STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 17BP.2.R.92 TIP No.: County(ies): Pitt Page 1 of 1
General Project Information
WBS Element:
17BP.2.R.92
ITIP Number:
Project Type: Bridge Replacement
Date: 1/18/2019
NCDOT Contact:
William (Galen) G. Cail, PE
Contractor/ Designer:
TGS Engineers (Ben Henegar, PE)
Address:
1590 Mail Service Center
Raleigh, NC 27699-1590
Address:
706 Hillsborough Street
Suite 200
Raleigh, NC 27603
Phone:
919-707-6711
Phone:
919-773-8887 ext. 123
Email:
gcailCa�ncdot.gov
Email:
bhenegar@tgsengineers.com
City/Town:
Greenville
County(ies):
Pitt
River Basin(s):
Tar -Pamlico
CAMA County?
No
Wetlands within Project Limits?
No
Project Description
Project Length (lin. miles or feet):
0.111 Mi.
Surrounding Land Use:
IForest, Cropland, and Rural Residential
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.4 ac.
0.3 ac.
Typical Cross Section Description:
Two 11' paved travel lanes with 2' paved shoulders and 2' grassed shoulders (5' with
guardrail).
Two 11' paved travel lanes with 3'-10' grassed shoulders.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 500 Year: 2035
Existing: 430 Year: 2018
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
Replacement of Bridge No. 730171 on SR 1418 (Staton House Rd.) over Johnsons Mill Run in Pitt County, NC. The proposed 85' long by 33' wide two -span bridge would
replace the existing 53' long by 28' wide three span bridge. The proposed grade will be about 0.5' above existing ground within the vicinity of the bridge and roughly matching
existing ground outside of the bridge.
Bridge No. 730171 is within the Tar -Pamlico River Drainage Basin and shall adhere to the Tar -Pamlico Buffer Rules. The proposed bridge will have no direct discharge into
Johnsons Mill Run. Stormwater runoff from the proposed bridge will flow to two traffic bearing grated inlets at the downgrade end of the bridge and outlet into a proposed grass
swale outside buffer zone 2 in the southwest quadrant of the crossing.
There are existing corrugated steel drive pipes that outlet directly in Johnsons Mill Run in all four quadrants. The proposed bridge construction will conflict with these pipes and
existing ditches. The ditches will be moved outside the bridge construction and the drive pipes will be removed and replaced with class 'I' rip -rap at embankment. It was
determined that the rip -rap at embankment would be a better option for long-term maintenance in lieu of replacing the pipes because of future drainage district maintenance.
Waterbody Information
Surface Water Body (1):
Johnsons Mill Run
NCDWR Stream Index No.:
28-91
NCDWR Surface Water Classification for Water Body
Primary Classification:
Water Supply IV (WS-IV)
Supplemental Classification:
Nutrient Sensitive Waters (NSW)
Other Stream Classification:
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
N/A
Buffer Rules in Effect:
Tar -Pamlico
Project Includes Bridge Spanning Water Body?
iYes
Deck Drains Discharge Over Buffer?
INo
Dissipator Pads Provided in Buffer?
INo
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Highway North Carolina Department of Transportation F a
Storrn),vatcr
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 17BP.2.R.92 TIP No.: County(ies): Pitt Page 2 of 2
Swales
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water Body
Base
Width
(ft)
Front
Slope
(H:1)
Back
Slope
(H:1)
Drainage
Area
(ac)
Recommended
Treatm't Length
(ft)
Actual
Length
(ft)
Longitudinal
Slope
N
Q2
(cfs)
V2
(fps)
Q10
(cfs)
V10
(fps)
Rock
Checks
Used
BMP
Associated w/
Buffer Rules?
-L- 13+12.50 LT
(1)Johnsons
Mill Run
2.0
3.0
3.0
0.09
9
9
1.08%
0.40
0.9
0.50
1.0
No
No
35.656608 /-77.403659
Additional Comments
W
C
s
E
L
a
T
S
i
v
O]
Co
71
C_
3
O
L
O
C
N
E
STATIC OF NORTH CAROL INA
nTI7TCT((-�)NT �(111P T TTrI�T 1A7' A 7,7C
STATE
STATE PROJECT R
BREET
NO.
TOTAL
SI@8T&
N.C.
17BP.2.R.92
TQ PROl.N0.
.A.PROl.
OL+9CRIP]TON
17BP.2.R.92
WA
PE
17BP.2.R.92
WA
RW, UTIL
17BP.2.R.92
WA
CONST.
NING
F5
1419
CHOOL RD.)
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III DOCMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared For:
HYDRAULICS ENGINEER
DIVISION OF HIGHWAYS
20 20 40
ADT 2020 = 440
1000 Birch Ridge Dr., Raleigh NC, 27610
10 0
ADT 2040 = 520
D H V = 12 %
TGS TGs ENGINEERS By:
706 HILLSEOROUGH ST PH (111) 131-1117
� CORP. LICENSE NO.:
suITE zoo
S °g�
@r
Q
PLANS
D
LENGTH ROADWAY TIP PROJECT 17BP.2.R.92 = 0.096 mile
cons
rr RALEIGH, NC z76o3
P.E.
20 10 0 20 40
= 55%
T = 15%
V = 60 MPH
LENGTH STRUCTURES TIP PROJECT 17BP.2.R.92 = 0.017 mile
SIGNATURE:
® Ty
r
g
�A
2018 STANDARD SPECIFICATIONS
V. MARCUS LOWERY, PE
TOTAL LENGTH TIP PROJECT 17BP.2.R.92 = 0.113 mile
RIGHT OF WAY DATE:
ROADWAY DESIGN
ENGINEER
PROFILE (HORIZONTAL)
* TTST =4 % DUAL =11 %
OCTOBER 9, 2019
*tee
1' �®
OP,
PROJECT ENGINEER
LETTING DATE:
MARCH 17, 2020
4 2 0 4 B
FUNC CLASS =
LOCAL RURAL
SUB -REGIONAL TIER
DAVID STUTTS, PE
P.E.
8����
NCDOT CONTACT
PROFILE (VERTICAL)
SIGNATURE.
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
®DENOTES IMPACTS IN
SURFACE WATER
DETAIL 1
RIP -RAP AT EMBANKMENT
(Nel to Scale)
on�n
Grade t'S
Type of Liner= CI- T Rip-Rop
DETAIL 2 DETAIL 3 DETAIL 4
SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH SPECIAL LATERAL 'V' DITCH
I Nol to Swle) (Nelro Scale) (N°I le Scale)
X of Fill \ Fill
N.., � �.� °' Fill Ground :) D 3'\ `yec Slop Naloral 3' Slope
Ground 3.) D �e Slope F Ground :) D
u Min. D= 1.0 Ft. d
B= 2.0 Ft.
Min. D= 1.0 Ff. Geole k Min. D= 1.0 Ft.
Type of Liner= Cl'B' RiVRap M° d= 1.0 Ft.
FROM -L- STA.13+38 TO STA.13+86 LT FROM -L- STA. 11+00 TO STA.12+75 LT FROM -L- STA. 12+75 TO STA. 13+64 LT FROM -DRV- STA. 10+26 TO STA. 10+50 LT
FROM -L_ STA. 13+15 TO STA. 13+48 RT FROM -L- STA. 11+50 TO STA. 12+75 RT FROM A- STA. 12+75 TO STA. 13+31 RT FROM -DRV- STA. 10+23 TO STA. 10+50 RT
FROM -L- STA. 14+09 TO STA. 14+42 LT FROM -L- STA. 14+20 TO STA. 15+50 LT FROM -L- STA. 14+00 TO STA. 14+50 RT
FROM -L- STA. 13+67 TO STA. 14+25 RT FROM -L- STA. 14+50 TO STA. 15+25 RT
PROJECT REFERENCE NO.
I SHEET NO.
I7BP.2.R.92
04
W SHEET NO.
_
ROADWAY DESIGN
HYDRAULICS
ENGINEER
I
ENGINEER
WETLAND AND SURFACE WATER IMPACTS DOCUMENT NOT CONSIDERED FINAL
N'qD UNLESS ALL SIGNATURES COMPLETED
BEGIN STATE PROJECT 17BP.2.R.92 8� N Rs 0 TGS ENGINEERS
-L- POT Sta. 10 + 65.00 SITE 1 ?O0; TGS 706 HILLSBOROUGH ST. STE. 200
0 RALEIGH, NC 27603
PH (919) 773-8887
O O CORP. LICENSE NO.: C-0275
YARDLEY LAMONT MORNING I ANDRES CASTILI
DB 2996 PG 08 I DB 3302 PG 856
MB 22 PG 19T
-L- PC Sto. 13+27.52 RIPRAPMAT
E
EMBANKMENT
CELASSSE iI''IRIPI-RAP END STATE PROJECT 17BP.2.R.92
EST. 30 SSn�,, GEO EXTILE RIP -RAP AT -L- POT Sta. 16 + 61.00
SPEC. LAT. BASE `-v' EST. 60 SY EMBANKMENT
DITCH SEE DETAIL 1
{ SEE DETAIL 3 IF_ / CLASS 'I' RIP -RAP
S ,S EST. 20 TONS
j' CLASS II RIP -RAP GEOTEXTILE
STRUCTURE PAY ITEM E5T.4o SY -L- PT Sto. 15+44.75
CLASS 'B' RIP -RAP
i T EST. 2GEOT TONS I SHED �.
1
O
EST.7 Y
1 i EST. 7 SY�_65 L
/
O
it I 18' RCP -IV I I
D /
+ 3B.22
MARY HARRISNAFKINSON HEIRS
CIV-L- POT Sta.12+2829 =
-DRV- POT Sto.10+00.00
PERMIT DRAWING GWSPEC.
