Loading...
HomeMy WebLinkAbout20191469 Ver 1_Lewisville MS Plans_20191025\^,/I S \/ILLE /lt**44S C:>t**4mSALEM M I [:D 1:3LE SCHOOL FC:>RS1qNrTH COUNTY SCHOOLS '1'I'IS LEWISVILLE- VIENNA LEWISVILLE� 1*,%44= 27023 Fz' E>_ CLH DESIGN PROJECT 1***4 LJ t***A 13 E F,": '77-'7'16 N/ICI N ITY MAP d W O CD 0 0 0 U F- W W 2 F- O J n 0 U M N 60 IL } _ 4"7, SCALE.• 1'=400' C>VVNER 8& DESIGNER INFORMATION LAND OWNER: WINSTON-SALEM FORSYTH COUNTY SCHOOLS OWNER CONTACT- COLON MOORE 475 CORPORATE SQUARE DRIVE WINSTOM-SALEM, NC 27105 DESIGNER: CLH DESIGN, PA DESIGNER CONTACT- RENEE PFEIFER, PLA, ASLA 400 REGENCY FOREST DR., SUIT 120 CARY, NC 27518 PHONE,• 919-319-6716 FAX.• 919-319-7516 1 N DEX OF DRAWINGS CO0.00 COVER SHEET CO1.00 SITE OVERALL PLAN C01.01 SITE STAKING PLAN AREA 1 CO 1.02 SITE STAKING PLAN AREA 2 C01.03 SITE STAKING PLAN AREA 3 CO1.04 SITE STAKING PLAN AREA 4 & AREA 5 CO2.07 EXISTING CONDITIONS AND DEMOLITION PLAN AREA 1 CO2.02 EXISTING CONDITIONS AND DEMOLITION PLAN AREA 2 CO2.03 EXISTING CONDITIONS AND DEMOLITION PLAN AREA 3 CO2.04 EXISTING CONDITIONS AND DEMOLITION PLAN AREA 4 & AREA 5 CO3.01 SITE GRADING PLAN AREA 1 CO3.02 SITE GRADING PLAN AREA 2 CO3.03 SITE GRADING PLAN AREA 3 CO3.04 SITE GRADING PLAN AREA 4 & AREA 5 C04.07 SITE EROSION CONTROL PLAN AREA i C04.02 SITE EROSION CONTROL PLAN AREA 2 C04.03 SITE EROSION CONTROL PLAN AREA 3 C04.04 SITE EROSION CONTROL PLAN AREA 4 & AREA 5 C04.05 SITE EROSION CONTROL PLAN AREA i C04.06 SITE EROSION CONTROL PLAN AREA 2 C04.07 SITE EROSION CONTROL PLAN AREA 3 C04.08 SITE EROSION CONTROL PLAN AREA 4 & AREA 5 C05.01 SITE UTILITY PLAN AREA 1 C05.02 SITE UTILITY PLAN AREA 2 C05.03 SITE UTILITY PLAN AREA 3 C05.04 SITE UTILITY PLAN AREA 4 & AREA 5 C06.01 SITE PLANTING PLAN AREA 1 C06.02 SITE PLANTING PLAN AREA 2 C06.03 SITE PLANTING PLAN AREA 3 C06.04 SITE PLANTING PLAN AREA 4 & AREA 5 C07.01 SITE DETAILS C07.02 SITE DETAILS C07.03 SITE DETAILS C07.04 SITE DETAILS C07.05 SITE DETAILS C07.06 SITE DETAILS C07.07 SITE DETAILS C07.08 SITE DETAILS Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP Seal: CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 ''`t�►fllllllll�, •� 4 4 ff. z' * ! -7 1566: r�r+� C. P cps►' +I+�Illlifl'1�� � ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: COVER NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C00000 0 Q ry LLI 0 0 0 U U H w w U O J n 0 