HomeMy WebLinkAbout20181638 Ver 3_Att F - Updated Wetland Impact Table Appdx L-1 Oct 2019_20191030M Mountain Valley
MVP Southgate Project
Attachment F:
Updated Wetland Impact Table
(Appendix L-1 from Original
Joint Permit Application)
October 2019
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Pipeline Crossing
Permanent Fill
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
Method or Other
(acres) f/
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
Impact Type g/
Pipeline (Rockingham County)
W-C18-96-2: PFO
26.1
Cascade Creek -Dan River
36.541688
-79.632557
PFO
0.00
<0.01
<0.01
0.00
Workspace Only
(0301010309)
W-1318-98:PFO
26.5
Cascade Creek -Dan River
36.536541
-79.637494
PFO
15.04
0.03
0.01
0.00
Open -cut
(0301010309)
W-A18-22: PEM
26.7 RR
Cascade Creek -Dan River
36.534533
-79.638961
PEM
71.57
0.15
0.00
0.00
Open -cut
(0301010309)
W-A18-44: PEM
27.0 RR
Cascade Creek -Dan River
36.530434
-79.642596
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-44-2: PEM
27.1
Cascade Creek -Dan River
36.5297
-79.64466
PEM
1197.00
3.07
0.00
0.00
Open -cut
(0301010309)
W-A18-44:PFO
27.3
Cascade Creek -Dan River
36.528099
-79.646143
PFO
37.93
0.05
0.01
0.00
Open -cut
(0301010309)
W-A19-274: PEM
27.6
Cascade Creek -Dan River
36.525575
-79.648779
PEM
42.02
0.19
0.00
0.00
Open -cut
(0301010309)
W-A19-274-2: PEM
27.6
Cascade Creek -Dan River
36.525149
-79.649005
PEM
38.12
0.04
0.00
0.00
Open -cut
(0301010309)
W-A19-274-3: PEM
27.6
Cascade Creek -Dan River
36.525173
-79.649581
PEM
0.00
0.17
0.00
0.00
Workspace Only
(0301010309)
W-A18-39: PEM
28.0 RR
Cascade Creek -Dan River
36.520864
-79.653336
PEM
0.00
0.02
0.00
0.00
Workspace Only
(0301010309)
W-A18-26: PEM
28.1 RR
Cascade Creek -Dan River
36.51914
-79.654786
PEM
23.52
0.06
0.00
0.00
Open -cut
(0301010309)
W-A18-30: PEM
28.3 RR
Cascade Creek -Dan River
36.517081
-79.656412
PEM
26.16
0.03
0.00
0.00
Open -cut
(0301010309)
W-A18-30: PFO
28.3 RR
Cascade Creek -Dan River
36.516645
-79.656467
PFO
17.77
0.01
0.01
0.00
Open -cut
(0301010309)
W-A18-38: PEM
28.6 RR
Cascade Creek -Dan River
36.513261
-79.660106
PEM
0.00
0.02
0.00
0.00
Workspace Only
(0301010309)
W-A18-38: PFO
28.6 RR
Cascade Creek -Dan River
36.513211
-79.659994
PFO
40.56
0.04
0.03
0.00
Open -cut
(0301010309)
W-1318-48: PFO
29.1
Cascade Creek -Dan River
36.508367
-79.665188
PFO
23.43
0.05
0.02
0.00
Open -cut
(0301010309)
W-1318-48: PEM
29.1
Cascade Creek -Dan River
36.508421
-79.665299
PEM
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-18:PFO
29.8
Cascade Creek -Dan River
36.500614
-79.672663
PFO
934.84
2.33
0.64
0.00
Open -cut
(0301010309)
W-A18-18: PEM
29.9
Cascade Creek -Dan River
36.499656
-79.673716
PEM
49.52
0.07
0.00
0.00
Open -cut
(0301010309)
W-1318-39: PEM
30.2
Cascade Creek -Dan River
36.496101
-79.677639
PEM
24.63
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-39-2: PEM
30.2
Cascade Creek -Dan River
36.495973
-79.677734
PEM
40.47
<0.01
0.00
0.00
HDD
(0301010309)
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Pipeline Crossing
Permanent Fill
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
Method or Other
(acres) f/
