HomeMy WebLinkAboutNC0035173_Corrective Action Plan_20191029 Wieland October 29, 2019 Wieland Copper Products, LLC 3990 US 311 Hwy N Pine Hall, NC 27042 NCDENR Phone: (336)445-4500 2918 Water QualityPermittingSection-NPDES Fax: wiel 427 om info@wieland.com 1617 Mail Service Center www.wielandcopper.com Raleigh, NC 27699-1617 Attention:Joe Corporon Subject:Wieland Copper Products, LLC RECEIVED Corrective Action Plan for Copper Removal NOV 1�79 NPDES Permit No: NC0035173 NCDEQIDWR/NPDES Dear Mr. Corporon: Enclosed is one signed original and 1 copy of Wieland Copper Products, LLC Current Status and Corrective Action Plan for Copper Removal from the discharges of Outfall's 001 and 003. If you have any questions please feel free to call me at(336)445-4526. r Sincereljr1VL ,/' "( 'Tony Rin Environmental Supervisor Wieland Copper Products, LLC Corrective Action Plan Status Report Permit Number NC0035173 ENVIRONMENTAL P R66A C ESS SOLUTIONS, PLLC RECEIVED NOV 0 5 2019 I4CDEQIDWRINPDES Environmental Process Solutions, PLLC 7000 Stinson Hartis Rd Ste F Indian Trail, NC 28079 980-202-2377 I Firm P-0882 Corrective Action Plan Wieland Copper Products,LLC Copper Reduction Table of Contents Report Submission Authorization 3 Introduction 4 Purpose 4 Existing Treatment Facilities 4 Status of Alternatives evaluated Outfall 001 4 Status of Alternatives evaluated Outfall 003 5 Updated Schedule of Compliance 7 Selected Alternative Implementation Plan 8 2 Report Submission Authorization This Corrective Action Plan is submitted by Wieland Copper Products, LLC and Environmental Process Solutions, PLLC to meet the requirements for NPDES permit NC0035173, Part 1, Condition A(6), Item 1. This section includes the schedule of compliance for achievement of the Total Copper limits for discharge of the effluent through Outfalls 001 and 003 by November 1, 2021. The following people have developed the content and approve submission of this report: 'Pz9 i9 Glenn Maxwell, President MA, /4 29 /9- Jar-d 'anken, Director of Environmental, Health and Safety ,le Tony Spr'nkle, Environmental Supervisor 1,�.�H CA,RQ/", O•(S E`'S/0 l��ii� :o •- . SEAL ; 0 3 6 4 • • 4 iti ie Kellie Hedrick, PE,Consultant with Environmental Process Solutions, PLLC 3 Introduction Wieland Copper Products, LLC is located at 3990 US Hwy 311 N, Pine Hall, NC. Wieland Copper Products, LLC had been operating wastewater treatment facilities under NC discharge permit NC0035173 and received a renewal on September 27, 2017. This renewed permit added limits for Total Copper to the permit including a compliance schedule for achievement. As part of the compliance schedule, a Corrective Action Plan summarizing the actions to be taken in order to achieve compliance by November 1, 2021 was submitted last year (2018) and this report is the annual status update. Purpose In 2018, Wieland Copper Products submitted a Corrective Action Plan that summarized the plans intended to achieve compliance with the total copper limits at Outfalls 001 and 003. This report summarizes the activities to date along with the plans for the next year. Existing Treatment Facilities Wieland Copper has two outfalls located on unnamed tributaries that flow into the Dan River. Outfall 001 receives wastewater generated through the sanitary sewer. This wastewater is treated by a package activated sludge plant and typically processes about 5000 gal/day. Wastewater flows through a bar screen into the aeration basin, solids settle in the clarifier, and the clarified effluent is further treated by a tablet chlorinator followed by a tablet de-chlorinator prior to final discharge. The treated effluent is then discharged though Outfall 001. There is no manufacturing wastewater processed through this system. The sanitary treatment system has an approximate copper concentration of 240 ug/L compared to the new limit of 40.7 ug/L. This system has been prioritized highest for need to add an additional treatment unit in order to reliably meet the limits that will be fully implemented November 1, 2021. The process wastewater generated through boiler blowdown, cooling tower blowdown, and non- contact cooling water is processed through a physical/chemical treatment system consisting of fast mix tank for coagulation, a slow mix tank for flocculation, and a belt press for solids separation. The clean water is discharged through Outfall 003. This outfall discharges roughly 30,000 gal per day on average. The current concentration in the effluent is about 43 ug/L compared to the new limit of 25.5 ug/L. The current treatment system is much closer to meeting the new limit without additional treatment processes. Status of Alternatives evaluated Outfall 001 From the initial list of approximately 8 alternatives for potential evaluation, 4 alternatives were selected based on the probability of success. The four alternatives to be evaluated were chemical precipitation, Nexom technology filtration, Membrane filtration, and ion exchange. These technologies were intended to be evaluated primarily for additional treatment to the biological system discharging to Outfall 001. 