Loading...
HomeMy WebLinkAboutNC0023973_Authorization to Construct_19930823State of North Carolina Department of Environment, Health and Natural Resources A74 • eDivision of Environmental Managementi� 1James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ®FE F1 A. Preston Howard, Jr., P.E., Director August 23. 1993 Mr. Charles E. Davis. Jr. Acting Director of Public Utilities City of Wilmington P. O. Box 1810 Wilmington, North Carolina 28042 SUBJECT: City, of Wilmington Permit No. NC0023973 Authorization to Construct Solids Processing Facilities M'Kean Maffitt WAI Project No. CS370595-06 Dear Mr. Davis: New Hanover County The final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction and operation of additions and modifications to the sludge handling facilities to consist of a new digester gas mixing system; a new liquid sludge truck loading station with one (1) 600 gpm pump; a new sludge flow metering system, a new 3,170 It.' sludge dewatering building with two (2) 2.0 meter belt. filter presses; a new sludge grinder; three (3) 200 gpm sludge feed pumps; a dewatered sludge conveyor system; a sludge truck unloading station; a new 32,000 gallon WAS sludge storage tank with a 5 Hp mixer and two (2) 50 gpm WAS sludge transfer pumps; a process drain pump station with dual 800 gpm pumps; a new plant water system with dual 200 gpm pumps; and associated appurtenances, site and electrical work. Do not proceed with construction until the Authorization -to -Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval, if funding is desired for project construction. The Permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charee-of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper Page z The Authorization -to -Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NC0023973, issued August 1, 1991 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0023973. The Pemuttee shall have an acceptable sludge analysis and a sludge toxicity analysis which have been approved by the Division of Environmental Management, Water Quality Section prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Wilmington Regional Office. The disposing, selling or free distribution of wet, dried, composted sludge or sludge -like materials from wastewater facilities without prior review and approval by this Division is illegal. During the construction of the proposed additionshnodificatioils, the pennittec shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. One (1) set of fmal approved plans and specifications is to be forwarded to you for your files. The copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P. 0. Box 29535, Raleigh, North Carolina 27626-0535. (Engineer's Certification Form is attached.) Page 3 If you have any questions or need additional information; please contact Mr. Bill Hoffman, at (919) 733-6900, extension 615. Attachment BG:vk cc: Camp, Dresser & McKee Wilmington Regional Office Mr. Tom Falinestock Mr. Don Evans Ms. Valerie Lancaster pQl . Mr. Bennie Goetze, Jr. �yo Ms. Cindy Finan 10.2 DMU SRF