U 0 0 0 U) m 70 0 0 c 0 ry (0 r U 0 A 0 N Lu > E �p U� Q o a) M E� �0 N CT a) C C6 N � U) ENTRANCE AND EXIT ' FOR BUSES, STAFF AND SERVICE. F�\i 7 PIN 5886-75-0975 NOW OR FORMERLY TAX BLOCK 4615 PIN 5866-66-9107 WINSTON-SALEAI/ ORSYTH CO. BOARD OF EDUCATION AREA 4 NOW OR FORMERLY ` DEED BOOK 2963, PAGE 2150 I TAX BLOCK 4615 ROBERT M. MCBRIDE RO ` PIN 5886-65-9976 �DMCBRIDE NOW OR FORMERLY DEED BOOK 1270, PA TAX BLOCK 4615 1166 Q \ 1 I WINSTON-SALEA11YORSYTH CO. BOARD OF EDUCATION SITE DATA PRO,ECT LEWISWLLE MIDDLE SCHOOL OWNER: WINSTON-SALEA41PORSYTH COUNTY SCHOOLS OWNER CONTACT COLON MOORE 475 CORPORATE SQUARE DRIVE WINSTON-SALSK NC 27105 OMCE. 336-727-2533 EXT. 34916 DESIGNER: CLH DESIGN, PA DESIGNER CONTACT RENEE C. PFEIFER, PLA 400 REGENCY FOREST DRIVE, SUITE 120 CARY, NC 27518 PHONE. 919-319-6716 FAX: 919-319-7516 PRO,ECT ADDRESS: 1115 LEWISWLLE-WENNA ROAD LEWISWLLE, NC PLANNING JURISD. TOWN OF LEWISWLLE PIN. 5866-75-4031.00, 5666-75-1433 00, 5666-54-9930.00 5866-75-3433 00, 5666-75-4443.00, 5866-54-2433.00 ZONING: RS-9 EXISTING USE. VACANT & SINGE FAMILY RESIDENTIAL PROPOSED USE: MIDDLE SCHOOL SITE ACREAGE: 70.51 ACRES + 3.26 ACRES + 1.35 ACRES + 1.35 ACRES + 1.35 ACRES + 1.35 ACRES = 79.17 ACRES (3, 448, 645.2 SF) DISTURBED AREA: 29.74 ACRES APPROXIMATE X BUILDING COVERAGE: 1.907.(65, 760.7 SF) APPROXIMATE X IMPERVIOUS COVERAGE. 10.9% (376,060.6 SF) APPROXIMATE X OPEN SPACE. 87.29 (3, 008,113.8 SF) ACTIVE RECREATIONAL OPEN SPACE: 3.28 ACRES (142,922 SF) REQUIRED SETBACKS- FRONT/STREET SETBACK: 20' SIDE SETBACK: 7' REAR SETBACK: 25' MAXIMUM BUILDING HEIGHT 51'4" DEED BOOK 2963, PAGE 2150 I o� - - - - - - - - - - - - - - O/01 � my PIN 5886-75-3903 PIN &06-65-7947 I - - - NOW OR FORMERLY I ` NOW OR FORMERLY TAX BLOCK MI5 TAX BLOCK M15 =� - — - _ ROBERT M. MCBRIDE WINSTON SALEM/�ORSYTH COUNTY BOARD OF AND WIFE ALYCE MCBRIDE I / EDUCATION DEED BOOK 3065, PAGE 3234- DEED BOOK 1131, PAGE 1431 'I WET AND-7 - - ------ I ' E3p, wN OFOF IESVSII / 0 • '` _ _ �d AREA 3 _ - -- ---- I m -- -- I � y � � AREA BUFFER � i I `'.