Loading...
HomeMy WebLinkAboutSW6190701_Calcs_(Ditch)_201911061360-The Farms Subdivision Ditch Calculations Overland flow time (To) calculated by Kerby Method Ditch flow time (T,h) calculated by Kirpich Method Ditch #1 Road A Sta. 0+00 to END right Tc = 28.4 min + 4.8 min = 33.2 min, use 30 min Overland Flow: 403 LF, 0.7%, n=0.4, T,,= 28.4 min Ditch Flow: 294 LF, 0.5%, Tch = 4.8 min DA = 6.57 ac C = 0.40 1 = 3.86 in/hr Q = 10.10 cfs n;+_L. u, Road A Sta. 0+00 to END left Tc = 12.9 min, use 15 min Ditch Flow: 1070 LF, 0.5%, Tch = 12.9 min DA = 1.65 ac C = 0.45 1 = 5.33 in/hr Q = 3.96 cfs Ditch #3 Road B Sta. 0+00 to Sta. 1+50 right Tc = 26.8 min + 2.5 min = 29.3 min, use 30 min Overland Flow: 330 LF, 0.6%, n=0.4, T,,v = 26.8 min Ditch Flow: 128 LF, 0.5%, Tch = 2.5 min DA = 2.87 ac C = 0.45 1 = 3.86 in/hr Q = 4.98 cfs Ditch #4 Road B Sta. 2+00 to Sta. 9+00 right Tc = 59.1 min + 4.0 min = 63.1 min, use 60 min Overland Flow: 1270 LF, 0.3%, n=0.4, T,,= 59.1 min Ditch Flow: 237 LF, 0.5%, Tch = 4.0 min DA = 9.57 ac C = 0.40 1 = 2.52 in/hr Q = 9.65 cfs Ditch #5 Road B Sta. 2+00 to Sta. 9+00 left Tc = 9.2 min, use 10 min Ditch Flow: 687 LF, 0.5%, Tch = 9.2 min DA=0.52ac C = 0.50 1 = 6.32 in/hr Q = 1.64 cfs Ditch #6 Road B Sta. 0+00 to Sta. 2+00 left Tc = 59.1 min + 6.9 min = 66 min, use 60 min Overland Flow: 1270 LF, 0.3%, n=0.4, T,,= 59.1 min Ditch Flow: 473 LF, 0.5%, Tch = 6.9 min DA = 19.70 ac C = 0.40 1 = 2.52 in/hr Q = 19.9 cfs Ditch #7 Tc= 59.1 min + 8.9 min = 68 min, use 60 min Overland Flow: 1270 LF, 0.3%, n=0.4, T,,= 59.1 min Ditch Flow: 665 LF, 0.5%, Tch = 8.9 min DA = 22.57 ac C = 0.40 1 = 2.52 in/hr Q=22.8cfs Ditch #8 Road B Sta. 9+00 to Sta. 11+50 right Tc= 36.2 min +4.1 min = 40.3 min, use 45 min Overland Flow: 545 LF, 0.45%, n=0.4, T,,= 36.2 min Ditch Flow: 245 LF, 0.5%, Tc = 4.1 min DA = 1.53 ac C = 0.45 1 = 3.19 in/hr Q = 2.20 cfs Ditch #9 Road B Sta. 9+00 to Sta. 11+50 left Tc = 4.3 min, use 5 min Ditch Flow: 254 LF, 0.5%, Tch = 4.3 min DA = 0.19 ac C = 0.50 I = 7.91 in/hr Q = 0.75 cfs Ditch #10 Road B Sta. 11+50 to END right Tc = 40.6 min, use 45 min Overland Flow: 805 LF, 0.6%, n=0.4, T,,= 40.6 min DA = 3.79 ac C = 0.45 1 = 3.19 in/hr Q = 5.44 cfs Ditch #11 Road B Sta. 11+50 to END left Tc = 35.4 min + 8.1 min = 43.5 min, use 45 min Overland Flow: 597 LF, 0.6%, n=0.4, T,,= 35.4 min Ditch Flow: 588 LF, 0.5%, Tch = 8.1 min DA = 1.30 ac C = 0.40 1 = 3.19 in/hr Q = 1.66 cfs Ditch #12 Tc = 50.0 min + 7.6 min = 57.6 min, use 60 min Overland Flow: 1145 LF, 0.5%, n=0.4, T,,v = 50.0 min Ditch Flow: 536 LF, 0.5%, Tch = 7.6 min DA = 10.55 ac C = 0.40 1 = 2.52 in/hr Q = 10.63 cfs