Loading...
HomeMy WebLinkAbout20191238 Ver 1_Major Permit #85-19 William Rayner_20191030Strickland, Bev From: Sent: To: Cc: Subject: Attachments: Good Afternoon, Cannon, Amanda J Wednesday, October 30, 2019 5:05 PM Liz Hair; DCR - Environmental_Review; Cox, Heidi; Weychert, Curtis R; Harris, David B; Jenkins, Shannon; Gupton, Sharon; Walton, Tim; Moser, Mike; Montalvo, Sheri A; Sullivan, Shelton; Mairs, Robb L; Hall, Christine; Dunn, Maria T.; Butler, Rodney A; Eugene Foxworth Bodnar, Gregg; Howell, Jonathan; Styron, Heather M.; Sparks, Keri E Major Permit #85-19 William Rayner Application & Plans.pdf, William Rayner.pdf Attached is New Major Permit Number 85-19 for the above subject project in Carteret County. The original has been sent to the permittee via USPS. For questions or concerns, please contact Gregg Bodnar at gregg.bodnar@ncdenr.gov or (252) 808-2808 ext. 215. Thank you! Administrative Support Division of Coastal Management Department of Environmental Quality 252.808.2808 Ext. 200 252.247.3330 Fax Amanda.Cannon(a)ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 g Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1111111 MP-1 APPLICATION for Malor Development Permit Ilaat rwhwd 1=7106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landownertnformallon J Business Name _.--....-__.... ._.:.___ TPn7fed Name (If applicable) Kc y.v Applicant 1::FirstName //( Ml Last Namb /�/1 Applicant 2: First Name MI Last Name tireddg7onal appllamis, please attach on addillooM pagels) with narnos listed. Marling Address V-e PO Box CRY State .v c ZIP 497(o/;1 Country Wn Phone No. `7/`%• 34W--70y ext. TFA.,Ko. Street Address (ildiHerentfrom above) Cay Slate �...... Email / fN � it G ✓i... _ ��t._.,+..... \ �C.i-.MO r' � . C V -.1.n — -- 2. Agent/Contractor Information Business Name�����---- Agent/ Contractor is First Name MI Las! Name Agent/Contractor 2: First Nama _.�_ ._ _....._.. Ml Last Name w Mailing Address PO Box City Slate Zip Phone No. t Phone No. 2 • exi. - - exL FAX No. Contractor M Street Address (if different from above) City State ZtP i Email RECEIVED RECEIVED MAY 1 4. 2019 <Form continues on back> SEP 2 3 2019 'DCM-WARO DCM-MHD CITY Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location J $Veal Address �f T� r County (can be multiple) Stale Rd. p 14 Subdivision Name City state �J / )q /� rJ,-? C�•r.� NC. Zip ` - ASS � Phone No. 4fII-aY?-7tOy eat Lot Nb.(a) (if many, attach addiflonaf pogo with hall I I , a. In which NC river basin is the project Incad? b. Name ofy of water nearest2t proposed project c. Is the water Lady Identifrdn (b) above, natural or manmade? �alural IOUnknown d. Name the 1closet major water boil to the proposed project alto. []Manmade /y Ism 4r+�gl_j V„sV,. 9. Is proposod worf{.w'thin city limits or planning jurisdiction? I. It applicable, list the planning jurisdiction or city limit the proposed []Yes [at work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire Iraq (sr1.fL) NI r1 )8t*tIrt? s; 0- 6t,-w'/ r-cres a Size of individual lolls) d. Approximate elevation of tract above NHW (normal high water) or lot NWL(normal wator)evel i (it many sixes, pfease attach addi77onot page with a pay �— �UNIFFAr or DNWL e. Vegetation on trail I. Man-made features and uses now on tract / V Ci.�ife- g, Identify and describe ae exisgng land uses ediacer8 to the proposed project site. h, How does local government zone the tracts I. Is the proposed project consistent with the appllcable zoning? /\)O, 'al v'A (Attac"ning compliance certificate, if applicable) IIIIII Cs ONo QNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑yes LJ7o „Y k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Elyes QNA _ If yes, by whom? -_...__._-... ` 1, Is the proposed project located in a National Registered Historic District or does it involve a DYes ®Flo' [iNA National Register listed or eligible property? RCI,sCIVt U <Form continues on RtxCgVED MAY 14 2019 KD OCT,i8 LTiI:II•Iq'1 Form DCM MP-1 (Page 3 or 4) in, (p Are There wetlands on the site? (11)Are there coastal wetlands on the site? (gl) It yes to either(i) or (il) above, has a delineation been conducted? (Attach docutivirtadon, it available) n. Describe existing wastewater treatment facilities. /V t 0 APPLICATION for Major Development Permit ❑Yes :9 (]Yes t„two ❑Yes MNa� o. Describe existing drinking water supply source. /V / 1 p. oesuibe oxisting storm water management or treatment systems. 5. Activities and impacts a. Will the project be for commercial, public, or private use? ❑QdTimerclal ❑Publle/Govemment ❑PrivateiCommunity b. Give a brief description of purpose, use. and daily operations of the project when complete. SE-e rrfi'�� Le vv-e a. Oescnbe the proposed construction methodology, types of construction equipment to be used during construction. the number of each typo of equipment and where it is to be stored. t70,11 Sl �4 (trt (.I' d. List all development acttvillesyouprapose. --�-- I e. Are the proposed acliviliies maintenanco of an exexlsiing pmjent, new work, or both? ^� 1. What is the approximate total disturbed land area resulting from the proposed project) ❑Sq.Ftor ❑Acres TWI—lit—hoproposed project encroach on any public easement, public accossway or olhor area ❑Yes ynq ❑NA that the public has established use of? h. Describe location and type of axiatnng enJ proposed discharges to waters of the state.