Loading...
HomeMy WebLinkAboutNC0039586_NOV-2019-LV-0738 NOI_20191030T ROY COOPER Gin crywr MICHAEL S_ REGAN Sc,terars LINDA CULPEPPER D1t I-( ro- Certified Mail # 7017 0190 0000 9562 7268 R turn Receipt Requested Paul Draovitch, Senior VP Duke Energy Progress LLC 526 S Church St - Ec3xp Charlotte, NC 28202 NOR i P CAROLINA Environmental Quality October 30, 2019 SUBJECT: NOTICE OF VIOLATION & INTENT TO ASSESS CIVIL PENALTY Tracking Number: NOV-2019-LV-0738 Permit No. NCO039586 Shearon Harris Nuclear Power Plant Wake County Dear Permittee: A review of the August 2019 Discharge Monitoring Report (DMR) for the subject facility revealed the violation(s) indicated below: Limit Exceedance Violation(s): Sample Limit Reported Location Parameter Date Value Value Type of Violation 005 Effluent Oil & Grease (00556) 8110/2019 20 l 25.8 Daily Maximum Exceeded 005 Effluent Oil & Grease (00556) 8/31/2019 15 25.8 Monthly Average Exceeded A Notice of Violation/Intent to Issue Civil Penalty is being issued For the noted violations of North Carolina General Statute (G.S.) 143-215.1 and the facility's NPDES WW Permit. Pursuant to G.S. 143-215.6A, a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of any permit issued pursuant to G.S. 143-215.1. If you wish to provide additional information regarding the noted violations, request technical assistance, or discuss overall compliance please respond in writing within ten 10 business days after receipt of this Notice. A review of your response will be considered along with any information provided on the submitted Monitoring Report(s). You will then be notified of any civil penalties that may be assessed regarding the violations. If no response is received in this Office within the 10-day period, a civil penalty assessment may be prepared. Remedial actions should have already been taken to correct this problem and prevent further occurrences in the future. The Division of Water Resources may pursue enforcement action for this and any additional violations of State law. If the violations are of a continuing nature, not related to operation and/or maintenance problems, and you anticipate remedial construction activities, then you may wish to consider applying for a Special Order by Consent. Reminder: Pursuant to Permit Condition 6 in Section E, the Permittee is required to verbally notify the Regional Office as soon as possible, not to exceed 24 hours, from first knowledge of any non-compliance at the facility including limit violations, bypasses of, or failure of a treatment unit. A written report may be required within 5 days if directed by Division staff. Prior notice should be given for anticipated or potential problems due to planned maintenance activities, taking units off-line, etc. If you have any questions concerning this matter or to apply for an SOC, please contact Vanessa Manuel of the Raleigh Regional Office at 919-791-4255. Sincerely, S. ]ay Zimmerman, P.G., Chief Water Quality Regional Operations Section Division of Water Resources, NCDEQ Cc: WQS Raleigh Regional Office - Enforcement File Laserfiche z� D E 1111��Nl