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
Impact Type g/
W-1318-39-3: PEM
30.2
Cascade Creek -Dan River
36.495819
-79.677892
PEM
29.86
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-39-4: PEM
30.2
Cascade Creek -Dan River
36.49571
-79.678008
PEM
31.56
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-36: PEM
30.2
Cascade Creek -Dan River
36.495507
-79.678228
PEM
36.44
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-36-2: PEM
30.3
Cascade Creek -Dan River
36.495364
-79.678402
PEM
16.34
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-36: PFO
30.3
Cascade Creek -Dan River
36.495171
-79.678559
PFO
31.83
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-36-3: PEM
30.3
Cascade Creek -Dan River
36.494746
-79.679118
PEM
17.92
<0.01
0.00
0.00
HDD
(0301010309)
W-1318-36-4: PEM
30.4
Cascade Creek -Dan River
36.49434
-79.679615
PEM
0.00
0.01
0.00
0.00
HDD
(0301010309)
W-1318-36-5: PEM
30.4
Cascade Creek -Dan River
36.494219
-79.679657
PEM
26.67
0.03
0.00
0.00
Open -cut
(0301010309)
W-1318-36-6: PEM
30.4
Cascade Creek -Dan River
36.494116
-79.679934
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-1318-36-2: PFO
30.3
Cascade Creek -Dan River
36.493988
-79.67824
PFO
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-1318-36-3: PFO
30.4
Cascade Creek -Dan River
36.493689
-79.678682
PFO
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-1318-36-4: PFO
30.4
Cascade Creek -Dan River
36.493332
-79.678692
PFO
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-1318-34: PFO
30.4
Cascade Creek -Dan River
36.493049
-79.678695
PFO
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-1318-34-2: PFO
30.5
Cascade Creek -Dan River
36.49309
-79.680105
PFO
179.81
0.45
0.12
0.00
Open -cut
(0301010309)
W-A18-54: PEM
30.7
Cascade Creek -Dan River
36.490849
-79.683335
PEM
11.24
0.01
0.00
0.00
Open -cut
(0301010309)
W-1318-103: PEM
31.1
Cascade Creek -Dan River
36.485665
-79.68523
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-141: PFO
32
Cascade Creek -Dan River
36.476993
-79.696049
PFO
182.61
0.34
0.13
0.00
Open -cut
(0301010309)
W-A18-141: PEM
32
Cascade Creek -Dan River
36.477148
-79.696159
PEM
0.00
0.02
0.00
0.00
Workspace Only
(0301010309)
W-A18-149: PSS
32.2
Cascade Creek -Dan River
36.474593
-79.698263
PSS
51.49
0.07
0.00
0.00
Open -cut
(0301010309)
W-A18-149: PEM
32.2
Cascade Creek -Dan River
36.474621
-79.698334
PEM
52.96
0.16
0.00
0.00
Open -cut
(0301010309)
W-A18-152: PEM
32.6
Cascade Creek -Dan River
36.4698
-79.702487
PEM
21.14
0.06
0.00
0.00
Open -cut
(0301010309)
W-A18-152: PFO
32.6
Cascade Creek -Dan River
36.46964
-79.702513
PFO
29.40
0.03
0.02
0.00
Open -cut
(0301010309)
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Pipeline Crossing
Permanent Fill
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
Method or Other
(acres) f/
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
Impact Type g/
W-A18-155: PEM
33.1
Cascade Creek -Dan River
36.464024
-79.702911
PEM
0.00
0.06
0.00
0.00
Workspace Only
(0301010309)
W-A18-155: PSS
33.1
Cascade Creek -Dan River
36.463768
-79.702847
PSS
