HomeMy WebLinkAbout20191468 Ver 1_sr1504Wetland Impact Summary Sheet_20191101WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Bank Stabilization (ft) Site 1 N/A Temporary Dewatering 12 Site 1 N/A Inlet Re-alignment/Riprap 26 8 TOTALS*: 26 12 8 *Rounded totals are sum of actual impacts NOTES: