est Varer I I Om m m Ml ®®®® M I I M ®® Ml ®®®® ww"W" IY--■■-■-_- HU--■■-■-_- Iii_-■■-■-_- HU__-_■■-_■-_- �U_-■■-■-_- mI==■■_■MM� mI==■■_■MM� mUJ==■■_■MM� Stabilized Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Stormwater Infiltration #1 Overflow-Q10 Trapezoidal Bottom Width (ft) = 10.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 244.50 Slope (%) = 1.85 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 2.84 Elev (ft) 246.00 245.50 245.00 244.50 244.00 Section D 2 4 6 8 10 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 12 14 Wednesday, Jul 3 2019 = 0.16 = 2.840 = 1.68 = 1.69 = 11.01 = 0.14 = 10.96 = 0.20 Depth (ft) 1.50 1.00 0.50 ffixere, -0.50 16 18 Page 23 of 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 06 / 28 / 2019 Hyd. No. 1 Channel 1 Hydrograph type = Rational Peak discharge = 2.864 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 859 cuft Drainage area = 1.250 ac Runoff coeff. = 0.29* Intensity = 7.902 in/hr Tc by User = 5.00 min OF Curve = Pope_AAF_IDF_Hydrographs.J�e/Rec limb fact = 1/1 Composite (Area/C) = [(0.950 x 0.38) + (0.300 x 0.03)] / 1.250 Q (cfs) 3.00 rM 1.00 0.00 0 1 — Hyd No. 1 Channel 1 Hyd. No. 1 -- 10 Year 2 3 4 5 6 7 8 9 Q (cfs) 3.00 2.00 1.00 1 0.00 10 Time (min) Page 24 of 29 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Channel 2 Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.420 ac Runoff coeff. Intensity = 7.902 in/hr Tc by User OF Curve = Pope_AAF_IDF_Hydrographs.J�e/Rec limb fact Composite (Area/C) = [(0.137 x 0.95) + (0.283 x 0.30)] / 0.420 Q (cfs) 2.00 1.00 0.00 0 1 — Hyd No. 2 Channel 2 Hyd. No. 2 -- 10 Year Friday, 06 / 28 / 2019 = 1.693 cfs = 5 min = 508 cuft = 0.51 * = 5.00 min = 1/1 2 3 4 5 6 7 8 9 Q (cfs) 2.00 1.00 N 0.00 10 Time (min) Page 25 of 29 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Channel 1 10 Yr Storm Rational Method Triangular Side Slopes (z:1) = 12.00, 12.00 Total Depth (ft) = 0.60 Invert Elev (ft) = 244.50 Slope (%) = 0.46 N-Value = 0.040 Calculations Compute by: Known Q Known Q (cfs) = 2.86 Elev (ft) Section 246.00 245.50 245.00 244.50 244.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jul 3 2019 = 0.50 = 2.860 = 3.00 = 0.95 = 12.04 = 0.33 = 12.00 = 0.51 2 4 6 8 10 12 14 16 18 20 Reach (ft) Page 26 of 29 Depth (ft) 1.50 1.00 0.50 ffixere, _n tin Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Channel 2 10-Yr Storm Rational Method Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 225.50 Slope (%) = 4.84 N-Value = 0.040 Calculations Compute by: Known Q Known Q (cfs) = 1.69 Elev (ft) 227.00 226.50 226.00 225.50 225.00 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Friday, Jun 28 2019 = 0.40 = 1.690 = 0.64 = 2.64 = 3.30 = 0.41 = 3.20 = 0.51 .5 1 1.5 2 2.5 3 3.5 4 4.5 Reach (ft) Page 27 of 29 Depth (ft) 1.50 1.00 0.50 -0.50 LOD LLOD 0 i� 41:9 — 242 243 .