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-155-2: PSS
33.1
Cascade Creek -Dan River
36.463484
-79.702655
PSS
68.48
0.16
0.00
0.00
Open -cut
(0301010309)
W-A18-222: PFO
33.4
Cascade Creek -Dan River
36.459381
-79.700236
PFO
42.61
0.08
0.03
0.00
Open -cut
(0301010309)
W-A18-222: PEM
33.4
Cascade Creek -Dan River
36.459274
-79.700288
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-224: PFO
33.7
Cascade Creek -Dan River
36.455977
-79.697766
PFO
10.58
0.02
0.01
0.00
Open -cut
(0301010309)
W-A18-224: PEM
33.7
Cascade Creek -Dan River
36.455931
-79.697819
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-C18-40: PEM
34.6
Cascade Creek -Dan River
36.445616
-79.689527
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-95: PEM
37
Cascade Creek -Dan River
36.425012
-79.657628
PEM
7.55
0.02
0.00
0.00
Open -cut
(0301010309)
W-A18-98: PFO
37.2
Cascade Creek -Dan River
36.423306
-79.65623
PFO
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-S18-1: PFO
37.3
Cascade Creek -Dan River
36.422114
-79.655108
PFO
8.34
0.01
0.01
0.00
Open -cut
(0301010309)
W-A18-6: PFO
38.5
Cascade Creek -Dan River
36.407396
-79.649469
PFO
129.65
0.15
0.08
0.00
Open -cut
(0301010309)
W-A18-6-2: PFO
38.5
Cascade Creek -Dan River
36.407067
-79.649165
PFO
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-6-3: PFO
38.5
Cascade Creek -Dan River
36.406781
-79.648669
PFO
91.73
0.09
0.06
0.00
Open -cut
(0301010309)
W-A18-6: PEM
38.5
Cascade Creek -Dan River
36.406695
-79.648415
PEM
45.87
0.09
0.00
0.00
Open -cut
(0301010309)
W-A18-7: PFO
38.6
Cascade Creek -Dan River
36.405557
-79.648122
PFO
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-7: PEM
38.6
Cascade Creek -Dan River
36.40538
-79.648206
PEM
75.79
0.18
0.00
0.00
Open -cut
(0301010309)
W-A18-7: PSS
38.6
Cascade Creek -Dan River
36.40525
-79.648097
PSS
33.74
0.08
0.00
0.00
Open -cut
(0301010309)
W-A18-7-2: PEM
38.6
Cascade Creek -Dan River
36.405113
-79.648149
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-A18-7-3: PEM
38.7
Cascade Creek -Dan River
36.404994
-79.647869
PEM
16.28
0.05
0.00
0.00
Open -cut
(0301010309)
W-A18-7-4: PEM
38.7
Cascade Creek -Dan River
36.404784
-79.647599
PEM
28.70
0.07
0.00
0.00
Open -cut
(0301010309)
W-A18-7-5: PEM
38.7
Cascade Creek -Dan River
36.404414
-79.647238
PEM
16.09
0.04
0.00
0.00
Open -cut
(0301010309)
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Pipeline Crossing
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
Permanent Fill
Method or Other
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
(acres) f/
Impact Type g/
W-A19-270: PFO
38.8
Cascade Creek -Dan River
36.40362
-79.646599
PFO
0.00
0.02
<0.01
0.00
Workspace Only
(0301010309)
W-1318-78:PFO
39.7
Cascade Creek -Dan River
36.39375
-79.638317
PFO
55.99
0.06
0.03
0.00
Open -cut
(0301010309)
W-1318-112: PEM
40.1
Hogans Creek -Dan River
36.387125
-79.636599
PEM
0.00
0.01
0.00
0.00
Workspace Only
(0301010401)
W-B18-110: PFO
40.2
Hogans Creek -Dan River
36.386777
-79.63634
PFO
0.00
0.02
0.01
0.00
Workspace Only
(0301010401)
W-1318-55: PEM
41.1
Hogans Creek -Dan River
36.378086
-79.625234
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010401)
