Loading...
HomeMy WebLinkAboutWQ0031953_Sewer Extension Permit Status Update_20191105 Request for Engineering Certification Date of Letter: October 16,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR WQPS—PERCS UNIT By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov Permit No.: VI 6Z 0 '0 t 9 Permittee: ALL ioMno+7 'e Col/tSio'J Cx pedr Project Name: ©itIrT e"-S g0,Q,a C.mMai4GQG AL- ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. ❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): Signature: Date: Comments: *********************************************************************************************************** Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for andreceive a new Wastewaterel,t Collection System Permit. Name&Title(Print): A.' �� f�` OW1 hid A44U6ez Signature: � �— ` ' � — Date: 10 3/ 201 Comments: P/lo t)GL acsh2e ciSrz ad A 4w//dG ,By,�Ik I Al 2o1/ • 4.1.4",e/fde eotf# Id,.) 61,6`71T GyC N.¢-d blit/4,D`C deteeA,p Contact Information Updates Updated Contact Person: N/4 Updated Mailing Address: /VA • Updated Email: 11/A- Request for Engineering Certification Date of Letter: October 16,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR WQPS-PERCS UNIT By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov *********************************************************************************************************** Permit No.: A0 Q O 'o 6 4 s3 Permittee: AU 10 An,0+7 t/G COI/'shod Evenly £-G Project Name: ©A-re.S g0,44) Gmaslratfc(GQGlAz_ ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. ❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): Signature: Date: RECEIVE D Comments: NOV 0 5 2019 NCDEQ/DWR/NPDES *********************************************************************************************************** Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewaterel�t Collection System Permit. e= Name&Title(Print): ' � bi f�`er- /as-t41 6eJ Albsp 6c42. Signature: C4• C �— ./11- b ''— Date: 14° 3/ 20/ Comments: P/20/3&01y asc,/llle c/aleit cd ' [_DA.,, ,,,..�,,i 7I- OA G 191,4k iAt o` ,,7 # 3 'e Ce '/, i- cioe .74 LyC k04-1 ki,04).,0`e A deve.I/ ************************************************************************************************* ******** Contact Information Updates Updated Contact Person: N/4 Updated Mailing Address: /1l`fr" Updated Email: iv/A- ,