CNOT DISTURB DITCHLATSHEET 2 OF 5ONC.PAD SEE DETAIL 2
_j 41
p0
/' Q
Q I SPEC. LAT.'V' II Q 1 E
DITCH I I E C E
SEE DETAIL 2 II ESE-- RDE _ PDE_ C - --- c \ F
t
I E I C----------c - - -
C AT -
EXIST R/ - ® \ - _ EXIST R/W
C _ I5' RDPE REMOVE _ RE O - a
R >-----
�V 15'RCP ,�4 O OV // / IN IB"RCP C
--__
GREU TL-0 �
F F i ,E 18" �o ,x'1, F F
--T -_ _ --
---_----_r- ---_--
F7 FDP _ FDPS FDP$ 2'FDP$ 30
- - - - =�- -- - BEGIN SBG ® TB2G1 // -- - - - - - -
�/ - - - - - -
k k N -- ---- 13+08"SRCP-IV -L- /� O /S+OO N l6'O3'O7.9e N 25'TYP. NO+I k
Al /6' 52 55 0e
m m SBG
25 TYP. SR l4/8 l57ATON HOUSE Rb120 857 N 73 07' 05.0" E 13+D14.63 B -3
® TB2GI
-- --------.��-- S-w ------ - - FDPS_ -- ----- --_-- g:l -S�_- �_-3'fBPS------------_ FDPS
F F H �F�� i - - - w--------- �, F_ --------G-F-----------F z
-- o---°---_-o -- --_ _°-�- _----- - - - -°- GREU TL�3-- I 75
�
100' TAPER C C _ 4 _ - C I lid
X-X&�-E3X EXIST R/vim_ XX-X-(� X x - X X X > _ - C - - - - - - - C T i BMIO ExisT R/w
SPEC. LAT.'V' \ C I
DITCH O `� -- _ ' PDE PDE o PDE PDE C PDE � I
PUE SEE DETAIL 2 PD TE �a - REMOVE
\ y C EXISTING
PUE PU� \P\UE E E PU BRIDGE PU PUE PUt PUE
I I
n\ �, SPEC. LAT. BASE SPEC. LAT.'V' o_ I
N \ DITCHD
C
-D - PC Sto. 10+23.00 �F \\ \ t- SEE DETAIL 3 SEE DETAIL 2 I ,
I I
BARNHILL CONTRACTING / \ m \ m
COMPANY SPEC. LAT.'V'
40
DB 3414 PG 487 SSEECDETAIL 4 \ \ / o? V WOODS I
CLASS B' RIP -RAP I I
O
EST.10 TONS
2 GEOTEXTILE A
EST. 25 SY
.. .. .. .. .. ._ I ti
SPEC. LAT. 'V'
DITCH
SEE DETAIL 4 I I
CLASS B' RIP -RAP
GEOT
EST. TOILE
NS I I
EST15 SY
E15 SY I I
-DRY- PRC Sta. 10+6831 SPFC. LAT. BASE
DIT-DRV- POC Sto. 11+OO.00 SEE D
DETAIL 3
BEGIN APPROACH SLAB I I END APPROACH LA9 ---__
END CONSTRUCTION -L- STA 13+2393 RIP -RAP AT -L- STA 14+33A.
-DRV- $ EBANDETAIL11T ~l
P/ Sto 14+36.14 P1 Sto 10+46BO P/ Sto 11+15.09 BEGIN BRIDGE CLASS 'I' RIP -RAP END BRIDGE
�7 EST. 20 TONS
A = 949' 47.P (RT) A = 43' 16' 17.6" (LT) A = 75' 52' 55.5" (RT) Q� -L- s7A /3+3453 ES . 4 SY -L- STA 14+223T
D = 0' 22' 55J" D = 95' 29' 34.7' D = 95' 29' 34.7e -DRV- PT Sto.11+4778 RIP -RAP AT JEFFREY iEEL & E R LEWIS CONS 65 INC
\ LORI BROWN HARRIS DB 2019 PG 565
L = 21723' L = 45.31, L = 79.46, �� EMBANKMENT
L 1
T = 108.62' T = 23BO' T = 46.78, CELASSE IAIRIP-RAP
DB 3054 PG 7n
R = 15.000.00 R = 60.00' R = 60.00' GEOTEXTI ENS GO
SE = NC SE = NC SE = NC -DR/- POT Sto. 11+69.75 EST. 75 SY J
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
®DENOTES IMPACTS IN
SURFACE WATER
BEGIN STATE PROJECT 17BP.2.R.92 SITE
DETAIL 1
RIP -RAP AT EMBANKMENT
(Nel to Scale)
on�n
Grade 1.5
Type of Liner= CI- 'I' Rip-Rop
DETAIL 2 DETAIL 3 DETAIL 4
SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH SPECIAL LATERAL 'V' DITCH
I Nol to Swle) (Nelro Scale) (N°I le Scale)
of Fill ,� Fill
Fill Ground :) D 3'\ `yec Slop Naloral 3' Slope
Ground 3.) �°�°e Slope F Ground :) D
u Min. D= 1.0 Ft. d
D
B= 2.0 Ft.
Min. D= 1.0 Ff. Geoledile Min. D= 1.0 Ft.
Type of Liner= Cl'B' RiVRap M°x. d= 1.0 Ft.
FROM -L- STA. 13+38 TO STA. 13+86 LT FROM -L- STA. 11+00 TO STA. 12+75 LT FROM -L- STA. 12+75 TO STA. 13+64 LT FROM -DRV- STA. 10+26 TO STA. 10+50 LT
FROM -L_ STA. 13+15 TO STA. 13+48 RT FROM -L- STA. 11+50 TO STA. 12+75 RT FROM A- STA. 12+75 TO STA. 13+31 RT FROM -DRV- STA. 10+23 TO STA. 10+50 RT
FROM -L- STA. 14+09 TO STA. 14+42 LT FROM -L- STA. 14+20 TO STA. 15+50 LT FROM -L- STA. 14+00 TO STA. 14+50 RT
FROM -L- STA. 13+67 TO STA. 14+25 RT FROM -L- STA. 14+50 TO STA. 15+25 RT
PROJECT REFERENCE NO.
SHEET NO.
17BP.2.R.92
04
W SHEET NO.