� 243 •� ,242'I_ �-� �,' \��� ( \ \\ \� �� �� �� I ��✓ 141�7 1� �� V 13 V -A \ \ r 4 7 ��Vlo 15\�� �� �� +217.8' ••-244'_ \ "'141 V L- 10\ 14 15"RCP -� 15 1 o CLASS IVS233.95 243.9 00� r� 1 1a\ �� 15 1 1s� � 10 1� ���o - —.• � s �� �� 1 \ A \ \ 43y o �a �� is v A �1D� A \ \ \ \ \ \ 233 -233 DIP 1z > 7 2q� �� 2 - 232.5 233.55 • 4 .2 '2 - � 1 0 1 12 1 235 243 _0�2� LL A '247.0'�� 13 3 240 A•• �QD �� _ / i ��� _ ��LOD �1• 45E�M �56 Y '� L(�D \D 2. <p19 28' 246 246.5 ��� SOI ROD L�D SWM#2 �2 7. 4 946.1 44.8 SD 1 Cp v-_ Z� v �� t—� D LOD OFFSITE 6 _ • �.. � � •• 8" DIP 2l1$" \� - P • A� � D SD o SDI 15"RCSD SD 15"RC - CL SAS IV�- • ) 244 243 24 241 2 0 w �� �•�•• S I#1 y<244.75 246 245.5y� 245 L 8„DI �-� •• Q +2 3 F6, �� 2455 OFF I����4 - _ �� 1 t - E E LOD . LOD 15 •!i�e246. 2455� 245.5 FFt = 233.00' 45. QS E LOD DD SWp "# 245.5 SEE GRADING i oa 7 12 LOD 2 4.5 243.5 �� SHEET CG0102 8" DIPLOD * NOTE i 233 LOD 244.5 X 245 64 5 �244.5� LOD A_ co i ® E E L 12 RC D'� 24 Ml� C SS IV246.7 245.36 cE E 4 tia 2 A ZA • 245.7 i X244.25 243.�5 23J tiN �3/ E 232.6� SD 15" RCP - CLSS IV a Lai ®X243� 235 D 5D SD� SD Sp—� 244.8 240 E + 2 ® �• • �� f 44. 243 X43.5 �DD�� ��� • X q3 E SOD J 7�a�� LOD • e _2 �> > > > • I ( �, f E\ — A LOD • • / l E 1 LDOD LOD/ LOD f ��E > J LOD �_ LOD LOD �� L06 3 LEGEND �STORMWATER MANAGEMENT DRAINAGE AREAS MANAGEMENT DRAINAGE AREAS WM10 SCALE: V=30' •• SWM DRAINAGE AREA-OFFSITE o as sa •• — SWM DRAINAGE AREA SCALE IN FEET NOT FOR CONSTRUCTION I I US Army Corps of Engineers' z a SHEET ID SWM101 LOD ��LOD ti V \ j \ 241 -7 LOD 101) LOO 1. ti - 2427 \ ✓ �� 242, - - 243 00 FIF 1 ow 243' - - �- � � + � 1 � � \ � � � �� � � � l � �1 � � � � � � � � �\ \ IF, - �--2A� 1413 7 V \ 1D 15�� 43' 7 N �� •--•o �24 - _i� c� 4 10 C S_, 15„R � 114 1 15 1 s Al DCLA SRIVS233.95 2A21 Cc) 14 � 10 15 1 1L! -45-� 14 �� 1 10� ��� 5 246�� 33 ��� DIP 4��lb \ 5 12 � 2 L �10 1 AO) 232.5 233.E1 _02� � 1 235 +247.0'\ 13 240 3 n LOD 22.8' 245 a • A31 ��� L� Q <0, ,w19 - 246 zi ; 2� 5 244.8 \ "�� SOI RO D D L�D �\ - L D F, 2 7. V 246. \ y Sa 75 RCptOn� LTB- \5 C0� �� „ DI 43�85 15,R P5D SD 15 R SD 1�„RC� - CLAS IV� 1� • x A A4 2 4 2 3 AS 2 1 2 0 sD o� V A7, A 1 /'+ 246 �.