HomeMy WebLinkAboutDEQ_Coal Ash Impoundments Annual_2019-10-01ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
MEMORANDUM
TO: House and Senate Members with Coal Ash Ponds in their Districts
FROM: Joy Hicks, Senior Director of Governmental Affairs and Policy
SUBJECT: Coal Combustion Residuals Surface Impoundments in Member's Districts
DATE: October 1, 2019
Pursuant to GS 130A-309.204(b), "on or before October 1 of each year, the Department shall report
to each member of the General Assembly who has a coal combustion residuals surface
impoundment in the member's district. This report shall include the location of each impoundment
in the member's district, the amount of coal combustion residuals known or believed to be located
in the impoundment, the last action taken at the impoundment, and the date of that last action."
Comments concerning the 2019 annual report are as follows:
• All volumes were provided by Duke Energy as of July 31, 2019.
• Coal Ash Ponds are sorted by NC House District and NC Senate District.
• The table "Summary of Last Action Taken" covers many programs and lists multiple
actions in summary fashion.
The attached report satisfies this reporting requirement.
If you have any questions or need additional information, please contact me by phone at (919) 707-
8618 or via email at joy.hicksgncdenr.gov.
Sincerely,
Joy Hicks
cc: Sheila Holman, Assistant Secretary for Environment
Linda Culpepper, Director of Water Resources
NORTHCAROLINAD_E Q��
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
North Carolina Department of
Environmental Quality
Division of Water Resources
Annual Coal Ash Report to the General Assembly
October 1, 2019
This report is submitted to meet the requirements of GS 130A-309.204(b), which requires annual
reporting on coal combustion residuals surface impoundments in North Carolina.
NORTHCAROLINAD_E Q��
Department al Envlranmental Quay
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
Location of Each Ash Pond
Duke Energy Facility Name
Address
Allen Steam Station
253 Plant Allen Rd., Belmont, NC 28012
Asheville Steam Electric Plant
200 CP&L Dr., Arden, NC 28704
Belews Creek Steam Station
3195 Pine Hall Rd., Belews Creek, NC 27009
Buck Combined Cycle Station
1555 Dukeville Rd., Salisbury, NC 28146
Cape Fear Steam Electric Plant
500 CP&L Rd., Moncure, NC 27559
James E. Rogers Energy Complex (formerly Cliffside
Steam Station)
573 Duke Power Rd., Mooresboro, NC 28114
Dan River Combined Cycle Station
900 South Edgewood Rd., Eden, NC 27288
H. F. Lee Energy Complex
1677 Old Smithfield Rd., Goldsboro, NC 27530
Marshall Steam Station
8320 East NC Hwy. 150, Terrell, NC 28682
Mayo Steam Electric Plant
10660 Boston Rd., Roxboro, NC 27573
Riverbend Steam Station
175 Steamplant Station, Mount Holly, NC 28120
Roxboro Steam Electric Plant
1700 Dunnaway Rd., Semora, NC 27343
L. V. Sutton Energy Complex
801 Sutton Steam Plant Rd., Wilmington, NC 28401