_
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
NAD 8 UNLESS ALL SIGNATURES COMPLETED
TGS ENGINEERS
-L- POT $ta. 10 + 65.00 -- �N RS 2O� TGS 706 HILLSBOROUGH ST. STE. 200
0 RALEIGH, NC 27603
CORP. CENSE Ho :c-0275
UIARD MORNING s ANDRES CASTILI /
G 08 DB 3302 PG 856
19T _ i n/ /
-L- PC Sto. 13+27.52 / m b A.
-RAP ENT
zs _CASTRIP-RAP/% /n/ / // END STATE PROJECT 17BP.2.R.92
/ I EST. TONS, /i
S�, RIP -RAP AT -L- POT Sta. 16 + 61.00
SPEC LAT BASE `v' / I ' / / / / EMBANKMENT
DITCH / // / I I I I / / CIA DETAIL 1
SEE DETAIL 3 I- / / I / / \ I \ — EST. TE TONS
II RIP -RAP GEOTEXTILE
_ 'SIfRUCTURE PAY ITEM\ _EsyAQ5M ,- -L- PT Sto.15+44.75
CLASS 'B' RIP -RAP / _ f-�
O EST. 2 TILE / OZ /�ti // // .o AV III 1� 2A-i W' - 6FD
EST. 2 TONS 28 � � ED � ,
/ /
EST.7 SY
18"RCP-Iv
D Bill
4- 3,22I
ISFD �,/ /' / / / A / / 41Y �ARR1S� T�INs9►+
-L- POT Sta.12+2829'� ��/�/-za��///
-DRY- POT Sto.10+00.00 /d //� A / PERMIT DRAWING
/ DO NOT DISTURB , / / e� i '' SEE DE LAT
Y SHEET 3 O F 5
Co
PAD I ( �� I /N/ / / // �Q7 I^S SEE DETAIL 9ti
�� �.
SPEC.DITCr.'v' �� / ttl / �� E E �/ W/ X, /
SEE DETAIL 2 , II E�E / — / RAE — PDE \\---
C C-------/ C
----
__- Exlsr R/ I � � - - _ "--E-wsca✓
IIE�
- _
IS'RCP- -- ---- _ -
RE OV''~` IN IS RCP �'i 2 _
>� -- _ O 15'RCP a
6RE17-T��Z
-----�. L--
F i� 18" TTTTT
1 F �— ------ �
OV -
?'FDPS
T - - FDPS / �_s _ _ = FDPS
.- .. .. _
_ -- _ --- BEGIN SBG ® I12G1--
i
m m o 13+09.$4_ 15+00 0 o rn
x — T8" cP-IV /� -L O z5
N ' P.
W t
J N /6'03'07,9E
-28-- __ END SBG B -3 /
k k $ 25'TYP.I n� N _13-+1u3 0 / i
SR 1418 (STATION HOUSE Rb) 20' BST 73. 07' 05.0" E - ® TB2GI
----------.��-- S-w _---- - --- FDPS_ -3TfBPs-- - --------_30,w--
F v F H 7---\__ ✓ c-F-------__--_�
_ N�586 - _ ___ - . - I _ _ _
cu. O - 2-- -
__-- ---- __- ___ ,. --- - _ - --- -_
100'SAPFR- - LZ-�' -� - -_ d - -_ _ �y ° -- -_ _ _��`/ I I _--
-SZ- --��
EXIST R/ X X - X X �>. > : O _ "�� / 7[RS777/1�—
X 3x `� X�=3X�-X-(� � --- / � .. C - - �g - _ _ �-6Z C - - � I �16�
SPEC. -1.'V' \ C / ' C _ - / I i
DITCH O `C _ PDE SAE PDE -PDE PDE
_ _ PUE SEE DETAIL 2 PD TE a . REMOVE / / _
\n _
� 4`` , /C / ' ' / / EXISTING I /
_ __ - / BRIDGE
PUE PU 1 �UE �� E E / / POE--O£ P�1 Imo— PUE
SPEC. LAT. BASE SPEC. LAT. 'V'-
DITCH IT H
SEE DETAIL 3- -- --SDEE�DETAIL 2 I I v9,
-D - PC Sto. 10+2300
F \ /
coN titiq
BARNHILL CONTRACTING Z' � \ m `�f/� / ,/ ////4b
sPEG.LAr.'v' " /
COMPANY DITCH//%%' /// // //
DB 3414 PG 487 SEE DETAIL 4 / ��\ // / /// / �_ / %' / ,' / / , AV / woods
CLASS 'B' RIP -RAP
O EST. 10
TE TONS / \T
2 �EST.25 SVE
---- SPEC. LAT.'V'
6Z�� SEE DETAIL 4 -31
CLASS 'B' RIP -RAP
E5T.5 TONS
\GEOTEXTILE
ST.15 sY
-DRV- PRC St&,10'+68.3/ V SPEC. LAT.ens�\�\VAAA����
-D - POC Sty lI+OOAO SEE DETAIL 3/ I /
SPD
/ PR( ✓ , � V E D aRRRoacRBE �P-----
END CONSTR�T7 �� ,3+2 I I /RIP -
EMBANKMENT �V �� -L- STA 14+33A. \
-L- -DRV- E BEGIN BRIDGE I / SEE DETAIL 1 \ END BRIDGE
/ CLASS T RIPRA\ \
P/ Sto 14+36.14 Pt Sto /0+46.80 P/ Sto 11+15A9 \ /// / . I E5T. 20 TONS
0 = 949' 47.r (RT) p L 411617.6U) 0 = 75e 52 555VRTJ A� I c- STA ,3+jgb3 1/�/I FGSEogDSaE \ A �- STA ,4+2z�
