Loading...
HomeMy WebLinkAboutNC0003417_EMC SOC WQS18-006_20191024 "` \ DUKE James Wells ENERGY Vice President Environmental,Health and Safety Programs&Environmental Sciences 526 South Church Street Charlotte,NC 28202 (980)373-9646 October 24, 2019 Via Overnight Mail Linda Culpepper RECEIVED Director of Water Resources NOV 0 4 2019 North Carolina Department of Environmental Quality 1617 Mail Service Center NCDEQIDWRINPDES Raleigh, NC 27699-1617 Bob Sledge Division of Water Resources North Carolina Department of Environmental Quality 1617 Mail Service Center Raleigh, NC 27699-1617 • • Subject: Report Under Special Order by Consent—EMC SOC WQ S 18-006 Duke Energy Progress, LLC—H.F. Lee Energy Complex NPDES Permit NC0003417 Quarterly Progress Report for 3rd Quarter 2019 Dear Ms. Culpepper and Mr. Sledge: On behalf of Duke Energy Progress, LLC (DEP), I am submitting to you the H.F. Lee Energy Complex Progress Report summarizing the work and activities undertaken with respect to closure of coal ash surface impoundments as required Special Order by Consent (SOC), SOC No. S18- 006 Section 2.b.3). As required by the SOC, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Ms. Culpepper and Mr. Sledge October 24, 2019 Page 2 Please direct any questions concerning the H.F. Lee Energy Complex SOC No. S 18-006 to Lori Tollie at (336) 854-4916. Sincerely, Jame Wells Vice President, Environment, Health & Safety Programs and Environmental Sciences Duke Energy CC: Richard Baker, Duke Energy Lori Tollie, Duke Energy Robert Howard, Duke Energy George Hamrick, Duke Energy Paul Draovitch, Duke Energy Matt Hanchey, Duke Energy Randy Hart, Duke Energy • NPDES PERMIT NC0003417 SPECIAL ORDER BY CONSENT -EMC SOC WQ S18 00b QUARTERLY EXCAVATION PROGRESS REPORT HF LEE PLANT OCTOBER 24, 2019 Background and Summary On January 10, 2019,Duke Energy Progress, LLC(DEP)and the North Carolina Environmental Management Commission entered into a Special Order by Consent— EMC SOC WQ S18-006 (SOC) applicable to the HF Lee Plant (HF Lee). This report is submitted in accordance with Section 2.b.3) of the SOC. In compliance with Section 2.b.3), this report summarizes the work and activities undertaken with respect to decanting work and closure of coal ash surface impoundments at Asheville. The quarterly reports are due no later than the last day of January, April,July, and October for the duration of the SOC. The HF Lee Plant is located in Goldsboro, NC (Wayne County) along the Neuse River. The Plant began commercial operation in 1951. The plant's three coal-fired units were retired in September 2012 and replaced by four oil-fueled combustion turbine units in October 2012. In December 2012, the HF Lee Combined Cycle Plant was brought on-line, which applies two sources of energy, combustion and steam turbines, to convert natural gas to electricity. The Coal Combustion Residuals (CCR) basins associated with the historical coal-fired energy generation are also located on the site. The HF Lee Plant has four, regulated CCR basins on site and a Lay of the Land Area (LOLA). The ash basins cover approximately 307 acres, with a current ash inventory of approximately 6.3 million tons of ash, as of July 2019. The basins are referred to as: • Basin 1 or 1950 Inactive CCR Basin (State ID WAYNE-031) • Basin 2 or 1955 Inactive CCR Basin (State ID WAYNE-032) • Basin 3 or 1962 Inactive CCR Basin (State ID WAYNE-033) • Active Basin or 1982 CCR Basin (State ID WAYNE-022) • Lay of Land Area (LOLA) The HF Lee site was announced as an ash beneficiation site on December 13, 2016. Ash excavation, beneficiation, and closure of the HF Lee Ash Basins has not yet begun. Construction, startup, and performance testing is scheduled to be completed in Q4 2020. Decanting Status Prior to the Special Order by Consent, Duke Energy commenced decanting of the HF Lee Active Ash Basin on November 27, 2017. Decanting was completed on November 2, 2018. Duke Energy has performed periodic maintenance decanting since that time to maintain the ash basin in a decanted state. Dewatering of the Active Ash Basin began on July 16, 2019 and will continue throughout beneficial reuse and closure. HF Lee: 1