W. H. Weatherspoon Power Plant
491 Power Plant Rd., Lumberton, NC 28358
Coal Ash Ponds by North Carolina House Districts
NC
House
District
Facility
Ash Pond Designation
Status
Coal Ash
Inventory (per
Duke as of July
31, 2019)
2
Mayo Steam Electric Plant
Mayo Ash Pond
Active
6,600,000
2
Roxboro Steam Electric Plant
Roxboro West Ash Pond
Active
12,974,000
2
Roxboro Steam Electric Plant
Roxboro East Ash Pond
(including ash stack)
Inactive
7,074,000
4
H.F. Lee Energy Complex
H.F. Lee Active Ash Pond
Inactive
4,516,000
4
H.F. Lee Energy Complex
H.F. Lee Ash Triangle Pond
Inactive
9,000
10
H.F. Lee Energy Complex
H.F. Lee Ash Pond 1
Inactive
269,000
10
H.F. Lee Energy Complex
H.F. Lee Ash Pond 2
Inactive
529,000
10
H.F. Lee Energy Complex
H.F. Lee Ash Pond 3
Inactive
911,000
18
L.V. Sutton Energy Complex
Sutton 1971 Ash Pond
Inactive
0
18
L.V. Sutton Energy Complex
Sutton 1984 Ash Pond
Inactive
0
46
W. H. Weatherspoon Power Plant
Weatherspoon 1979 Ash Pond
Inactive
1,676,000
54
Cape Fear Steam Electric Plant
Cape Fear 1956 Ash Pond
Inactive
419,000
54
Cape Fear Steam Electric Plant
Cape Fear 1963 Ash Pond
Inactive
859,000
54
Cape Fear Steam Electric Plant
Cape Fear 1970 Ash Pond
Inactive
839,000
54
Cape Fear Steam Electric Plant
Cape Fear 1978 Ash Pond
Inactive
833,000
54
Cape Fear Steam Electric Plant
Cape Fear 1985 Ash Pond
Inactive
2,815,000
65
Dan River Combined Cycle
Station
Dan River Active Primary Ash
Basin
Inactive
0
65
Dan River Combined Cycle
Station
Dan River Active Secondary
Ash Basin
Inactive
0
76
Buck Combined Cycle Station
Buck Steam Station Basin 1
Inactive
3,551,000
76
Buck Combined Cycle Station
Buck Steam Station Basin 2
Inactive
1,998,000
76
Buck Combined Cycle Station
Buck Steam Station Basin 3
Inactive
864,000
89
Marshall Steam Station
Marshall Active Ash Basin
Active
16,836,000
91
Belews Creek Steam Station
Belews Creek Active Ash Basin
Active
11,971,000
108
Riverbend Steam Station
Riverbend Primary &
Secondary Basins
Inactive
0
109
Allen Steam Station
Allen Active Ash Basin
Active
10,480,000
109
Allen Steam Station
Allen Retired Ash Basin
Inactive
6,152,000
NORTHCAROLINAD_E Q�I
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
III
James E. Rogers Energy Complex
Cliffside Active Ash Basin
Active
5,038,000
III
James E. Rogers Energy Complex
Cliffside Inactive Ash Basin 1-4
Inactive
0
112
James E. Rogers Energy Complex
Cliffside Inactive Ash Basin #5
Inactive
2,352,000
116
Asheville Steam Electric Plant
Asheville 1964 Ash Pond
Inactive
1,383,000
116
Asheville Steam Electric Plant
Asheville 1982 Ash Pond
Inactive
0
* = Active: receiving either sluiced fly ash or bottom ash, Inactive: NOT receiving sluiced fly ash or bottom ash
**= Quantities subject to change based on continuing ash production and ash excavation, as applicable. In addition,
detailed in -situ field data acquisition and analysis in support of ash basin closure planning may yield revised ash
quantities.