D = 0 22' 55J" = 95e29' 34.7' D = 95e29' 34.7E fo -DRY- /pfil Sifd �l 4778 //// i RIP -RAP AT \ \ JEFFREY TEEL & E R LEWIS CONS CO INC
/ I I EMBANKMENT \ \ LORI BROWN HARRIS DB 2019 PG 565
L = 21723' L = 453r L = 79.46, I 11
/ / A SEE DETAIL 1 AI \ DB 3054 PG 711
T = 108.62' / T = 23.80' T = 46.78 1 1 \ \ A N \ \ III I� A ��CLA.SS Iror"P ,1 j
R = 15,000.00 oc R = 6000 R = 60W -DRV- POT ig , \ \ GEPTExrlE O SE = NC SE = NC SE = NC �:�2) `\ I �st.75 SY o
WETLAND AND SURFACE WATER IMPACTS
I
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 13+74 to 14+19 LT
1 @30', 1 @55' Cored Slab
< 0.01
< 0.01
9
21
1
-L- 13+35 to 13+83 RT
1 @30', 1 @55' Cored Slab
< 0.01
< 0.01
10
22
TOTALS*:
< 0.01
< 0.01
19
43
0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2018 Feb
W
C
s
E
L
a
T
S
i
v
O]
Co
71
C_
3
O
L
O
C
N
E
STATIC OF NORTH CAROL INA
nTI7TCT((-�)NT �(111P T TTrI�T 1A7' A 7,7C
STATE
STATE PROJECT R
BREET
NO.
TOTAL
SI@8T&
N.C.
17BP.2.R.92
TQ PROl.N0.
.A.PROl.
OL+9CRIP]TON
17BP.2.R.92
WA
PE
17BP.2.R.92
WA
RW, UTIL
17BP.2.R.92
WA
CONST.
NING
F6
1419
CHOOL RD.)
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III DOCMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared For:
HYDRAULICS ENGINEER
DIVISION OF HIGHWAYS
20 20 40
ADT 2020 = 440
1000 Birch Ridge Dr., Raleigh NC, 27610
10 0
ADT 2040 = 520
D H V = 12 %
TGS TGs ENGINEERS By:
706 HILLSEOROUGH ST PH (111) 131-1117
� CORP. LICENSE NO.:
suITE zoo
S °g�
@r
Q
PLANS
D
LENGTH ROADWAY TIP PROJECT 17BP.2.R.92 = 0.096 mile
cons
rr RALEIGH, NC z76o3
P.E.
20 10 0 20 40
= 55%
T = 15%
V = 60 MPH
LENGTH STRUCTURES TIP PROJECT 17BP.2.R.92 = 0.017 mile
SIGNATURE:
® Ty
r
g
�A
2018 STANDARD SPECIFICATIONS
V. MARCUS LOWERY, PE
TOTAL LENGTH TIP PROJECT 17BP.2.R.92 = 0.113 mile
RIGHT OF WAY DATE:
ROADWAY DESIGN
ENGINEER
PROFILE (HORIZONTAL)
* TTST =4 % DUAL =11 %
OCTOBER 9, 2019
*tee
1' �®
OP,
PROJECT ENGINEER
LETTING DATE:
MARCH 17, 2020
4 2 0 4 B
FUNC CLASS =
LOCAL RURAL
SUB -REGIONAL TIER
DAVID STUTTS, PE
P.E.
8����
NCDOT CONTACT
PROFILE (VERTICAL)
SIGNATURE.
KI ALLOWABLE IMPACTS ZONE 1
\\\\\\\ ALLOWABLE IMPACTS ZONE 2
DETAIL 1
RIP -RAP AT EMBANKMENT
(Nel to Scele)
1
oa�n
Grade 1.5
Type of Liner= CIa T Rip l
DETAIL 2 DETAIL 3 DETAIL 4
SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH SPECIAL LATERAL 'V' DITCH
I Nw 1° Swle) (Nel ro Scale) (N°I le Scale)
of Fill 3.\
N.., � �.� Fill Ground :) D 3'\ `yeS Slop Slope
Nalo I
Ground ,?.) D �e Slope F Ground :) D
u Min. D= 1.0 Ft. d
B= 2.0 Ft.
Min. D= 1.0 Ff. Geole k Min. D= 1.0 Ft.
Type of Liner= Cl'B• RiVRap M°x. d= 1.0 Ft.
FROM -L- STA. 13+38 TO STA. 13+86 LT FROM -L- STA. 11+00 TO STA. 12+75 LT FROM -L- STA. 12+75 TO STA. 13+64 LT FROM -DRV- STA. 10+26 TO STA. 10+50 LT
FROM -L- STA. 13+15 TO STA. 13+48 RT FROM -L- STA. 11+50 TO STA. 12+75 RT FROM A- STA. 12+75 TO STA. 13+31 RT FROM -DRV- STA. 10+23 TO STA. 10+50 RT
FROM -L- STA. 14+09 TO STA. 14+42 LT FROM -L- STA. 14+20 TO STA. 15+50 LT FROM -L- STA. 14+00 TO STA. 14+50 RT
FROM -L- STA. 13+67 TO STA. 14+25 RT FROM -L- STA. 14+50 TO STA. 15+25 RT
PROJECT REFERENCE NO.
