HomeMy WebLinkAbout20191481 Ver 1_More Info Received_20191104CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: Z61-l22 Q5. htC 2863( County: fgecM-e-n bU(_q
5
Owner: )
d
Print ignatur
Contractor/agent: Mc 36D e
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in
the application is a violation of the Buffer Rule. Site specific work should be provided in the
application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond
elevation), unless approved. Exception, those trees that are severely undermined along the
immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline
is allowed. [15A NCAC 02B .0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC
02B .0243 (6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless
specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .
0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be
removed. The work corridor should be described. The approved access corridor shall be restored.
Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A
NCAC 02B .0243 (4), (6), (8))
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed
stormwater discharges must be at the natural elevation and discharged prior to entering the buffer
directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement �ofNo i 'cation
2 hereby state that I have been informed of the
Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the
application and approved by the Division of Water Resources (DWR), is a violation and subject to
enforcement. Due diligence will be taken such that the construction will be built within substantial
compliance and intentA the J01 Water Quality ertification and Buffer Rules, the approved
plan(s) and specificatkn(Is), a d other/suD& nv. materials_
Signature (owner):