Coal Ash Ponds by North Carolina House Districts
NC
Senate
District
Facility
Ash Pond Designation
Status
Coal Ash
Inventory (per
Duke as of July
31, 2019)
7
H.F. Lee Energy Complex
H.F. Lee Ash Pond 1
Inactive
269,000
7
H.F. Lee Energy Complex
H.F. Lee Ash Pond 2
Inactive
529,000
7
H.F. Lee Energy Complex
H.F. Lee Ash Pond 3
Inactive
911,000
7
H.F. Lee Energy Complex
H.F. Lee Active Ash Pond
Inactive
4,516,000
7
H.F. Lee Energy Complex
H.F. Lee Ash Triangle Pond
Inactive
9,000
9
L.V. Sutton Energy Complex
Sutton 1971 Ash Pond
Inactive
0
9
L.V. Sutton Energy Complex
Sutton 1984 Ash Pond
Inactive
0
13
W. H. Weatherspoon Power Plant
Weatherspoon 1979 Ash Pond
Inactive
1,676,000
22
Mayo Steam Electric Plant
Mayo Ash Pond
Active
6,600,000
22
Roxboro Steam Electric Plant
Roxboro West Ash Pond
Active
12,974,000
22
Roxboro Steam Electric Plant
Roxboro East Ash Pond
Inactive
7,074,000
23
Cape Fear Steam Electric Plant
Cape Fear 1956 Ash Pond
Inactive
419,000
23
Cape Fear Steam Electric Plant
Cape Fear 1963 Ash Pond
Inactive
859,000
23
Cape Fear Steam Electric Plant
Cape Fear 1970 Ash Pond
Inactive
839,000
23
Cape Fear Steam Electric Plant
Cape Fear 1978 Ash Pond
Inactive
833,000
23
Cape Fear Steam Electric Plant
Cape Fear 1985 Ash Pond
Inactive
2,815,000
30
Dan River Combined Cycle
Station
Dan River Active Primary Ash
Basin
Inactive
0
30
Dan River Combined Cycle
Station
Dan River Active Secondary
Ash Basin
Inactive
0
30
Belews Creek Steam Station
Belews Creek Active Ash Basin
Active
11,971,000
34
Buck Combined Cycle Station
Buck Steam Station Basin 1
Inactive
3,551,000
34
Buck Combined Cycle Station
Buck Steam Station Basin 2
Inactive
1,998,000
34
Buck Combined Cycle Station
Buck Steam Station Basin 3
Inactive
864,000
42
Marshall Steam Station
Marshall Active Ash Basin
Active
16,836,000
43
Allen Steam Station
Allen Active Ash Basin
Active
10,480,000
43
Allen Steam Station
Allen Retired Ash Basin
Inactive
6,152,000
44
Riverbend Steam Station
Riverbend Primary &
Secondary Basins
Inactive
0
46
James E. Rogers Energy Complex
Cliffside Active Ash Basin
Active
5,038,000
46
James E. Rogers Energy Complex
Cliffside Inactive Ash Basin 1-4
Inactive
0
47
James E. Rogers Energy Complex
Cliffside Inactive Ash Basin #5
Inactive
2,352,000
48
Asheville Steam Electric Plant
Asheville 1964 Ash Pond
Inactive
1,383,000
48
Asheville Steam Electric Plant
Asheville 1982 Ash Pond
Inactive
0
* = Active: receiving either sluiced fly ash or bottom ash, Inactive: NOT receiving sluiced fly ash or bottom ash
**= Quantities subject to change based on continuing ash production and ash excavation, as applicable. In addition,
detailed in -situ field data acquisition and analysis in support of ash basin closure planning may yield revised ash
quantities.
NORTHCAROLINAD_E Q�I
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
Summary of Last Action Taken
Ash Pond Designation
Last Action Taken
Date of Last Action
Taken
Allen Active Ash Basin
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. July 13, 2018
2. NPDES permit issued
3. August 3, 2018
3. Alternate water provided
4. Complete
Division of Energy, Mineral, and Land Resources
4. Groundwater monitoring well installation
Allen Retired Ash Basin
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. August 3, 2018
2. Alternate water provided
3. Complete
Division of Energy, Mineral, and Land Resources
4. Complete
3. Outlet pipe repair
4. Piezometer installations
Asheville 1982 Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. November 2, 2018
2. NPDES permit issued
3. October 12, 2018
3. Alternate water provided
4. February 2, 2018
4. Basin excavated
5. Complete
Division of Energy, Mineral, and Land Resources
5. Dam decommissioning
Asheville 1964 Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. In progress
2. Basin under excavation
3. October 12, 2018
3. Alternate water provided
4. Complete
Division of Energy, Mineral, and Land Resources
5. In progress
4. Primary spillway abandonment
5. Review of dam decommissioning plans
Belews Creek Active
Division of Water Resources
1. In progress
Ash Basin
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. March 25, 2019
3. NPDES permit issued
4. On -going