SHEET NO.
17BP.2.R.92
04
W SHEET NO.
_
ROADWAY DESIGN
HYDRAULICS
ENGINEER
I
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
BEGIN STATE PROJECT 17BP.2.R.92 N� UNLESS ALL SIGNCOMPLETED
SSS GS ENGINEERS
-L- POT Sta. 10 + 65.00 SITE 1 qo a� _
EN�r%�I 7000 PH
919) 7 NO.: C-027500
BUFFER IMPACTS
YARDLEY LAMONT MORNING ANDRES CASTILLO HELAREZ
DB 2996 PG 08 DB 3302 PG 856
MB 22 PG 19T
-L- PC Sto. 13+27.52 RIP -RAP EMBANKMAT
ENT
CLASS SEE
DETAILiI''IP IRI-RAP END STATE PROJECT 17BP.2.R.92
EST. 30 SSn�,, GEO EXTILE RIP -RAP AT -L- POT Sta. 16 + 61.00
SPEC. LAT. BASE `-v' EST. 60 SY EMBANKMENT
DITCH SEE DETAIL 1
{ SEE DETAIL 3 I(-" / CLASS 'I' RIP -RAP
S ,S EST. 20 TONS
j• CLASS II RIP -RAP GEOTEEST.40 SY
ILE
STRUCTURE PAY ITEM E5T.4o SY -L- PT Sto. 15+44.75
CLASS 'B' RIP -RAP
i ) EST. 2GEOT TONS I SHED �.
1
t O
EST.7 Y
1 i EST. 7 SY /
O
it I 18' RCP -IV I I
D B2 /
1
+ 3.22
MARY HARRIS ATKINSON HEIRS
/
-L- POT StoC N/F.12+2829 =
-DRY- POT Sto. 10+00.00 1 --- v F�PE�RIMIT DRAWING
� � "� Ww DITCH
'V'DO NOT DISTURB e4.CONC. PAD 1 � SEE DETAIL 2 SEET 2 OF 6
£) fl E3 G3 £3 it I J Pq p I v
i �yo�y j
_� Q I SPEC. LAT.'V' It Q i E X" A,/ E
DITCH
SE E DETAIL E RD L/ 1 - --- 8
--- --- ® OV 5'RCP OV - - EXIST R/W
ExlST R/-------
J \ P
IS' HDPE REMOVE - _ O -� RE O - RETAIN is FCP_
� m / GREU TLC F p F
F F i ,E 18" �� �'L F
--T -_ --
F7FDP _ FDPS FDPS 2'FDP$ 300
- - - - =�- -- - BEGIN SBG ® TB2G1 -- -----
k k N -- ---- 13+08"SRCP-IV -L- 0O 15+O10 N l6'O3'O7.9e N 25'TYP. LO+I k
Alf /G 52 55 0w
m m 25 TYP' SR l4/8 lSTATON HOUSE Rb120 BST N 73* 07' 05 0 E 13++14.63 END SBG B 3
® TB2GI
-- _-------.��__ 5-w ------ - - FOPS_ FDPS
-3'fBPS---_-------_---_30,w-_
F F H �F�� i - - - w-- ---- �, F--------G------
-----F z
_ -- o---°---_-o -- --_ _°-�- _---------°- 9 _- - _ _-GIEITT«�- GIN-SBG-_ - - W O GREU TO 75
OVE
100' TAPER C C _ 4' - I I F
X ;�-X€.�-E3X ExlsT aiv X�=3x-X-� X _ X X / _ - - - - _ - C T BMIO ExisT a)w
SPEC. LAT. 'V' \ r- /////
DITCH O C - - // PDE PDE
PUE SEE DETAIL 2 PD TE 4�a �� '� REMOVE f
1 y C ! EXISTING
PUE PU �UE /// E E PU BRIDGE PU PUE PUS PUE
SPEC. LAT. BASE SPEC. LAT.'V' o i
Xi. DITCH DITCH I I
\ / SEE DETAIL 3 SEE DETAIL 2 I I
-D - PC Sto. 10+23.00 �F \ h/ t-
N
\ ?� ^ - I 1
BARNHILL CONTRACTING z" \ / CO �`` w
COMPANY SPEC. LAT. 'V' / (NV I I
DB 3414 PDITCH
G 487 SEE DETAIL 4 \ // /• o WOODS I
CLASS B' RIP -RAP �
I
O EST. TONS
2 GEOTETEXTILE
m
EST. 25 SY
.. .. .. .. .. ._ I ti
SPEC. LAT. 'V'
DITCH
SEE DETAIL 4 I I
CLASS B' RIP-RAPEST. 5
GEOT
EST. TOILE
NS I I
EST15 SY
E15 SY I I
_ I
-DRY- PRC Sta. 10+6831 SPEC. LAT. BASE
-DRV- POC Sto. lI+OO(K7 DITCH 3 FD
BEGIN APPROACH SLAB I END APPROACH LAB _____
EpNtD CONSTRUCTION -L- STA 13+2393 RIP -RAP AT -L- STA 14+33A.
