Loading...
HomeMy WebLinkAboutNC0004987_Report_20191030�JI �EIVED/NC0ENR/0WR (� DUKE ENERGY October 24, 2019 Via Overnight Mail OCT 2 9 ?019 James Wells Vice President WG ROS Environmental, Health and Safety MOORL::SVILU. REGIONALF(ATrKA & Environmental Sciences 526 South Church Street Charlotte, NC 28202 (980)373-9646 Corey Basinger Mooresville Regional Office Regional Supervisor North Carolina Department of Environmental Quality Division of Water Resources Water Resources - Water Quality Regional Operations 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Bob Sledge North Carolina Department of Environmental Quality Water Quality Permitting Program Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Report Under Special Order by Consent — EMC SOC WQ S 17-009 Duke Energy Carolinas, LLC — Marshall Steam Station NPDES Permit NC0004987 Quarterly Progress Report for 3rd Quarter 2019 Dear Messrs. Basinger and Sledge: On behalf of Duke Energy Carolinas, LLC (DEC), I am submitting to you the Marshall Steam Station quarterly progress report that summarizes the work and activities undertaken with respect to closure of coal ash surface impoundment as required by the Marshall Steam Station NPDES Permit NC0004987 Special Order by Consent (SOC), SOC No. S17-009 Section 2.c.2). As required by the SOC, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Messrs. Basinger and Sledge October 24, 2019 Page 2 Please direct any questions concerning the Marshall Steam Station NPDES Permit NC0004987 SOC No. S 17-009 to Robert Wylie at (704) 382-4669. Sincerely, Jame Wells Vice sident, Environment, Health & Safety - Programs and Environmental Sciences Duke Energy Attachment: Marshall Steam Station Quarterly Progress Report cc: Richard Baker, Duke Energy Scott La Sala, Duke Energy George Hamrick, Duke Energy Paul Draovitch, Duke Energy Matt Hanchey, Duke Energy Randy Hart, Duke Energy NPDES PERMIT NC0004987 SPECIAL ORDER BY CONSENT EMC SOC WQ S17-009 QUARTERLY PROGRESS REPORT MARSHALL STEAM STATION OCTOBER 24, 2019 Background and Summary On April 25, 2018, Duke Energy Carolinas, LLC (DEC) and the North Carolina Environmental Management Commission entered into a Special Order by Consent — EMC SOC WQ S17-009 (SOC) applicable to the Marshall Steam Station (Marshall). This report is submitted in accordance with Section 2.c.2) of the SOC. In compliance with Section 2.c.2), this report summarizes the work and activities undertaken with respect to decanting work and closure of coal ash surface impoundments at Marshall. The quarterly reports are due no later than the last day of January, April, July, and October for the duration of the SOC, once the decanting process has begun. The Marshall Steam Station is located in Sherrills Ford, NC (Catawba County), on the west bank of Lake Norman. Lake Norman is a man-made reservoir created by the impoundment of the Catawba River. Marshall is a four -unit, 2090 megawatts, coal-fired generating facility. The Marshall Station began commercial operation in 1965 and 1966 with Units 1 and 2, respectively. Unit 3 began operation in 1969 and Unit 4 in 1970. Marshall's ash basin has a single impoundment, which is regulated by the North Carolina Department of Environmental Quality. The ash basin covers approximately 394 acres with a current ash inventory of approximately 16.8 million tons of ash as of July 2019. Marshall historically wet sluiced coal combustion residual (CCR) products into a surface impoundment located on the property. This surface impoundment is known as the Ash Basin, which is impounded by the following dam: • Active Ash Basin (CATAW-054) The Ash Basin received CCR products from its initial operation in 1965 until 2018, when wet sluicing of bottom ash ceased. In early 2005, Marshall replaced its fly ash wet sluicing operation with a dry ash handling system and began placing dry fly ash into a landfill. Marshall ceased wet sluicing of bottom ash in September 2018 when the dry bottom ash system became operational. The Ash Basin was removed from service in March 2019 upon the completion of dry bottom ash handling and diversion of all other wastewater flow to a newly lined retention basin. Decantine Status In compliance with this SOC, Duke Energy initiated design and procurement efforts in Q3 2018 for a decanting water treatment system at Marshall. Purchase Orders were awarded in January 2019 for the pad and electrical infrastructure installations, as well as a Purchase Order for the OEM water treatment supplier. Duke Energy commenced construction of the infrastructure and system in April 2019, which was .completed and began operation in September 2019. The decanting process by gravity flow began on July 16, 2019, when the stop logs were removed from the final ash basin discharge structure. Duke Energy provided advance notice for the projected start date of decanting and installation of a wastewater treatment system to NCDEQ on June 27, 2019, as required by the NPDES Permit. Written notification for the initiation of decanting per the SOC was submitted to NCDEQ on September 30, 2019. Through September 30, 2019, approximately 1.9 feet of water has been decanted from an initial depth of 16 feet. Marshall: 1