� ----- ----- -- --- o it. Will wastewater or stormwater be discharged Into a wetland? ❑Yes o If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ONO i j, is there any mitigation proposed? ❑Yes ❑NA-----�-� If yes, attach a mingalion proposal. _ _ _--___mrar VFn _ <Form continues on back> RECEIVED SEP 2 3 '2019 MAY 14 2019 DICK-WAR0 DCM-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit { 6. Additional Information In addition to this completed applkaRon IOhn, (MP-1) Iha toilowMg dams WOW, if applicable, must be submitted In otter for the appikedon package !o be complete, Items (a) - (0 am always applicable to any melor development application, Please consul[ the appikellon instruction booklet on how to property prepare the required items below. a. Aprojecl narrative. b. An accurate. dated work plat (lnetuding plan view and uosd-sec'f!it- I drawings) drawn b scale. Teas g Ih'e ptasenl sielue of tiro proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats. drawings to distdtguish bahveen work completed and proposed. c A site or location map that is sufficiently detailed to guide agency Personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. a. The appropriate application fee. Check of money order made payable to DENR. t A list of the narnos and complete addresses of the adjacent waterfront (ripadam landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed 1)r0100 to the Division of Coastal Management. Phone No.-----^—� .._.._-AAAddress---------------__...------.._ -._.__.-------- Name Phone No. - Address Name _ Phone No. Address g. A list of previous slate or federal permits issued for work on the project tract. Include permit numbers, parmittee, and issuing dates. h. Signed consultant or agent aulhortzallon form, If applicable. ._....._r.. I. weuand delineation, it necessary. ). A signed AEC hazard notice for projects in oceanfront and Inlet areas. (Must be signed by property owner) k. A statement of compilance with the N.C. Environmental Policy Act (N. (;.-f. t 13A T -10), it necessary. If the project in vows expenditure 0(publlo funds or use of public lands. attach a statement docunwniing complumce with the North Carolina Environmental Policy Act. i unuersiano mat any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best o my knowledge, � 1 , Date �7 / u,i U� �J Print Name W r �� c •^^ w,,.- Signature Please indicate application attachments pertaining to your proposed project. ❑RCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and CulverRI_CEI VED ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information RECEIVED MAY 14 2019 SEP 2 3 2019 DCM-WARQ . .1 1 1 DCM-MHD CITY , -il Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Appgcation for CAMA Major Permit, Form OCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1, DOCKING FACILITYWMARINA CHARACTERISTICS hie section not applicable i a. (I) Is the docking facility/manna: b. (I) Will the facility be open to the general public? ❑Commercial ❑PublIciGovemment ❑Pdvate/Community ❑Yes ONO { c. (I) Dock(s) and/or Per(s) d. 0) Are Finger Piers included? []Yes ONO (11) Number If yes: .-__---i0)Ledoth _ _ ___. _...--III)Number (Iv) Width (Ili) Length IV) Floating (]yes ❑No (Iv) Width _ IV) Floating ❑Yes ONO e. 0) Are Platforms included? ❑Yes ONO f. (1) Are Boallifts included? ❑Yes ONO If yes: If yes: (p Number _ (li) Number Oil)Length (Gq Length _ (IV) Width (IV) Width (V) Floating ❑Yes ONO Note: Pooled areas are cakufafed from dryi1me dimensions. g. (1) Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, Including travel lift and/or rail, repair Or (h Number of slips existing maintenance service ❑ Dockage, fuel, and madno supplies ❑ Dockage ('Wet slips") only, number of slips: _ ❑ Dry storage; number of boats: __ 0 Boat ramp(s): number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: 1. Describe the typical boats to be served (e.g.. open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Opon water; dredging for basin and/or channel QOpen water; no dredging required 00ther; please describe: k. Typical boat length: I. (i) Will the facility be open to the genareIREicCIE IVED ❑Yes ONO M. (i) Will the facility have tie pilings? MAY 14 2019 Oyes CINa (id It yes number of go pilings? RECEIVED - CCM-WARO DCM-MHD CITY VO4Isi 1)CIVI IV)P-rt Ist,nc. r,r�,, �3 4+. d ,,f ij 2. DOCKING FACILITY/MARINA OPERATIONS i0his section not epplicaue a. Check each of the following sanitary facilllles that will be ociuded in the proposed project.~-+_ Ni4 ❑ office Toilets ❑ Toilets for patrons; Number: _; location: D Showers ❑ Boatholding lank pumpout Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solld waste, fish offel and trash. d. How will overboard discharge of sewage from boats be controlled? s. (i) Give the location and number of "No Sewage Discharge' signs proposed. (11) Give the location and number of 'Pumpout Available' signs proposed. f. Describe the spacial design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. q. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I- If this project is an expansion of an existing marina, what types of services are currently provided? MAY 14 2019 DCM-WARO RECEIVED SEP 2 3 2019 DCM.MHD CITY Form 0CM MP-4 (Structures, Pago 3 of dj M. Is the madnetdocRing facility proposed whNn a pdm fy or secondary nursery area? DYes ON* n. Is the madnaldoddrg facility prOposad within or adjacent to any shellfish harvesting area? CIYes LINO a. Is trio madnaldoddng ractsty proposed within or adjacent be coastal wellandtamatsh (cW), sow"d aquatic vegetation ($AV), shell bottom 0% or other whoanas MR If any boxes are checked, provide the number of square feel atllded. E]CW OSAV OQB _ QWL 4 []None p. Is the proposed mednaldaddng facility located within or within close proalmity to any shalfth leasm) Dyes ONO It yes, give the name and address of the feassholder(s), and gwo the pro urroty to the lease. 3. BOATHOUSE (nciuding wyered files) 1261s seellon not applcable a. p) Is the boathouse strudure(s): OCanunercial Qpubuu0ovemn»nt OPdvateicommunity (II) Number _ 00) Length (Nl hWdih Note: Rooted areas are calculated from dniaNna dtmenabns. 4. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-2 Excavaiion and FA) cKm section not appficable a. g) Number (b) Length fig) Width 6. BREAKWATER (e.g., wood, shestplie, etc.) his section not applicable a. Length _ b. Average distance Nam NHW, NWL, or wetlands o. Maximum dstance beyond NHW. NWL or wouands 16. MOORING PILINGS and BUOYS Othis section notapplldeNs a. lam- umcture(s): . ..,mmarctsl OPuWidGovemment EjPdvatercommunity c. Distance to be placed beyond shoreline ,_,_, Note: this should be measured (ran marsh edge, Hpresent. e. Arc of the swing _ b. Number d. Description of buoy ;cola, 4Isodption, size, anchor, etc.) RECEIVED MAY 14 200 DCM-WARO - --vim° 24 20 0-tm4: I2,[7.61 DCM-MHD CITY Form !DY'M Niix-F4 (5zruelurrti, P.,yo 4 nt ..q 7. GENERAL a, Proximity of slructure(s) to adjacent riparian property lines Note. Far buoy ormooring lilting, use arc of swing Irrofuding lengfn of vessel. b, Width of water body a. p) Will navig�at�io% at aids be required as a result of the project? 0Yes ; o ONA (if) if yes, explaln what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facititfos, 11__—________.r,....._.._____.._... d. Water depth at waterward and of structure at NLW or NWL f:, fl . G.-jb /4u(( $. OTHER ❑This section not applicable —;___ ... _. ._ .a.--Ofve complete Date IAJnn S[I G z E Project Name Applicant a �'�'— Applicant Slgnaturo 21 i,i.l , ,ti ,air, --. ali,.;,i ,. ...,. RECEIVED MAY 14 2019 DCM-WARO RECEIVED SEP 23 2019 DCM-MHD CITY William Rayner Lease Modification i I l lts rdmate System NAO 1983 StatePlane North Carolina FIPS 3200 Feet c 55 1; o SEP2 3 2019 DCM-MHD CITY Permit Class NEW Permit Number 85-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r Vermtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to William R. Rayner, 4705 Rembert Dr., Raleigh, NC 27612 Authorizing development in Carteret County at within the Newport River, off of Mill Point Lane, near Morehead City , as requested in the permittee's application dated 5/14/19, including attached workplan drawing (1), dated 1 /24/ 19. This permit; issued on October 30, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shellfish Lease Boundary Markers 1) This permit authorizes only the activities associated with the installation and use of the four pilings associated with marking the boundary of the shellfish lease, as referenced in the attached workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this shellfish lease without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The location of the four pilings shall be located at the following GPS coordinates: 34 44.85659914N, -076 41.80208295W 34 44.84423811N, -076 41.77374900W 34 44.72514192N, -076 41.93802859W 34 44.68935268N, -076 41.87447099W (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. 01 /-W Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee William R. Rayner Permit No. 85-19 Page 2 of 2 ADDITIONAL CONDITIONS NOTE: The operation and gears associated with the oyster lease have been authorized by the North Carolina Division of Marine Fisheries oyster lease program and have been assigned permit numbers 1966753 and 1966761. General 3) The pilings shall be marked in accordance with state or federal marking requirements for shellfish leases. At a minimum the pilings shall be marked with permanent reflectors to make them more visible during hours of darkness or inclement weather. 4) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 6) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: This permit does not convey any rights, either in real estate or material. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Nationwide Permit 48 (Action ID SAW-2019-01936). NOTE: The N.C. Division of Water Resources assigned the project DWR Project No. 2019-1238. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $250 was received by DCM for this project.