-DRV- SEE DEALI11T �l
P/ Sto 14+36.14 P1 Sto 10+46BO P/ Sto 11+15.09 BEGIN BRIDGE CLASS 'I' RIPRAPEND BRIDGE
�7 EST. 20 TONS
A = 949' 47.P (RT) A = 43' 16' 17.6" (LT) A = 75' S2' S5.5" (RT) Q� Ll
-L- STA /3+3453 ES . 4 SY -L- STA 14+223T
D = 0' 22' 55J" D = 95' 29' 34.7' D = 95' 29' 34.7e -DRV- PT Sto.11+4778 RIP -RAP AT JEFFREY iEEL & E R LEWIS CONS 65 INC
\ LORI BROWN HARRIS DB 2019 PG 565
L = 21723' L = 45.31' L = 79.46' �� EMBANKMENT
T = 108.62' T = 23BO' T = 46.78' CELASSE IAIL 1 DB 3054 PG Tn
RIP -RAP
R = 15.000.00 EST. 35 TONS
..GEOTEXTIEGO
SE = NC SE = NC SE = NC -DRV- POT Sto. 11+69.75 EST.75 SY J
KI ALLOWABLE IMPACTS ZONE 1
\\\\\\\ ALLOWABLE IMPACTS ZONE 2
DETAIL 1
RIP -RAP AT EMBANKMENT
(Notro Scele)
1
oa�n
Grade 1.5
Type of Liner= Cl— T Rip -Rap
DETAIL 2 DETAIL 3 DETAIL 4
SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH SPECIAL LATERAL 'V' DITCH
I Not to Swle) (Net ro Scale) ( Net le Scale)
of Fill 3.\
N.., �.� °' Fill Ground :) D 3'\ `yeS Slop Slope
Nato
Ground 3.) D �e Slope F Ground :) D
u Min. D= 1.0 Ft. d
B= 2.0 Ft.
Min. D= 1.0 Ft. Georo k Min. D= 1.0 Ft.
Type of Liner= Cl'B' RiVRap M°x. d= 1.0 Ft.
FROM -L- STA. 13+38 TO STA. 13+86 LT FROM -L- STA. 11+00 TO STA. 12+75 LT FROM -L- STA. 12+75 TO STA. 13+64 LT FROM -DRV- STA. 10+26 TO STA. 10+50 LT
FROM -L- STA. 13+15 TO STA. 13+48 RT FROM -L- STA. 11+50 TO STA. 12+75 RT FROM A- STA. 12+75 TO STA. 13+31 RT FROM -DRV- STA. 10+23 TO STA. 10+50 RT
FROM -L- STA. 14+09 TO STA. 14+42 LT FROM -L- STA. 14+20 TO STA. 15+50 LT FROM -L- STA. 14+00 TO STA. 14+50 RT
FROM -L- STA. 13+67 TO STA. 14+25 RT FROM -L- STA. 14+50 TO STA. 15+25 RT
PROJECT REFERENCE NO.
SHEET NO.
17BP.2.R.92
04
W SHEET NO.
_
ROADWAY DESIGN
HYDRAULICS
ENGINEER
I
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
BEGIN STATE PROJECT 17BP.2.R.92 q� � UNLESS ALL SIGNATURES
ENGINEERS
-L- POT Sta.10+65.00 SITE 1 a °j
N � I:I:as 706 HILLSBOROUGH ST. STE. 200
0 RALEPH IGH, NC 27603
O 87
BUFFER IMPACTS 2p CORP. LICENSE NO.BC-0275
YARDLEY LAMONT MORNING s ANDRES CASTILLO HELAREZ
30- DB 2996 PG 08 DB 3302 PG 856
MB 22 PG 19T _ i / 4N
-L- PC Sto. 13+27.52 / N b A At
EMBANKMENT/
/-23_JoEE DETAIL I,
-CLASS TRIP -RAP / wti / END STATE PROJECT 17BP.2.R.92
EST730 TONS,
SSn�,, aGHOTf,1F I E / / RIP -RAP AT -L- POT Sta. 16 + 61.00
SPEC LAT BASE `v' L/ I / T / / EMBANKMENT
.. DITCH // / I I I I / / / / / CLA SSEE TAIRIP-RAP
L 1
SEE DETAIL 3 / I- / / / / I / / / / / �^ \ I / EST. 20 TONS
/ / // / �' CLASS II RIP -RAP A GEOTEXTILE
CLASS 'B' RIP -RAP _ I / ,G \ \SIfR4CTUgE PAY ITEM\ _ -L - PT Sto. 15+44.75
/ O E OTEXTILE
TONS �S@ED -9Z� // // / \ I N GFo
EST.7 SY
/ II 18" RCP -IV
S� / ^/�•� �,/ /: / / // //// / / A / / 411 HARR1S A I KINSON/HE1RS' '
1 �I ISFD / 4J' " Y/
-L- POT Sta.12+2829 = I 1
I I �� 1, // / I 11 III / / SPEC. LAT. 'V'
-DRY- POT Sto. 10+00.00 / l /ZP
/ DO NOT DISTURB j /' •ed /// DITCH • E RM I T D RAW I N G
-I� I CONC. PAD /�S SEE DETAIL 9�'
£� fl t3 G3 c3 �IJ CRY ��`� 1 // / /� // ' � // / / SHEET 3 OF 6
I �Q SPEC. LAT.'V' E /
a i I 2
SEE DETAIL z E
� �
' -�� AT -
'RCP } IS'HDPE R�IAOVE - --- O RC - _- Oy. / /,ICE 0 - ETAIN