� �245 �245.50 8 „DI �CHA #1 +2g3.3' v� 24.5 �• 1g�246. E LOD 1,� �O 2 S 245.5 245.5 M': = 233\00' s L E �� LOD LOD 15 lj �� 245.5 SEEO"GRADING_ i LOD 0��• - '• - - - - - =1I- T 1V E=IN 2 3 ti f 244.5 LOD2�3.5 SHEC11 I2L2 6. �244.5\ L x�.511 14E 2%l �LO- LOD ® E 12" RC CLASS IV 67 I BLDG5 245.36 E 2a E • 01916 l0 • 24 . y . 245.7� X244.25 L� �• / C2,� 43. I 23 � J 232.G�B11 �SD i �D �15' R�P - CUSS �IV �D B2% a n f 247.9 a 243 2 35 Sp 1-1 .6 o } 244.8 �240 �2? / + �o 2 ® ��� • �� o -� S W M# 1 \ 44.50 243 9 • • �p0 o - J% F, STORM DRAIN AND CHANNEL DRAINAGE AREAS � �% �� i �l E yP0 l 7 WM10 SCALE: V" 30' V '0 QO •��� E � o sa ea LOD �� LOD �� ��• • i • > p0/11 L � SCALE IN FELT �� D �� D OD LOD LOD _ LOD LOD L10 J LEGEND •• CHANNEL DRAINAGE AREA - - - - - - STORM DRAIN DRAINAGE AREA n= 0.013 STORM DRAINAGE SCHEDULE CONTINUED - STORM DRAINAGE SCHEDULE -CONTINUED g= 208 h= 21 1= 7.92 INLET INLET INLET Cc INLET TOTAL INLET PIPE TIC TIME I Cc RUNOFF Q Q SIDE- CAPACITY SEGMENT UPPER LOWER UPSTREAM TOP PIPE FROM TO AREA AREA IMPERVIOUS RUNOFF DISCHARGE AREAS TIME TIME OF CONC. INTENSITY COEFF. DISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER (SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MIN) (MIN) (INlHR) (CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT) AO Al 7,324 0.17 25 0.46 0.61 0.17 5.00 0.00 5.00 7,92 0.46 0.61 0.00 0.0054 15 4.8 3.9 48 0.21 227.56 227.60 232.05 2.63 Al A2 19.054 0.44 27 0.47 1.64 0.44 5.00 0.00 5.00 7.92 0.47 1.64 0.00 0.0054 15 4.7 3.8 112 0.49 227.50 226.90 231.80 2.94 A2 A3 2,296 0.05 45 0.59 0.25 0,49 5.00 0.49 5.49 778 0,49 1.85 0.00 0.0037 15 3.9 3.2 68 0.36 226.80 226.55 243.90 15.74 A3 A4 2,374 0.05 39 0.66 0.24 0.54 5.00 0.84 5.84 767 0.49 2.06 0.00 0.0041 15 4.1 3.4 86 0.43 226.46 226.10 244.80 16.99 A4 A5 2,650 0.07 21 OA3 0.22 0.61 5.00 127 6.27 7.55 0.49 2.24 0.00 0.0052 15 4.7 3.8 77 0.34 226A0 225.70 243.80 16.34 AS A6 0 0.00 0.30 0.00 0.61 5.00 1.61 6.61 7.46 0.49 2.22 0.00 0.0044 15 4.3 3.5 91 0.44 225.60 225.20 241.70 14.74 A6 A7 0 0.00 0.30 0.00 0.61 5.00 2.04 7.04 7.35 0.49 2.18 0.00 0.0049 15 4.5 3.7 102 0,46 225.10 224.60 236.00 9.54 B1 B2 13,963 0.32 10 0.37 0.93 0.32 5.00 0.00 5.00 7.92 0.37 0.93 0.00 0.0056 15 4.8 3.9 270 1.15 227.50 226.00 232.65 3.79 C1 C2 27,655 0.63 41 0.57 2.84 0.63 5.00 0.00 5.00 7.92 0.57 2.84 0.00 0.0100 12 3.6 4.5 50 0.18 243.50 243.00 246.50 1.91 NOT FOR CONSTRUCTION I I US Army Corps of Engineers' z a SHEET ID SWM 102