Loading...
HomeMy WebLinkAbout20091083 Ver 1_Application_20091014STATE OF NORTH CAROLINA a"f?,,Q ?1?09 DEPARTMENT OF TRANSPORTATION tw4tk/n BEVERLY EAVES PERDUE EUGENE A. C!RkTI, JR. GOVERNOR SECRETAR\' October 6, 2009 Mr. David Baker, NCDOT Regulatory Project Manager U.S. Army Corps of Engineers (? 151 Patton Avenue, Room 208 ®9 1 08Asheville, NC 28801-2714 Subject: Nationwide 14 Permit Application NC 69 Turn Lane Addition Clay County State Project No. 14C.022015 (DWQ Minor Permit Fee $240) Dear Mr. Baker: The North Carolina Department of Transportation (NCDOT) is proposing to reconstruct a section of NC 69 near Hayesville. This proposal entails widening the existing roadway to include a middle turn lane and paved shoulders. The proposed improvements of NC 69 have been identified as necessary safety improvements. Funds have been allocated for this project, and NCDOT would like to perform these activities in 2009/2010. I am enclosing a plan sheet, photographs, a marked county map and USGS topographic map. The improvements will require the extension of one culvert. The culvert will be installed slightly below the existing streambed elevation where bedrock is not encountered to minimize impacts to aquatic habitats and allow the existing stream gradients to remain as unchanged as physically possible. The North Carolina Natural Heritage Database was checked for records of federally threatened and endangered species. There are no records listed in the database for the unnamed tributary or for Clay County. The stream to be impacted is small and does not have sufficient flow to support mussels. Habitat for fish is limited. The impacts from culvert extension should be minimal. For these reasons, we believe there will be "no effect" on threatened or endangered species. Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation Office (SHPO) and the Office of State Archaeology determines that further investigations are required, NCDOT will conduct the appropriate site investigations and obtain compliance from SHPO prior to project construction. The best management practices will be used to minimize and control sedimentation and erosion at this site. The construction foreman will review all erosion control measures daily to ensure sedimentation and erosion is being effectively controlled. If the planned devices are not functioning as intended, they will be immediately replaced with better devices: The rock silt screens and other erosion control devices will be in place prior to pipe culvert construction and will remain in place until the project is stabilized. Impacts to Waters of the United States The unnamed tributary to Blair Creek is small; however, it has a well-defined channel and is shown on the topographic map as a perennial stream. The channel substrate of the stream to be effected is primarily composed of gravel, sand and silt. The unnamed tributary flows into Blair Creek approximately 1,682 feet downstream of NC 69. Blair Creek in turn flows into the Hiwassee River approximately 0.94 miles downstream from the confluence with the unnamed tributary. The Hiwassee River meets the definition of a Traditional Navigable Water. For these reasons, we believe that the unnamed tributary to Blair Creek is a Relatively Permanent Water and is under the jurisdiction of the U.S. Army Corps of Engineers. In order to make the needed safety improvements to NC 69, it will be necessary to impact waters of the United States in the Hiwassee River Basin. Specifically, NCDOT is requesting to extend one culvert. The proposed impacts are listed below. Site No. Existing Condition Proposed Condition Net Impacts Station Site 1 102' X 60" RCP (Sta. 24+56) 78' X 60" RCP And 7' Conc. JB 31' Site IA Free Flowing Channel Flow Diversion 134' (Sta. 24+56) otap ermnnent< treain&Impact ?: 31 Linear fee Temporary Impact for Impervious Dike and Flow Diversion: 134 linear feet Permits Requested NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to you concerning the 404 Nationwide Permit request. Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ). In addition, I am asking Mr. McHenry and Ed Ingle, Roadside Environmental Field Operations Engineer (NCDOT), to comment directly to me concerning this permit request. If you have any questions or need additional information, please contact me at (828) 321-4105. Your early review and consideration will be greatly appreciated. Sincerely, Wes ley rindstaDistrict Engineer tP cc: Mr. Brian Wrenn DWQ, DENR, Raleigh (four copies) Mr. Mike Parker, DWQ, DENR, Asheville Mr. Troy Wilson, Biologist, U.S. Fish and Wildlife Service, Asheville Mr. David McHenry, Mountain Region Coordinator, NCWRC, Waynesville Mr. J. B. Setzer, P.E., Division Engineer, NCDOT Mr. Mark Davis, Division Environmental Officer, NCDOT Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT o??o?Fyw n7?F' O liii? Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit E) Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NW 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No td. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ® Yes ? No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: NC 69 Turn Lane 2b. County: Clay 2c. Nearest municipality / town: Hayesville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 140.022015 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A - 3d. Street address: N/A 3e. City, state, zip: N/A 3f. Telephone no.: N/A 3g. Fax no.: N/A 31h. Email address: N/A Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: District Engineer 41b. Name: Wesley Grindstaff 4c. Business name (if applicable): North Crarolina Department of Transportation 4d. Street address: 191 Robbinsville Road 4e. City, state, zip: Andrews, NC 28901 4f. Telephone no.: 828-321-4105 4g. Fax no.: 828-321-3228 4h. Email address: wtgrindstaff@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): N/A 5c. Street address: N/A 5d. City, state, zip: N/A 5e. Telephone no.: N/A 5f. Fax no.: N/A 5g. Email address: N/A B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1b. Site coordinates (in decimal degrees): Approximateproject center; site coordiriatesattached Latitude: 35 03190 Longitude: 83 .82250 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Blair Creek 21b. Water Quality Classification of nearest receiving water: Blair Creek ( DWQ Class.: WS-IV) 2c. River basin: Hiwassee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Landscape is commercial businesses with open fields. 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: To reconstruct roadway to include a turn lane and paved shoulders. 3e. Describe the overall project in detail, including the type of equipment to be used: Widen, grade, drain and pave the roadway. Track hoes, dump trucks, bulldozers, water pumps, diversion pipe, various hand tools will be used to accomplish the work. Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes N No ? Unknown project (including all prior phases) in the past? . Comments: N/A 41b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): N/A Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes N No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes N No 61b. If yes, explain. N/A Page 3 of 10 PCN Form -Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction ' 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T N/A N/A ? Yes ? Corps N/A ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ?P?T ?Yes ?Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts WA 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P El T Culvert UT to Blair Creek ® PER ? INT ® Corps ® DWQ 2 31 S1A ? P ® T Diversion Flow UT to Blair Creek ® PER ? INT ® Corps ® DWQ 2 134 S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ S7 ? P ? T ? PER ? Corps ? INT ? DWQ Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 3h. Total stream and tributary impacts 31 3i. Co mmmm entsTgtahTempora'illmpadffohsaiidtiagfcoffePdamrand.,flow<divbrsionts'934alineaife`et. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. ' Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ? P ? T N/A N/A N/A N/A 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts N/A 4g. Comments: N/A 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A N/A N/A N/A N/A N/A N/A N/A P2 5f. Total N/A N/A N/A N/A N/A N/A N/A 5g. Comments: N/A 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ? P ? T N/A N/A El Nos N/A N/A B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts N/A N/A 6i. Comments: N/A D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. C_uIvertsaSrelbeing,extended theYminimu_m nedessarv to w den thesroa_d to 3? 6' eta 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. H g Quality,Erosi6h:arid'Sedimentati6fiiCohtrofineasures.will•be implemehted Watetwill.be.diverted around?culvet.sites during installation. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ? No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this ®Payment to in-lieu fee program project? ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type N/A Quantity N/A . 