- is, RCP $ -
6REi -
/ --T - --T' - -- _ ----_- --
F7 � .. .. •' I 'P-� 'FDP T FDPS __ _ _•. -_ , �-s � --_ FDPS----_-- - 2'FDPS
0
L _
BEGIN SBG
m m O 13+09. __ // 15+�00 0 o m
x m — 9 1v / /! =L o N /6' 03' 079e
-28-- __- END SBG B -3 / ///
p 25' TYP. SR 1418 ISTATON HOUSE Rb) 20' BST IV 73. 07' 05L E 13 1#b3_ O / l / '� �7 L //I
F — ---- F — w — -- FOPS — - - __� — — — --- - 8'1 S%P— 5 �—-3'fBP�--_,— _---_—
F -2
v w 7---mac �— — —— — — — —c— �. _—� — _— - -_ __ - - — � w— i w GREU TL-----�— j � -- _ °
FDPS
- -
- GREU_T« O _ h�
alrr... O. i — — OV _ --
704'SAPFR— — LZ-C 8Z —— ° Z-- ---
- Exlsr Ri X X - X "t^
x—xE—E3x x�3X—X—(� / — — —
1:RfST"F/4o- —
DITCH O / (3E �PDE / PDE /oE"
PUE SEE DETAIL 2 PD P�E a / �/ / REMOVE /-
BRIDGE 7
--- C / ///EX STING
--_
PUE PU UE Q� E E/ / Bd i PU ' / POE —os P�1 PUE
SPEC. LAT. BASE SPEC. LAT. 'V' i' ^� i I
\ // , / • /////// / / / DI
DITCDEIFAIL 3_- --SEE-DETAIL 2 SEE I II a
PC Sto. 10+2300 ci
-D h/
- \
BARNHILL CONTRACTING Ca� /%/j / / //�/ /'°/i-
COMPANY DITCHLAT. 'V' / ///�o / / // �/ / /
DB 3414 PG 487 SEE DETAIL 4 WOODS
/ ��// / �J / % / I y
CLASS 'B' RIP -RAP ""V ✓/ /// // / /�� //
EST. 10 TONS / T _
O GEOTEXTILE
"EST. 25 SY
-----' SPEC. LAT. 'V' / DITCH
�6Z-' SEE
C�DETBIL4 SS RAP�
EST. 5 TONTEXTILES I ///
\1,
GO1 ( N���VA�C / I I G+
STE.15 SY
-DRV- PRC Std,10'+683/ V S CHur.ens�\�\VAAA\�� \ l / 1
SEE DETAIL3/ SPD
� �-D - POC Sty lI+OOAO END ,aRRRoacR Lae
/ END CONSTRUC l0 I / -----
/ �L� I�� /-;+� I I / /� EMBANKMENT �V �� -L- STA 14+33A. \
-L- -DRV- E BEGIN BRIDGE / / // / SEE DETAIL 1 \ E D BRIDGE
/ CLASS T RIPRAP\ \ \
P/ Sto 14+36.14 P/ Sto /0+4680 P/ Sto llt/5A9 \ /// / . / E5r. zE TONS
0 = 949' 47.r (RT) p � 4.T16' 17.6 (LT) 0 = 75e 52 55.5VRTJ A� I L- STA 13+345s //i/// I og0 S \ A �- STA /4+2z�
D = O'22'55J" Q - 95e29 34.7' D = 95e29'34.7e fo —DRV— Pr1st6 p/ 47.78' //// RIP -RAP AT \ \ JEFFREY TEFL & E R LEWIS CONS 65Co 1NC
/ I I EMBANKMENT \ \ LORI BROWN HARR13 DB 2019 PG 565
L = 21723' L = 453r L = 79.46' 11
/ / A SEE DETAIL 1 AI \ DB 3054 PG 711
T = 108.62' / T = 23.80' T = 46.78 1 1 \ \ A N \ \ III 1�A��A� EeA.SST. 35 I, Rld-! °�j j
R = 15t000.00 oc R = 6000 R = 60� -DRV- POTg , \ \ TONS
GEOTExrILE O SE = NC SE = NC SE = A/C Est. 75 sY o
I
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
Site Station Structure ROAD PARALLEL
No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
CROSSING IMPACT (ft2) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
1
-L- 13+20 to 13+90 LT
1 @30', 1 @55' Cored Slab
x
432
300
732
1
-L- 14+10 to 14+80 LT
1 @30', 1 @55' Cored Slab
x
509
328
837
1
-L- 12+50 to 13+40 RT
1 @30', 1 @55' Cored Slab
x
389
747
1136
1
-L- 13+65 to 14+35 RT
1 @30', 1 @55' Cored Slab
x
312
214
526
TOTALS*:
1642
1589
3231
0
0
0
0
0
NOTES:
Total Buffer Impacts = 0.08 Ac.
Revised 2018 Feb
WETLANDS IN BUFFER IMPACTS SUMMARY
WETLANDS IN
BUFFERS
SITE STATION ZONE 1 ZONE 2
NO. (FROM/TO) (ft) (ft)
0 0
TOTAL: 0 0
NOTES:
No wetlands in buffer impacts at site.
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
9/16/2019
PITT COUNTY
17BP.2.R.92
Revised 2018 Feb I SHEET 6 OF 6