4. Groundwater extraction well system operating
5. Complete
Division of Energy, Mineral, and Land Resources
6. Complete
5. Installation of a force main piping system
7. Complete
6. Installation of pipes to support dewatering
8. In progress
7. Groundwater monitoring well installations
8. Review of dewatering rate modification
Buck Steam Station
Division of Water Resources
1. In progress
Basin 1
1. Continued site assessment activities
2. In progress
2. Installation of alternate water supplies
3. September 18, 2018
3. NPDES permit issued
4. Complete
Division of Energy, Mineral, and Land Resources
4. Groundwater monitoring well installation
Buck Steam Station
Division of Water Resources
1. In progress
Basin 2
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. September 18, 2018
3. NPDES permit issued
4. Complete
Division of Energy, Mineral, and Land Resources
4. Dewatering rate modification
Buck Steam Station
Division of Water Resources
1. In progress
Basin 3
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. September 18, 2018
3. NPDES permit issued
4. Complete
NORTHCAROLINAD_E Q�I
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
Division of Energy, Mineral, and Land Resources
5. Complete
4. Modification of dam spillway and extension of outlet
6. Complete
5. Installation of an electrical line to support dewatering
6. Dewatering rate modification
Cape Fear 1956 Ash
Division of Water Resources
1. In progress
Pond (Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. In progress
Division of Energy, Mineral, and Land Resources
4. In progress
3. Vegetation removal
5. In progress
4. Construction of truck access ramp on crest
5. Review of slope repair to restore to design grade
Cape Fear 1963 Ash
Division of Water Resources
1. In progress
Pond (Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. In progress
Division of Energy, Mineral, and Land Resources
3. Vegetation removal
Cape Fear 1970 Ash
Division of Water Resources
1. In progress
Pond (Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. In progress
Division of Energy, Mineral, and Land Resources
3. Vegetation removal
Cape Fear 1978 Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. August 30, 2018
3. NPDES permit issued
4. Complete
Division of Energy, Mineral, and Land Resources
5. Complete
4. Vegetation removal
5. Dewatering rate modification
Cape Fear 1985 Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. August 30, 2018
3. NPDES permit issued
4. In progress
Division of Energy, Mineral, and Land Resources
5. Complete
4. Review of haul road construction for beneficiation project
6. In progress
5. Dewatering rate modification
6. Installation of an electrical line to support dewatering
Cliffside Active Ash
Division of Water Resources
1. In progress
Basin
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. In progress
3. Draft modification to NPDES permit
4. July 13, 2018
4. NPDES permit issued
5. Complete
Division of Energy, Mineral, and Land Resources
6. In progress
5. Groundwater monitoring well installation
6. Review of repair plans for area of wetness
Cliffside Inactive Ash
Division of Water Resources
1. In progress
Basin #5
1. Continued site assessment activities
2. In progress
2. Installation of alternate water supplies
3. Complete
Division of Energy, Mineral, and Land Resources
3. Outlet pipe and riser repair
Cliffside Inactive Ash
Division of Water Resources
1. In progress
Basin #1-4
1. Continued site assessment activities
2. In progress
2. Installation of alternate water supplies
3. August 10, 2018
3. Basins excavated
4. Complete
Division of Energy, Mineral, and Land Resources
4. Dam modification; proposed construction of a wastewater
storage basin within the dam
NORTHCAROLINAD_E Q�I
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
Dan River Active
Division of Water Resources
1. In progress
Primary Ash Basin
1. Continued site assessment activities
2. August 3, 2018
2. Alternate water provided
3. October 2016
3. NPDES permit issued
4. In progress
4. Basin under excavation
5. In progress
Division of Energy, Mineral, and Land Resources
5. Dam decommissioning (sequence A and C)
Dan River Active
Division of Water Resources
1. In progress