W-1318-55: PFO
41.1
Hogans Creek -Dan River
36.377936
-79.625312
PFO
83.65
0.13
0.06
0.00
Open -cut
(0301010401)
W-1318-46: PFO
41.7
Hogans Creek -Dan River
36.371464
-79.620671
PFO
5.85
0.02
0.01
0.00
Open -cut
(0301010401)
W-A19-346: PEM
46.1 RR
Hogans Creek -Dan River
36.317702
-79.590634
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010401)
W-A19-343: PFO
46.2 RR
Hogans Creek -Dan River
36.315587
-79.589423
PFO
0.00
0.02
<0.01
0.00
Workspace Only
(0301010401)
W-C18-77: PFO
47
Hogans Creek -Dan River
36.305304
-79.587735
PFO
46.56
0.08
0.03
0.00
Open -cut
(0301010401)
W-618-139: PFO
48.5
Headwaters Haw River (0303000202)
36.290957
-79.572486
PFO
24.40
0.03
0.02
0.00
Open -cut
W-A18-62: PSS
48.6
Headwaters Haw River (0303000202)
36.288909
-79.571666
PSS
39.55
0.11
0.00
0.00
Open -cut
W-A18-62-2: PSS
48.6
Headwaters Haw River (0303000202)
36.288605
-79.571621
PSS
0.00
<0.01
0.00
0.00
Workspace Only
W-A18-61: PEM
48.7
Headwaters Haw River (0303000202)
36.288426
-79.571447
PEM
0.00
0.01
0.00
0.00
Open -cut
W-A18-184: PEM
49.9 RR
Headwaters Haw River (0303000202)
36.275102
-79.558969
PEM
0.00
0.01
0.00
0.00
Workspace Only
W-A18-184-2: PEM
49.9 RR
Headwaters Haw River (0303000202)
36.274963
-79.55886
PEM
0.00
0.01
0.00
0.00
Workspace Only
W-A18-184: PFO
49.9 RR
Headwaters Haw River (0303000202)
36.274868
-79.558919
PFO
38.65
0.06
0.03
0.00
Open -cut
W-A19-284: PSS
51.2 RR
Headwaters Haw River (0303000202)
36.258208
-79.546653
PSS
0.00
0.01
0.00
0.00
Workspace Only
W-C18-20: PFO
51.4 RR
Headwaters Haw River (0303000202)
36.256726
-79.545781
PFO
18.85
0.02
0.01
0.00
Open -cut
W-C18-20-2: PFO
51.4 RR
Headwaters Haw River (0303000202)
36.256503
-79.545528
PFO
134.95
0.21
0.09
0.00
Open -cut
W-C18-20: PEM
51.4 RR
Headwaters Haw River (0303000202)
36.256465
-79.545349
PEM
0.00
<0.01
0.00
0.00
Workspace Only
Total (Pipeline, Rockingham County)
4,326
9.48
1.47
0.00
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Pipeline Crossing
Length
(feet) c/
Wetland within
Construction
Workspace (acres) d/
Permanent
Conversion PFO to
PSS/PEM (acres) e/
Permanent Fill
(acres) f/
Pipeline Crossing
Method or Other
Impact Type g/
Pipeline (Alamance County)
W-A18-83: PEM
53.3
Headwaters Haw River (0303000202)
36.23401
-79.529142
PEM
26.09
0.06
0.00
0.00
Open -cut
W-A18-85: PEM
53.6
Headwaters Haw River (0303000202)
36.230085
-79.527424
PEM
8.98
0.03
0.00
0.00
Open -cut
W-A18-85: PSS
53.7
Headwaters Haw River (0303000202)
36.230004
-79.527419
PSS
0.00
0.04
0.00
0.00
Workspace Only
W-A18-85-2: PEM
53.7
Headwaters Haw River (0303000202)
36.229981
-79.52711
PEM
0.00
<0.01
0.00
0.00
Workspace Only
W-C18-67: PFO
54.3
Headwaters Haw River (0303000202)
36.221387
-79.521613
PFO
102.88
0.26
0.07
0.00
Open -cut
W-B18-60: PSS
55.6 RR
Headwaters Haw River (0303000202)
36.208058
-79.515066
PSS
0.00
0.02
0.00
0.00
Workspace Only
W-B18-60-2: PSS
55.6 RR
Headwaters Haw River (0303000202)
36.208177
-79.51515
PSS
0.00
0.01
0.00
0.00
Workspace Only
W-B18-61: PEM
55.5
Headwaters Haw River (0303000202)
36.20826
-79.512175
PEM
39.07
0.06
0.00
0.00
Open -cut
W-A18-119: PFO
56.4 RR
