Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0089265_Compliance Evaluation Inspection_20191101
ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Laura Neely, Town Manager Town of Dobson PO Box 351 Dobson, NC 27017 NORTH CAROLINA Environmental Quality November 1, 2019 Subject: Compliance Evaluation Inspection Dobson Water Treatment Plant (WTP) NPDES Permit # NCO089265 Surry County Dear Ms. Neely: A Compliance Evaluation Inspection was performed by North Carolina Division of Water Resources (NC DWR) staff person, Justin Henderson and Lon Snider on October 28, 2019. Mr. Michael Frazier, Public Works Director, Laura Neely, Town Manager, Aaron Holder, ORC, and Ed Turner with The Lane Group, Inc. were present during this inspection. This type of inspection consists of two basic parts: an in -office review of the facility files and self -monitoring data and an on -site inspection of the facility. While, this inspection mostly reflects compliance with the subject permit, the following item of concern warrants your attention and action: 1) Failure to obtain field parameter laboratory certification to conduct required effluent monitoring of pH and TRC, as required by Permit Condition Part II. Section D. (4.). Immediately apply for field certification for appropriate field parameters or contract a Division certified laboratory to conduct all required monitoring. D North Carolina Department of Environmental Quality I Division of Water Resources EQ�p Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NORTH CAROLINA � o•o•°"•mme""°"^•"vin"•i� /� 336.776.9800 If you have any questions concerning this report, please contact Justin Henderson or me at (336) 776-9800. Sincerely, D''ocu Siiggned by, EL B49 225C A. Lon1 m er, egional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ enc: Inspection Report cc: Michael Frazier, Public Works Director- frazierm(c�r�,dobson-nc.com Laserfiche Files (electronic copies) United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 I 3 I NC0089265 111 12 I 19/10/28 I17 18 I S J 19 L G] 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 671 70 I I 71 I I 72 I r I 73 I I 174 751 I I I I I I I80 u ty I I i Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:OOAM 19/10/28 16/06/01 Dobson WTP 2607 Prison Camp Rd Exit Time/Date Permit Expiration Date Dobson NC 27017 12:30PM 19/10/28 18/12/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Laura H Neely,PO Box 351 Dobson NC 27017/Town Manager/336-356-8962/3363564836 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Justin L Henderson DouSigned by: DWR/WSRO WQ/336-776-9701/ 11/1/2019 t,tshv, ('�t,IWt,A,Vibiit, D51F3525961`8113496... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: u,�, —r 'Sider11/1/2019 FL EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) NCO089265 111 121 19/10/28 117 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Dear Ms. Neely: A Compliance Evaluation Inspection was performed by North Carolina Division of Water Resources (NC DWR) staff person, Justin Henderson and Lon Snider on October 28, 2019. Mr. Michael Frazier, Public Works Director, Laura Neely, Town Manager, Aaron Holder, ORC, and Ed Oliver with The Lane Group, Inc. were present during this inspection. This type of inspection consists of two basic parts: an in -office review of the facility files and self -monitoring data and an on -site inspection of the facility. While, this inspection mostly reflects compliance with the subject permit, the following item of concern warrants your attention and action: 1) Failure to obtain field parameter laboratory certification to conduct required effluent monitoring of pH and TRC, as required by Permit Condition Part 11. Section D. (4.). Immediately apply for field certification for appropriate field parameters or contract a Division certified laboratory to conduct all required monitoring. Page# Permit: NCO089265 Owner - Facility: Dobson WTP Inspection Date: 10/28/2019 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ 0 ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: Standby Power Yes No NA NE Is automatically activated standby power available? ❑ ❑ ❑ Is the generator tested by interrupting primary power source? 0 ❑ ❑ ❑ Is the generator tested under load? ❑ ❑ ❑ Was generator tested & operational during the inspection? ❑ ❑ 0 ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? 0 ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ❑ ❑ ❑ Is the generator fuel level monitored? 0 ❑ ❑ ❑ Comment: Disinfection -Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑ Is bulk storage tank containment area adequate? (free of leaks/open drains) ❑ ❑ ❑ Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? 0 ❑ ❑ ❑ Comment: Page# 3 Permit: NCO089265 Owner - Facility: Dobson WTP Inspection Date: 10/28/2019 Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ ❑ 0 ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? ❑ ❑ 0 ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ 0 ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: All monitoring must be conducted by a Division Certified Laboratory. Page# 4 \ OPeli "N' rccc,V&, 1/7/lZsll Ott (NU COMPLIANCE EVALUATION INSPECTION `ate b I 33�-3 ' Facility: o0b.5rnn lJ NPDES: rl C©(F'LZ-Z' Permit Effective Dates: to �, � 3 1 � t' Inspection Date: I (�g�t Inspection Time: 10 U U /pm PERMIT Complete copy of current NPDES permit f SELF -MONITORING PROGRAM il1u 2a18 �u�z -7-cii h _ DMRs (Dates: — Lab Data (per DMR dates) _ Laboratories used for analysis — to I-v c Lo ABO TORY -TU Chain of Custody forms (per DMR dates) Influent and/or Eilsamplers _ Field Parameter certification # MU"r1 te�ft✓,�ry Cell ' FLOW �� MEx1SURMENT Flow meter calibration records l •,wz+ 37nr L I �c J r% Flowcharts Iuy' o��SV -:12 �L�j SI I SLUDGE HANDLING DISPOSAL Sludge / Residuals hauling records OPERATION & MAINTENANCE I ( ORC current certification YV&- I�¢�ni'2S d - Back Up certification i_)e i�rod v TU)1?55j )LKD ,IT,C i-7361 'lu/la, se90 1 .. '�agrw (✓`care, d�k n.��r�` `� G>d (r »- 91 (kii)--I/it) _ Process control data (includes field parameters tested and equipment calibrations) _ Generator Inspection / under load checks RECORDS & REPORTS Wastewater Annual Report (fiscal or calendar year — if applicable) _ Daily Operator's to ORC visitation log _ Maintenance log FACILITY SITE REVIEW Plant visual inspection of treatment units �ivrrarN} ©y+kj) bra)jo, O T ksfttw rK"s - be' amaltheci � e[_'-V'luerd- EFFLUENT/RECEIVING WATERS _ Stream accessible for inspection (at effluent discharge pipe) 4-7 Ce IUCG4e— Otinn d1 601 ii'/{aY) 6 [ ,,0i�, rt� b Ca,Yy,lrcr.c� fr, ccG, hSI� pie h°.de� Ppr,l i) 7o)7 Cei��, mush ePtAkZ5 %y 2,G 2v � a