4 Nexom Filtration was the first to be evaluated. This technology involves reactive filtration in a sand filter platform. Primary applications are advertised as removal of trace metals and phosphorus. The process involves a continuously regenerated hydrous ferric oxide coating on the sand media, which results in attraction of the low levels metals to the media. After detailed discussion with the vendors, it was determined that Outfall 001 was not a good candidate for this technology due to the inconsistency of flow and the fact that the typical flow was so low. In order for the filtration system to work effectively, a continuous flow is needed and with a discharge of 2500-5000 gal per day, consistent flow would be very difficult to obtain on the final effluent. Based on these discussions, further evaluation of this technology was abandoned. The initial plan was to evaluate membrane filtration between October 2019 and March 2020. Evaluation of membrane technology has been reprioritized since the initial indications are that membrane filtration of wastewater tends to be extremely difficult to reliably operate and keep in service. Further literature research will be done prior to pilot testing of membranes. During the Outfall 003 evaluation of chemical precipitation modification, a new product called ProMoss was introduced as a possibility. ProMoss acts as an adsorbent for positively charged metal ions. Since copper is positively charged, ProMoss was added to the effluent chamber to test for use in improving copper removal. ProMoss showed improvements in the copper levels,though it did not perform well enough to be the only treatment needed for Outfall 001. With the testing of ProMoss showing improvements in copper removal, priority was given to testing ion exchange. Evaluation of ion exchange will begin in November 2019 using a copper specific resin. Once ion exchange has been evaluated, membranes may be tested depending on the research into the exact membrane technology needed for copper removal. The pore size will determine what may reliably remove copper and if reverse osmosis is the pore size required, significant pre-treatment will be required to create clean enough water to send through the reverse osmosis membrane. Status of Alternatives evaluated Outfall 003 Chemical precipitation is the current primary treatment for Outfall 003 and will be modified and optimized to meet the new copper limit. If simple modification to the existing treatment does not provide copper concentrations in the discharge low enough to reliably meet the limit,then a polishing step utilizing one of the other evaluated technologies will likely be implemented to ensure consistently meeting the effluent limit of 25.5 ug/L. The first treatment technology evaluated was chemical precipitation. Since the wastewater discharged through Outfall 003 is already treated by a chemical precipitation process, it seemed logical to test this technology first. Working with the current chemical vendor and the equipment already present in the physical/chemical treatment system, evaluations were completed on modifying the coagulant and polymer used for precipitation in the physical/chemical treatment system to provide better removal of copper in order to meet the new copper discharge limits. The addition of a metal scavenger to the 5 physical/chemical treatment system at Outfall 003 brought the copper concentration very near the discharge limit, but did not reliably maintain the low concentrations. The chemical supplier introduced ProMoss, an adsorbent, to the system as a possible removal technology. ProMoss has been introduced throughout the water systems discharging through Outfall 003 as the primary chemical treatment for the cooling tower water and non-contact cooling systems. So far,this has reduced the copper levels in the effluent to levels very near the discharge limit. Final treatment using precipitation technology adjustments may create effluent that can reliably meet the discharge limit of 25.5 ug/L. 6 Updated Schedule of Compliance Date Task Status 11/5/2018 Begin studies on precipitation for Complete physical/chemical treatment optimization on Outfall 003 11/5/2018 Begin treatment testing for precipitation Complete use post biological treatment for Outfall 001 2/28/2019 Complete Precipitation studies Complete 3/4/2019 Begin studies on Nexom Filtration for Option discarded due to low both outfalls flows at 001 9/30/2019 Complete studies on Nexom Filtration Option discarded due to low flows 10/7/2019 Begin studies on membrane filtration on Option evaluation delayed due both outfalls if determined necessary to potential plugging issues 11/1/2019 Status Report Due on test status Issued 10/25/19 3/31/2020 Complete membrane filtration studies Option evaluation delayed 4/6/2020 Begin studies of ion exchange polishing Option under investigation and on either outfall as deemed necessary by testing as of 11/1/19 previous experimentation 6/30/2020 Complete polishing studies on both outfalls 11/1/2020 Status Report Due 12/1/2020 A to C paperwork due 3/15/2021 A to C approval 3/22/2021 Order long lead time equipment 10/1/2021 Complete Installation of necessary treatment additions 11/1/2021 Outfalls 001 and 003 running new systems in compliance with Total Copper limit 7 Selected Alternative Implementation Plan The Capital Expenditure request can be developed after financial considerations of successful treatment technologies. Once funding is approved,the Authorization to Construct will be developed and submitted, with an intended submission goal of November 2020 for hopeful approval by March 2021. Once the ATC has been approved, then construction will begin to have the best treatment system installed and fully operational by November 1, 2021. 8 1