Back Creek -Haw River (0303000204)
36.199435
-79.500719
PFO
90.25
0.12
0.06
0.00
Open -cut
W-A18-119: PEM
56.4 RR
Back Creek -Haw River (0303000204)
36.199389
-79.500841
PEM
0.00
0.02
0.00
0.00
Workspace Only
W-A18-119-2: PFO
56.5
Back Creek -Haw River (0303000204)
36.198472
-79.499618
PFO
62.93
0.09
0.05
0.00
Open -cut
W-A18-119-2: PEM
56.5
Back Creek -Haw River (0303000204)
36.198466
-79.499761
PEM
0.00
0.02
0.00
0.00
Workspace Only
W-A18-119-3: PFO
56.6 RR
Back Creek -Haw River (0303000204)
36.1983
-79.499033
PFO
0.00
0.01
0.00
0.00
Workspace Only
W-A18-119-4: PFO
56.6 RR
Back Creek -Haw River (0303000204)
36.198148
-79.498683
PFO
76.83
0.16
0.06
0.00
Open -cut
W-A18-127: PFO
56.6 RR
Back Creek -Haw River (0303000204)
36.19736
-79.497888
PFO
127.85
0.14
0.07
0.00
Open -cut
W-A18-127-2: PFO
56.7 RR
Back Creek -Haw River (0303000204)
36.196794
-79.497815
PFO
0.00
0.02
0.00
0.00
Workspace Only
W-A18-130: PEM
56.8
Back Creek -Haw River (0303000204)
36.19409
-79.497683
PEM
0.00
0.01
0.00
0.00
Workspace Only
W-A18-130: PFO
56.9
Back Creek -Haw River (0303000204)
36.193874
-79.497418
PFO
17.04
0.09
0.03
0.00
Open -cut
W-A18-133: PFO
57.1
Back Creek -Haw River (0303000204)
36.191046
-79.496608
PFO
56.05
0.1
0.04
0.00
Open -cut
W-A18-133: PEM
57.1
Back Creek -Haw River (0303000204)
36.190868
-79.496659
PEM
0.00
0.02
0.00
0.00
Workspace Only
W-A18-133-2: PEM
57.1
Back Creek -Haw River (0303000204)
36.190481
-79.49655
PEM
0.00
0.01
0.00
0.00
Workspace Only
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Pipeline Crossing
Length
(feet) c/
Wetland within
Construction
Workspace (acres) d/
Permanent
Conversion PFO to
PSS/PEM (acres) e/
Permanent Fill
(acres) f/
Pipeline Crossing
Method or Other
Impact Type g/
W-A18-135: PFO
57.2
Back Creek -Haw River (0303000204)
36.189488
-79.496096
PFO
145.79
0.2
0.1
0.00
Open -cut
W-A18-135: PEM
57.2
Back Creek -Haw River (0303000204)
36.189625
-79.49626
PEM
0.00
0.02
0.00
0.00
Workspace Only
W-A18-254: PFO
57.6
Back Creek -Haw River (0303000204)
36.184749
-79.493161
PFO
151.62
0.22
0.1
0.00
Open -cut
W-C18-3: PEM
57.8
Back Creek -Haw River (0303000204)
36.181163
-79.494328
PEM
13.05
0.04
0.00
0.00
Open -cut
W-C18-3: PFO
57.9
Back Creek -Haw River (0303000204)
36.181041
-79.494472
PFO
0.00
0.00
0.00
0.00
Workspace Only
W-C18-3-2: PEM
57.9
Back Creek -Haw River (0303000204)
36.180874
-79.494341
PEM
12.60
0.02
0.00
0.00
Open -cut
W-C18-3-2: PFO
57.9
Back Creek -Haw River (0303000204)
36.180844
-79.494345
PFO
7.57
0.01
0.01
0.00
Open -cut
W-C18-5: PSS
58
Back Creek -Haw River (0303000204)
36.178724
-79.493947
PSS
52.16
0.07
0.00
0.00
Open -cut
W-C18-5: PEM
58
Back Creek -Haw River (0303000204)
36.178665
-79.494059
PEM
0.00
0.03
0.00
0.00
Workspace Only
W-C18-29: PFO
60.7
Back Creek -Haw River (0303000204)
36.160851
-79.454748
PFO
116.09
0.2
0.07
0.00
Open -cut
W-C18-29-2: PFO
60.8 RR
Back Creek -Haw River (0303000204)
36.160867
-79.453482
PFO
33.04
0.07
0.02
0.00
Open -cut
W-A18-79: PFO
61.8
Back Creek -Haw River (0303000204)
36.156382
-79.439241
PFO
0.00
<0.01
0.00
0.00
Workspace Only
W-A18-74: PFO
62.5
Back Creek -Haw River (0303000204)
