Loading...
HomeMy WebLinkAbout20140090 Ver 7_U-2579 B Impact Summary Table 2019-10_20191031 Wanucha, Dave From:Dagnino, Carla S Sent:Thursday, October 31, 2019 12:47 PM To:Wanucha, Dave; Braspennickx, Nicholle M CIV USARMY CESAW (US); Matthews, Monte K SAW; Chambers, Marla J Cc:Turchy, Michael A Subject:RE: U-2579B Permit Modification Application, Forsyth Co Attachments:U-2579 B Impact Summary Table 2019-10.pdf Hi Dave, Thanks for catching the items you mentioned below. The UT Smith Creek – Site 28A is an Intermittent Stream The 2309 LF stream impacts listed on the Permit Impact Summary Sheet has been corrected to Permanent Impact column. I was messing around with that spreadsheet to provide colors for impacts based on dates of modification and that number got misplaced. The cover letter is correct for impact numbers. I have attached a new Permit Impact Summary sheet here and it has also been slipped into the application online. Also, I added the relocation plans and the planning plans to the application online. Thanks and I will be in touch for a meeting time next week. From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Wednesday, October 30, 2019 4:39 PM To: Dagnino, Carla S <cdagnino@ncdot.gov> Subject: RE: U-2579B Permit Modification Application, Forsyth County Carla, I’m not seeing a stream designation for the new permit site 28A. Do you know if it is perennial or intermittent? As far as DWR’s mitigation requirements are concerned, will you confirm that to be 1,711 linear feet? Since impacts at 28A (80 linear feet) are related to a different stream and are less than 300 linear feet, no mitigation will be required by DWR for that segment. On the Impact Summary Sheet under Temporary SW impacts column, you have listed 2309 ac. Should that not be listed as permanent linear feet of impacts? Thanks. Dave Wanucha Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov 1 NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dagnino, Carla S <cdagnino@ncdot.gov> Sent: Monday, October 21, 2019 8:46 AM To: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Archer Sr, Wright <warcher@ncdot.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Earley, Jessica S <jsearley@ncdot.gov>; Abernathy, Brett <jbabernathy@ncdot.gov>; Moore, Byron G <bgmoore@ncdot.gov>; Turchy, Michael A <maturchy@ncdot.gov>; Robinson, Dan <dan.robinson@kimley- horn.com>; Puckett, Lester L <lpuckett@ncdot.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>; Ellwanger, Claire <claire_ellwanger@fws.gov>; Kiser, Marcus K <mkkiser@ncdot.gov>; Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Stark, David A <dstark@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: U-2579B Permit Modification Application, Forsyth County The Permit Application for the Modification of the U-2579B Section of the W-S Beltway has been prepared. The file can be downloaded here: https://xfer.services.ncdot.gov/pdea/PermApps Named U-2579B Smith Cr Modification October 21 2019 The file is also attached for your review. Please let me know if you have any questions regarding this application. Thank you! Carla Dagnino Environmental Coordination and Permitting Group Leader Environmental Analysis Unit NC Department of Transportation 919 707 6110 office cdagnino@ncdot.gov 1598 Mail Service Center Raleigh, NC 27699 -1598 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3 Site Station No. (From/To) 26 29+16-31 +12 -Y4RPC- 27A 104+63 - 107+53 -Y4- 27B 107+60 -Y4- 27C 107+58 - 108+44 -Y4- 50+50 _ 56+00 _vet 29 145+62 -Y4- 30 64+34 -Y4- 31 557+28 -L- Structure Size / Type ROAD FILL -POND ROAD FILL 42" WELDED STEEL 30" RCP ROAD FILL STREAMBANK STABILIZATION STREAMBANK STABILIZATION WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.05 Temp Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) <0.01 Hand Clearing in wetlands (ac) Permanent SW impacts (ac) <0.01 <0.01 SURFACE WATER IMPACTS Temporary SW impacts (ac) <0.01 0.115 Existing Channel I m pacts Permanent (ft) 205 130 116 3" 28 21 Existing Channel I m pacts Temp. (ft) 14 Natural Stream Design (ft) 2018 Permit Modifications 23 44+10 to 47+96 -Y4- 3 @ 8' x 9' RCBC Extension 0.06 151 STREAMBANK STABILIZATION 0.02 0.01 55 30 28 47+96 to 56+85 -Y4- 2 @ 10' x 10' RCBC and 0.51 2309 427 2127 1 @ 10 x 8 RCBC STREAMBANK STABILIZATION 0.02 120 I 28A 1 48+16 to 48+65 Y4 I UT to Smith Creek Relocation I I I I I 1 0.01 1 1 80 1 1 344 1 I 28B 1 48+84 to 53+86 Y4 I UT to Smith Creek Relocation I I I I 1 1 1.62 1 1 1 1 1 28C 54+20 to 67+00 Y4 2019 Permit Modifications Drain Pond 6.20 I I I STREAM RELOCATION I I I I I I 1 1 144 1 4r I SUBTOTALS, THIS PAGE: 0.05 <0.01 8.86 0.01 39359 84 2471 SUBTOTALS, PAGE 1 0.62 <0.01 0.05 1.53 0.19 59853 19344 SUBTOTALS, PAGE 2 1.20 0.02 3.67 0.03 39268 142 450 TOTALS: 1.87 <0.01 0.08 14.06 0.23 129480 19570 29921 11/19/2018 Revisions shown in red text. 10/10/2019 Revisions shown in green text. 9/18/2019 Revisions shown in blue text