HomeMy WebLinkAboutNCG200524_2019.05.29.PostConst.DA.Map.Signed_11/5/2019THE PURPOSE OF THIS PLAN IS TO SHOW THE POST
CONSTRUCTION DRAINAGE AREAS, IMPERVIOUS AREAS, AND
MATERIAL STAGING AREAS FOR NCG200000.
o o loo
�,•�P�k �CAqqz
SCALE 1"=100' ���¢OF{�S$!0�•�?i9"
SEAL
43250
M. 1p, .�
2019k 291 Parker -A 0tlengineering.mm 'III , , , , ,
2919.Ov291511 4] -0400'
Pre Construction DA0#1:
Item:
Area (sf):
Area (ac):
C:
Existing BUA
0
0.000
0.95
Woods
33,309
0.765
0.15
Open Area
1,629
0.037
0.20
Total:
34,938
0.802
0.15
Post Construction:
Parking Lot
9,904
0.227
0.95
Roof Area
1,991
0.046
0.95
Sidewalk
0
0.000
0.95
Woods
29,451
0.676
0.15
Lawn
2,459
0.056
0.20
Total:
43,805
1.006
0.37
Pre Construction DAO#2:
Item:
Area (sf):
Area (ac):
C:
Existing BUA
0
0.000
0.95
Woods
336,134
7.717
0.15
Open Area
21,133
0.485
0.2
Total:
357,267
8.202
0.15
Post Construction:
Parking Lot
24,870
0.571
0.95
Roof Area
2,192
0.050
0.95
Sidewalk
656
0.015
0.95
Future IA
19,288
0.443
0.49
Woods
279,703
6.421
0.15
Lawn
21,762
0.500
0.20
Total:
348,471
8.000
0.21
I
DRAINAGE
AREA #2
DRAINAGE
AREA #1
FEROUS MATERIAL
LOADING, UNLOADING, AND
PROCESSING AREA
DOA #1
THIS PLAN IS THE PROPERTY OF AMP'D ENGINEERING, PLLC, AND MAY
NOT BE USED OR REPRODUCED WITHOUT THEIR PERMISSION. DESIGNER
ASSUMES NO LIABILITY FOR ANY STRUCTURE CONSTRUCTED FROM THIS
PLAN. CONTRACTOR MUST VERIFY ALL DIMENSIONS PRIOR TO
PROCEEDING WITH CONSTRUCTION. CAUTION MUST BE EXERCISED IN
MAKING ANY CHANGES IN THIS PLAN.
. . . . ....... . ................. .................. . .
SEPTIC AREA
FEROUS MATERIAL .-.-.�.�.
STORAGE AREA
...........
..........
EQUIPMENT MAINTENANCE
AND FUELING AREA .
...............................
NON FEROUS MATERIAL TO BE LOADED,
UNLOADED, PROCESSED AND STORED
INSIDE 50'X80' BUILDING
ILL.LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.�.�.�...LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.LL.�.
...........................
-DOA #2
% �...
50' o,0'HWq y 26, -
AMP'D
-SITE CIVIL CONSULTANT
-STORMWATER DESIGN
aINSPEC71oN
-LAND DEVELOPMENT
-SITE PLANS
919-795-9594
�
rro C))
J Ln Ln
CD Ld
Z a_C)E O U Z
W z (n �
W WofWO)
Z J Ln
C.DZ2Un0)
LLJ I
LZL.I U_ � � U)
J 0 Q Q
� I
:�:�
QnWrn
W
W
Q
~ U
0 < Z
Q
W
z �oz
_F�
U �z0
co
N V) F—
QOf
LLJ
Q
O W
O m
DATE: 5/29/2019
REV: I DATE:
POST CONSTRUCTION
DRAINAGE AREA
EXHIBIT MAP
SHEET 1 OF 1