� •• \ � "' 30 ST • �* �� - � \ • \ \ I \ / / zc+ � i I \ � \ \ \ ` I I �• kt500 YEAR FLOODWAY I I �100 YEAR FLOODWAY I y 1 7' S1DE�ETBACK / \ I ` \ \ �• \ ' . �, PIN 5886-85-6606 / x \ \ I I NOW OR FORMERLY — \ \ �1\ ��• \ TAX BLOCK 4618B x \ �� \ \ \ I I MARK 0. BROWN AND WIFE PIN 5886-65-6517T-C / + `\ \\ I \ \ \ a KIMBERLY A. BROWN NOW OR FORMERLYDEED BOOK 2334PAGE J9,\ \ • ' ' \ \ ` II CUTTERS CREEK, SECTION 31 I TAX BLOCK M61 to / \ \ \ ` , \ �� • \ \ l PLAT BOOK 44, PAGE 146 DIANE W. BLACKBURN AND DEBRA MACKIE DEED BOOK 1693, PAGE 3509LOT 11 i \ , �� •• •. • \ \ `? THE WAGONER PLACE PLAT BOOK 21, PAGE 60 I / / / 1 GRAVELDUSTTRAC / AND FOOTBALL FIE D SCM 1 / \ 1 WET POND --- PIN x J 50 DUKE POWER CO. PI 5686-75-3443 RIGHT-OF-WAY 6 7 2433 NOW OR pl DEED BOOK 1691 PAGE171 0 I \ I \ / NOW 5686-7 - - - -(LOT 698, BLOCK 4615 - % � I I I • - _ , , OR Y TAX BLOCK4615NOW - - - - - - - - - - \�\ - - - - - - - - - _ ` PIN 5686-85-7258 T BLOC 4615 FORM LY i // \ \ \t\a RICHARD E. � ✓✓✓---------- ANN YATES YATES TAX BL 461 I __`,J�/NOW OR FORMERLY 7U AND WIFE JANE BURRA I ' \ • DAVID R. SM TAX BLOCK �r i �� SETBACK PIN 5666-75-1433 x B 1543, L B DEED B 96 x I PIN 5886-85-2513 ` DEED BOOK 2613, PAGE 1836 I//NOW AL FORMERLY 1372 I a� \AGE PA 5 NOW OR FORMERLY1 / TAX BLOCK 4615 A 1.35 A ES I� TAX BLOCK 4618 r^ 1 PLAT PAGE 146, SECRON 3 PIN 5686-65-3294 I / PAGE 1362 ._"�c I I WINSTON-SALEM ORSYIH CO. I �o� FRANK T. BAILEY, JR. NOW OR FORMERLY II 1.35 ACRES ��' ` 1 ELW�OOD HUDSPEIH BOARD OF EDUCATION x I a3^m AND - TAX BLOCK 4661 I Q DEED BOOK 2970, PAGE 4493 I i EUNILEE L BAILEY \ \ LOT 8 1.35 ACRES 4 x IY�m� REVOCABLE LIVING TRUST - x x x F ��o DEED BOOK 2393, PAGE 716 500 YEAR FLOODWAY �• % THE WAGONER PLACE PLAT BOOK 21, PAGE 60 / l l BUS Loop ia�c` 100 YEAR FLOODWAY��• L _10Z I <- •---� aaaaa� ��� aaaaa� n T -~ M .. ........ lI PIN 5886-55-6037 + I AREA Z AREA 1 II � MATTHEW T FOLEY L - - - J �F A ` I it X PIN 5886-55-9027 PIN 5886-65-2038 I T 9 0- ~ r I r- ` \ - - _ M.B. WADE NOW OR FORMERLY I SQpCEs A / ` I• TAX BLOCK 4613 I �. ZNG I I PIN OR R 0050 PROPERTIES LLC � �Q� QpRK � / � . J � ` NOW OR FORMERLY MINNIE SHABAZZ c 29 TAX BLOCK 4619 DEED BOOK 2435, PAGE 3015 ti� G SQppES / / J GUALBERTO d DETAPAZ AND WIFE ENTRANCE AND - -- �J — — Li �O� SQpRKtN PERRY ANN SHERIDAN J — — — — — �, — NEW MIDDLE SCHOOL BUILDING j g9U I / /� �• ` DEED BOOK 1977, PAGE 685 EXIT FOR — -- — — — —y1 / r 1 / / / PARENTS AND 7' SIDE SETBACK I ©❑ S�ppP A STAFF PARENT LOOP PRIVATE DRIVE- 3 100 LF OF DOUBLE STACKING .0. PARENT 8V MAIN WARY / / / �I y �lijsj; ENTRY SERVICE / / / / II 500 YEAR FLOODWAY j 01p /MECHANICAL YARD / FFER `MONUMENT SIGN s / _ I oREpM o -10 STREETYARD '0 �► gcFs / / /W- 1-13 PIN 5886-84-7691 o i 7' SIDE SETBACK— - - 7' SIDE SETBACK— - - �► / / / / ' — I — �`- jp;NNpFv I NOW OR FORMERLY TAX BLOCK 4619 DROP -OFF AREA / I RICHARD FULLER WAGNER, JR AND I J i PIN 5886-54-9735 I PM��EF� / / I W� AREA 5 I SHIRLEY ENGLAND WAGNER WNOW OR 1AX BLOCK 4613Y I / / / / I DEED BOOK 1481, PAGE 984 J i STEPH N J. THATCHER AND WIFE 53 STAFF PARKING SPACES IS 7HAT0qER DEED BOOK 1517, PAGE 176 7' SIDE SETBACK I / I PIN 5886-64-1527 PIN NOW OR FORMERLYI PIN W86-54-5570 W86-54-7503 PIN PIN TAX BLOCK 4613 NOW OR FORMERLY NOW OR 5886-54-8505 WN-54-9505 STEPHEN ALLEN T FORMERLY NOW OR NOW OR PIN 1EBOO � ALLEN I I I I TAX BLOCK 4613 FORMERLY FORMERLY 5886 64-0505 DEED BOOK 333� PAGE � ,' PIN I I DAVID W. FULLER TAX BLOCK 4613 NOW OR 3406 I 5886-64-3407 I DEED BOOK 3159, PAGE 1534 INWAM EUGENE I TAX BLOCK 4613 I TAX BLOCK 4613 I FORMERLY ay DULL WIWAM R MAINES WIWAM J TAX BLOCK 4613 DEED BOOK 1182, DEBRA MAINES HAYDEN • DEED BOOK 1515, DEED BOOK 1450, GEOR � uWAM 25 REAR SEI25 REAR SETBACK PAGE 1697 PAGE 1459 46IJ t — ��gn � I PAGE 116 - - I _ _�- , , r - - LOUIE E DULL, --------�-1---------------- - - - -------------- ° PIN 5886-64-4390 ------------------------------------ASHMOVTFORESTCOURT ---------------------------------------------- ------ DEXTER DRIVE ---- - ------------------- - -----------1----------- v�-------------------------------- DEED --_ !----------- -x5 x - - - - - - - - - 1182, GE NOW OR FORMERLY TAX BLOCK 4614--------------------------------- ----- ------------------------------------------------------ NOW OR FORMERL PIN 5866-64-0259 1703 � ` PIN 5886-N-2295 WA MR HAROLD ROYALL AND WIFE NOW OR TAX BLOCK 4614 NOW OR FORMERLY PATRICIA ROYAL LY HAL D. MESSICK TAX BLOCK 4614 ' TAX BLOCK 4614A DEED BOOK 1680, PAGE 3520 LAURA D. COOPER DEED BOOK 2361, PA 2505 JAMES M. LESLIE _ _ _ MICHAEL G. COOPER AND WIFE - = PLAT60W 62; 795 DEE76DOK TIa9; PAGE 33� DEED BOOK 1989, PAGE 3210 PIN 5886-64-6422 NOW OR FORMERLY TAX BLOCK 4614A TOWN & COUNTRY BUILDERS OF MT AIRY DEED BOOK 1696, PAGE 4176 ASHMONT FOREST PLAT BOOK A PAGE 35 - i (SEE NOTE ON PLAT FOR 1' STRIP) / 1 I GRAFEE SCALE I I I I I I I I I I I I I I I I �I I �1 - I I I (a I I zrr.Mao: Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: U is IG TI 1 ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: OVERALL PLAN NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C00.01 