3c. Comments: N/A Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ®cold 4d. Buffer mitigation requested (DWQ only): N/A square feet 4e. Riparian wetland mitigation requested: N/A acres 4f. Non-riparian wetland mitigation requested: N/A acres 4g. Coastal (tidal) wetland mitigation requested: N/A acres 41h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 N/A N/A 3 (2 for Catawba) N/A Zone 2 1.5 6f. Total buffer mitigation required: N/A 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page 7 of 10 PCN Form -Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ®No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: N/A 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project is covered by individual NPDES Permit NCS000250 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: N/A ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW El USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HOW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 41b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 51b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ®No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 31b. If you answered 'yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This is a heavily commercialized section of a NC route. The road is being upgraded to improve safety and mobility. Development patterns are not anticipated to change significantly. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or ? Yes No habitat? 5b . Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? E] Raleigh Sc . If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage Database 6. Essential Fish Habitat (Corps Requirement) 6a . Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b . What,data ources did you use to determine whether your site would impact Essential Fish Habitat? N/A-There are no marine or estuarine communities within the Blue Ridge Province. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b . What data sources did you use to determine whether your site would impact historic or archeological resources? A copy of this pemit will be submitted by DWQ to the State Historical Office for review for cultural resources. 8. Flood Zone Designation (Corps Requirement) 8a . Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ®No 8b . If yes, explain how project meets FEMA requirements: 8c . What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program Wesley Grindstaff r-- a 10/06/2009 t Applicant/Agent's Printed Name pp Icant/A Signature Date (Agent's signature valid only if a ization letter from the applicant r)at is ) Page 10 of 10 PCN Form -Version 1.3 December 10, 2008 Version NC 69 TURNLANE PROJECT - VICINITY MAP CLAY COUNTY 1305 .'1305 ° 1315 NATIONAL - ? a] 357 1355 1314 .? e It FOREST ? r 1305 ° ' ` ids 1307 F//wg ?... 1356 / \ SS?F / C 1308 1365 1309 - \\ Memo, /T 1309 F - - irst Bapr 1369 u Presby Ch > 368 nnFSnuB First ?P.470 t S^307 United p '' Mein Cn / CnatuOe rt t°' ° ' --1140 ° -? tt1fi assembly at od?? ` Y cam. S? ' Fires CreeV.? 1364 - ` Baot Cn ?y Y d '1366 .? kit Pisddh y Boot Cn n" . ` 1 ? ' - 1362 ta° 0 HayesvlRe Jem - 6 PreE]em Sch 1312 ?t 1310 J 1204 HayesMe 1377 y i i i d 1 e d ° '>>o 02 1313 & HiCh Sch 6 1309 n 1140 m Ch Of Christ peek / 1373 - or \ HlHCresi xayes?mg - 1343 y essem of Goa Ha'yesviie First l 1122 t NertBree For 1312 + unwed Mein Ch I Boo] Cn 1121 8 b I ^' + sk >A 1100 a '10 u 1140 1314 Mo Good Snepher GAej ? 114 1J ook Forest ur y gA ? - a. M¢ih Ch 1100 1120 1139 Permit Site 1 NC 69 Turn Lane - Project Clay County \? ? ' , - ? %f a " ;I " ?/ '' • r?'?4 i _,• . ?Tc .: ?_" "- \ -_.. r. 1 . . , \/SOW ? +lle?fl a ? erv0?, \\: 1. Tma(h '"' ' •?'% I 1<, " ' i@ • i 'S= F /(r; ?j m `v '\.M1i F R . Y . au?w rN \` i - Memor??h 1 ? ? . SV.I liLI:/ J? HA I'. r qo ."C F ? ? n ? • ?_ 1 '?? ,y,` _ _ c. ,\ .'1890) ,4 ` 11 \'l. ? ? -4 /? ??? ?4 5'0 , ^183 ?` a H.g 'r' > / / +c y f ?,? ? ? ? 9 \ Z \ ? difPOS g ant \ tT- / •i . ?. _ y?? , ?? (g )?/' \ v ? ?. _. ?? I ) ( i ? a? 11 , •.11J" rnr'? ? "n T ? ., 11It Y ? 1 B00 o. Sta. Atry Tu liel .I ) C.Y .% :A W? 1 x1899 HIII'L? I i "•?' -0 Ha e a?,s ?ri ? Ile '!:j A 09 ` \ A P 7 . G 3(?.to? . Oa Forest M 2 EG? I ? •- ? Hayesnlla-Crrr q g(,?J? 1?9/48-j //??, t• ? ?. ,( ? a , 1\ ? \? _ _•? 1 4A A/ 1J(•?J Y? \ _A? ? }862.( Site 1 - `''`•"4 :, t Sta.: J ?n M 133 r °C`1V ? ?+ ?? ? 2? - 1 •,.?10,? $6091d1i00•? +? ' ° Blair Y ? zJ\ `A ??. + _ %'? t ??? 8 ? ?? / \U "ate hU) r n {' rIBM ?•(-\Ii 7' J _ ,7 O a/ . ( ?? I / i \ ? ? 1 ?Yl r U ~ MaYe>?e C.m ' pOP • ? ` ? II \,' ?? ? ? l?` ? ? ??/ ? __ l ijv i g`° )! ? --?"^ I ?r` ? / J ') \?'?/.?/ ?/r x .? ? '§I%?SY Ivi9Ji `r/ ?o ..'_ ; m l s ?.. ?'? f . ?_..'?:\\?( ? r , Y, ..' n. I i D } n l X?. Y ?,yJP4 ai , jt? ?' i.,lr ara »'i CD z n C/) ?' o c CD