Secondary Ash Basin
1. Continued site assessment activities
2. August 3, 2018
2. Alternate water provided
3. October 2016
3. NPDES permit issued
4. In progress
Division of Energy, Mineral, and Land Resources
4. Dam decommissioning (sequence B and C)
H.F. Lee Ash Pond 1
Division of Water Resources
1. In progress
(Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
H.F. Lee Ash Pond 2
Division of Water Resources
1. In progress
(Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
H.F. Lee Ash Pond 3
Division of Water Resources
1. In progress
(Inactive)
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
H.F. Lee Active Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. July 1, 2019
3. NPDES permit issued
4. Complete
Division of Energy, Mineral, and Land Resources
5. In progress
4. Dewatering rate modification
6. In progress
5. Dam slope repair
6. Review of haul road construction for beneficiation project
H.F. Lee Ash Triangle
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. July 25, 2018
2. Alternate water provided
3. May 22, 2018
3. Basin excavated
4. Complete
Division of Energy, Mineral, and Land Resources
4. Dam decommissioning
Marshall Active Ash
Division of Water Resources
1. In progress
Basin
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. April 2, 2018
3. NPDES permit issued
4. In progress
Division of Energy, Mineral, and Land Resources
5. Complete
4. Installation of an electrical line to support dewatering
5. Groundwater monitoring well installations
Mayo Ash Pond
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. July 23, 2018
3. NPDES permit issued
4. In progress
Division of Energy, Mineral, and Land Resources
4. Dewatering rate modification
Riverbend Active Ash
Division of Water Resources
1. In progress
Basin 1
1. Continued site assessment activities
2. August 10, 2018
2. Alternate water provided
3. November 18, 2016
3. NPDES permit issued
4. April 22, 2019
4. Basin excavated
5. In progress
Division of Energy, Mineral, and Land Resources
5. Dam decommissioning
NORTHCAROLINAD_E Q�I
Department of Environmental Quality
North Carolina Department of Environmental Quality
217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601
919.707.8600
Riverbend Active Ash
Division of Water Resources
1. In progress
Basin 2
1. Continued site assessment activities
2. August 10, 2018
2. Alternate water provided
3. November 18, 2016
3. NPDES permit issued
4. April 22, 2019
4. Basin excavated
5. In progress
Division of Energy, Mineral, and Land Resources
5. Dam decommissioning
Roxboro West Ash
Division of Water Resources
1. In progress
Pond
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. In progress
3. Draft modification to NPDES permit
4. In progress
Division of Energy, Mineral, and Land Resources
5. In progress
4. Review of dewatering rate modification
5. Review of FGD pond dam decommissioning
Roxboro East Ash Pond
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. In progress
3. Draft modification to NPDES permit
4. Complete
Division of Energy, Mineral, and Land Resources
4. Dam slope modification
Sutton 1971 Ash Pond
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. August 10, 2018
2. Alternate water provided
3. September 30, 2017
3. NPDES permit issued
4. May 24, 2019
4. Basin excavated
5. On going
5. Groundwater extraction well system operating
6. Complete
Division of Energy, Mineral, and Land Resources
6. Dam decommissioning
Sutton 1984 Ash Pond
Division of Water Resources
1. In progress
1. Continued site assessment activities
2. August 10, 2018
2. Alternate water provided
3. September 30, 2017
3. NPDES permit issued
4. June 24, 2019
4. Basin under excavation
5. On going
Division of Energy, Mineral, and Land Resources
6. In progress
5. Groundwater extraction well system operating
6. Dam decommissioning
Weatherspoon 1979
Division of Water Resources
1. In progress
Ash Pond
1. Continued site assessment activities
2. October 12, 2018
2. Alternate water provided
3. August 3, 2018
3. NPDES permit issued
4. In progress
4. Basin under excavation
5. In progress
Division of Energy, Mineral, and Land Resources
6. Complete
5. Vegetation removal
6. Removal of sluice line beneath dam
NORTHCAROLINAD_E Q�I