Loading...
HomeMy WebLinkAboutSW6191003_Calcs (Spread)_20191105NAME 7H.b,..'on Road Concrete Plant DATE )-19-19 PROJECT NO 1440 DESIGN PHASE PRELIMCT CONSTR REVISIONION / X North Carolina BY CEK RECORDCounty, OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO RI-1 JB-2 RI-1 J13-2 FES-3 JB-2 1440-Storm Drainage for Spread.xls 10-YEAR Date: 11/5/2019 Time: 8:10 AM Pagel of 4 " ` `llll NAME 7Hobson Road Concrete Plant DATE -19-19 PROJECT NO 1440 DESIGN PHASE PRELIMCT CONSTR REVISIONION / X , North Carolina BY CEK RECORDCoun OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO RI-1 JB-2 4.70 0.00 0.0051 18 7.5 4.3 43 0.17 235.50 235.28 239.30 JB-2 FES-3 4.70 0.00 0.0050 18 7.4 4.2 198 0.79 235.28 234.30 239.23 1440-Storm Drainage for Spread.xls 10-YEAR Date: 11/5/2019 Time: 8:10 AM Page 2 of 4 • " ` ` PROJECT NAME Hobson Road Concrete Plant ` DATE 9-19-19 PROJECT NO 1440 DESIGN PHASE PRELIM CONSTR / X / REVISION LOCATION Hoke County, North Carolina BY CEK RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION (FT) (FT) (CFS) Hf 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K CONTINUED FRICTION FRICTION SLOPE VELOCITY (FT/FT) (FPS) FROM TO RI-1 JB-2 1.7671 0.3750 0.00 0.09 0.03 0.04 0.06 0.21 0.55 0.0020 2.65 JB-2 FES-3 1.7671 0.3750 0.00 0.39 0.03 0.04 0.01 0.47 0.10 0.0020 2.65 1440-Storm Drainage for Spread.xls 10-YEAR Date: 11/5/2019 Time: 8:10 AM Page 3 of 4 " a"DATE 9-19-19 DESIGN PHASE PRELIMCT CONSTR / X REVISIONION NAME 7H.b.,on Road Concrete Plant PROJECT NO 1440 North Carolina BY CEK RECORDCounty, OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) RI-1 JB-2 236.48 236.69 236.56 236.69 OUTLET 2.61 OK JB-2 FES-3 235.50 235.97 236.34 236.34 INLET 2.89 OK GROUND ELEVATION 234.30 1440-Storm Drainage for Spread.xls 10-YEAR Date: 11/5/2019 Time: 8:10 AM Page 4 of 4