HomeMy WebLinkAboutNC0085120_Authorization to Construct_20191101Municipal Engines
Company, P.A.
November 1, 2019
r
ing Services
Qais Banihani
Environmental Engineer
NPDES Complex Permitting
NCDEQ— Division of Water Resources —Water Quality Permitting
512 North Salisbury Street
Raleigh, NC 27604
Re: Lowe's Distribution Center WWTP EQ-Basin Improvements
Statesville, North Carolina
MESCO Project No. G19064.0
Dear Mr. Banihani:
On behalf of Lowe's Corporation I am submitting an application package and requesting Authorization to
Construct a second Equalization Basin for an existing Wastewater Treatment Plant, Facility NPDES
number, NC0085120. Project will include construction of one new Equalization Basin which will have a
volume of approximately 6,000 gallons. This new structure will include a pair of solids handling pumps
with float controls and all related influent and effluent piping as shown on attached plan sheets.
This project will be a facility modification and will not affect treatment train at this facility. It is expected
for construction activities to take six to seven weeks. Included within this submittal package are two
copies of design plans, two copies of project specifications, two copies of the project calculations and
supporting documentation, and two copies of the NCDEQ Form ATC -12-14 .
Please call or email me if you have any questions or need additional information.
Best Regards,
Ml3NICIPAL ENGINEERING SERVICES CO., PA
Ben Clawson, PE
Project Manager
Enclosures
68 Shipwash
Drive •Garner, NC 27529 • ph: 919-772-5393 � fx: 919-772-1176 ®www.mesco.com
P.O. Box 349 •Boone, NC 28607 • ph: 828-262-1767 • fx: 828-265-2601 • www.mesco.com