36.149929
-79.429316
PFO
8.41
0.01
0.01
0.00
Open -cut
W-A18-80: PEM
62.7
Back Creek -Haw River (0303000204)
36.149688
-79.426785
PEM
63.68
0.09
0.00
0.00
Open -cut
W-B18-32: PEM
62.9
Back Creek -Haw River (0303000204)
36.148216
-79.423966
PEM
0.00
<0.01
0.00
0.00
Workspace Only
W-A19-348: PFO
63.0 RR
Back Creek -Haw River (0303000204)
36.14714
-79.422778
PFO
23.94
0.02
0.02
0.00
Open -cut
W-B18-19: PFO
63.8
Back Creek -Haw River (0303000204)
36.146434
-79.407119
PFO
62.96
0.11
0.04
0.00
Open -cut
W-A19-332: PFO
64.1 RR
Back Creek -Haw River (0303000204)
36.146801
-79.40349
PFO
49.35
0.08
0.02
0.00
Conventional Bore
W-A19-320: PEM
65.0 RR
Back Creek -Haw River (0303000204)
36.146237
-79.386954
PEM
69.27
0.1
0.00
0.00
Open -cut
W-A19-326: PFO
65.2 RR
Back Creek -Haw River (0303000204)
36.145383
-79.384036
PFO
5.51
0.02
0.01
0.00
Open -cut
W-B19-168: PEM
65.6
Back Creek -Haw River (0303000204)
36.139686
-79.381343
PEM
0.00
0.05
0.00
0.00
Workspace Only
W-A19-352: PFO
66.5 RR
Back Creek -Haw River (0303000204)
36.132426
-79.370474
PFO
0.00
<0.01
0.00
0.00
Workspace Only
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Pipeline Crossing
Permanent Fill
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
Method or Other
(acres) f/
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
Impact Type g/
AW-A19-352: PFO
66.5 RR
Back Creek -Haw River (0303000204)
36.1323
-79.370487
PFO
0.00
0.04
0.00
0.00
Workspace Only
W-B19-164: PFO
66.6 RR
Back Creek -Haw River (0303000204)
36.13071
-79.369903
PFO
34.42
0.04
0.02
0.00
Open -cut
W-B18-5: PFO
68.4
Back Creek -Haw River (0303000204)
36.106095
-79.371151
PFO
15.68
0.02
0.01
0.00
Open -cut
W-A18-67: PFO
71.8
Back Creek -Haw River (0303000204)
36.062807
-79.361499
PFO
0.00
<0.01
0.00
0.00
Workspace Only
W-A18-67-2: PFO
71.8
Back Creek -Haw River (0303000204)
36.062821
-79.361357
PFO
43.87
0.04
0.03
0.00
Open -cut
W-A18-208: PEM
72.2
Back Creek -Haw River (0303000204)
36.056285
-79.364482
PEM
0.00
<0.01
0.00
0.00
Workspace Only
W-B19-151: PEM
72.9 RR
Back Creek -Haw River (0303000204)
36.046891
-79.366585
PEM
257.59
0.56
0.00
0.00
Open -cut
W-A18-111: PEM
73.0 RR
Back Creek -Haw River (0303000204)
36.046117
-79.365977
PEM
0.00
0.04
0.00
0.00
Workspace Only
W-B19-151-2:PEM
73.0 RR
Back Creek -Haw River (0303000204)
36.046408
-79.366515
PEM
45.02
0.04
0.00
0.00
Open -cut
Total (Pipeline, Alamance County)
1,820
3.43
0.84
0.00
T-15 Dan River Interconnect (Rockingham County)
W-B18-36-7: PEM
30.3
Cascade Creek -Dan River
36.495345
-79.680028
PEM
0.00
0.47
0.00
0.00
Workspace Only
(0301010309)
AW-B18-36: PEM
30.3
Cascade Creek -Dan River
36.495217
-79.679527
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-B18-36-8: PEM
30.3
Cascade Creek -Dan River
36.495739
-79.680659
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
W-B18-36-9: PEM
30.4
Cascade Creek -Dan River
36.494389
-79.679702
PEM
0.00
0.05
0.00
0.00
Workspace Only
(0301010309)
W-B18-36-10: PEM
30.4
Cascade Creek -Dan River
36.494208
-79.679948
PEM
0.00
0.01
0.00
0.00
Workspace Only
(0301010309)
W-B18-36-11: PEM
30.4
Cascade Creek -Dan River
36.494116
-79.679626
PEM
0.00
<0.01
0.00
0.00
Workspace Only
(0301010309)
Temporary Access Road: TA-RO-075 (Rockingham County)
W-A18-39-2: PEM
28.1 RR
Cascade Creek -Dan River
36.519849
-79.654743
PEM
0.00
<0.01
0.00
0.00
Workspace Only
0301010309
W-A18-39-3: PEM
27.9 RR
Cascade Creek -Dan River
36.522214
-79.654436
PEM
0.00
0.01
0.00
0.00
Workspace Only
0301010309
Temporary Access Road: TA-RO-083 (Rockingham County)
W-B18-34-4: PFO
30.4
Cascade Creek -Dan River
36.493193
-79.678846
PFO
0.00
0.04
0.00
0.00
Workspace Only
0301010309
W-B18-36-5: PFO
30.4
Cascade Creek -Dan River
36.49321
-79.678707
PFO
0.00
<0.01
0.00
0.00
Workspace Only
0301010309
Temporary Access Road PA-RO-113A (Rockingham County)
W-B18-43: PEM
41.8
Hogans Creek -Dan River
36.369695
79.619871
PEM
0.00
<0.01
0.00
0.00
Workspace Only
0301010401
Appendix L-1
Proposed Wetland Impacts by ID and Type of Impact
Pipeline Crossing
Wetland within
Permanent
Permanent Fill
Pipeline Crossing
Impact ID a/
Milepost
Watershed HUC 10
Latitude
Longitude
Wetland Type b/
Length
Construction
Conversion PFO to
(acres) f/
Method or Other
(feet) c/
Workspace (acres) d/
PSS/PEM (acres) e/
Impact Type g/
W-1318-43-2: PEM
41.8
Hogans Creek -Dan River
36.369681
-79.619794
PEM
0.00
0.01
0.00
0.00
Workspace Only
0301010401
Permanent Access Road PA-RO-000 (Rockingham County)
W-A19-280: PEM
28.7
Cascade Creek -Dan River
0301010309
36.519196
-79.669802
PEM
0.00
0.00
0.00
0.00
Using existing gravel road
W-A19-280-2: PEM
28.7
Cascade Creek -Dan River
0301010309
36.519109
-79.670171
PEM
0.00
0.00
0.00
0.00
Using existing gravel road
Project Total
6,145.33
13.5
2.31
0.00
a/ Data are based on wetland Feld delineations completed through May, 2019 where access has been obtained, National Wetland Inventory (NWI) data, and desktop analysis of approximated resources. Wetland lDs starting with "W" have been field delineated and wetland ID starting with "AW" are approximated based on NWI data,
desktop analysis, and field scientists knowledge of the surrounding area/adjacent properties (where accessible).
b/ Wetland type based on Cowardin Classifications PEM = palustrine emergent wetland, PSS = palustrine scrub shrub wetland, PFO = palustrine forested wetland; all wetlands are jurisdictional under Section 404 and Class WL (15A NCAC 02B.0101(c)(8))".
c/ Crossing length is measured at the intersection of the wetland and centerline of the pipeline. Crossing length of "0" indicates the wetland is not crossed by the centerline of the pipeline but is located within the construction workspace.
d/ Wetlands crossed by HDD or conventional bore have a "0" for construction workspace.
e/ Conversion of PFO (forested wetland) to PSS/PEM (non -forested wetland) is based on a 30-foot-wide woody vegetation maintenance corridor centered over the pipeline.
f/ permanent fill limited to permanent access roads only.
g/ Construction crossing method will ultimately be determined by field supervisor based on field conditions observed during construction. "Workspace Only" indicates that the wetland is not crossed by the pipeline but is located within construction workspace.