c� z Y Q F- 07 It 0 U 0 U F- w w U) F- O J 0 U 0 0 U a� 0 0 0 s c 0 0 ti U N 0 ti 0 N U� Q 0 i� coo C N co a) oU) S09'08'22"W I I \ — 3.56' lie I l 20' PUBLIC WATERUNE EASEMENT 7 E. x %" Iron - C 1 Ex. 2'lron 3 BENT JATCHLINE AREA 3 \ A �► '� } " \ � r-----� � 3' D � 3 /REBARlphm I — — J AREA 1 F 41.30' o 00 I FUTURE ADDITION I 36' I C � Y s N88'47'07"W 101.39' - ' S8849'13" 1.52' /'BENT IR 3/'REBAR . % BENT IRON + G I I q I 30 H A I Rao' \ CC + I A I I F E I H EE �* It CO N _ W , 20 PUBLIC �i K �� 1� E — ` i C' ,O ,O ,` �',— �� `� `i `��� / 'y / ( Y" / 50' DUKE PO WE 0. RIGHT-Qlf0 WAY D BOOK 91, PA 1708 Q I N WATERLINE I I o EASEMENT / e F G H Y , `�, g� y / C /��� (LO 9B, BLO 4615) 0 - G 6' VIN LW B G K s '� `� `�.y29 LJ I 68.43' Q L I T � y .. E``' -s.A 1/ C >3 s " 11RON vo-, I J^ 26 WIDE��/ Q ' I NEW MIDDLE SCHOOL . :.s :,II► Rg2' 4 t... ,::. s, I A G SEE ARCHIIEC A P BUILDING LAYOUT AND ��h R15' / �✓ ` DIMENSIONS A H G L K A \ / 00 °e Rio' \ \ \ sj s'S U MAIN ENTRANCE " / A — o A D�o D '�o SAq H — N r�A W— N A A \ X A\ / �. BB GNA Id — — — 1/21RON " � 20' PUBLIC WATERLINE / EASEMENT / \ i K _ 8 S/W CANOPY � � LOADING ZONEIEASFjWDVT / / / / 20 PUBLIC WERUNE / .. o f Bp�K ' / <H \ �5 A A } �5 6' s 6' S G I. i-iI j i i 1 D IT H 11 1 D j i I 5 w ^ o I 17 SPACES 9• 13 SPACES STAFF PARKING - I A x N 53 PARKING SPACES- 23 SPACES71WI Ar ma's. v ' — — — — — — + 31 IRON -- — x x x x z x I I I I I I 25' REAR SETBACK 25' REAR SETBACK 1 " IRON 977.02' S8956'02"W 216.04' %"IRON 0.52' EIP S895722"W 3/ IRON S8951'17"W Tie / ,----- ---------------------------------------------------- W ,' --------------------------------------------------- — — — — — — — — — ----------------------------------------------------------------------------------- — ASHMONT FOREST COURT — ASPHALT DRIVE — — — —� -----------------, ------------- --------------- GRAVEL DRIVE ' EDGE OF ASPHALT(TYP.) Q—, `� -ckt --------------------------------- %IRON ' (50' PUBLIC R/W) co N 'I IRON 0.36' IRON SOUTH OF PROPERTY LINE �- QO Lf-) N ---- @ 9+23.60 KEY NOTES GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS: A STANDARD 24' CURB &GUTTER, SEE DETAIL SHEET _ Y CONCRETE WHEEL STOP, SEE DETAIL SHEET �� B CONCRETE PAVEMENT, SEE DETAIL SHEET-- � Z CONCRETE RAMP AND HANDRAIL, SEE DETAIL SHEET _._. 2ALL DIMENSIONS SHOWN ARE TO FACE OF CURB AND FACE OF BUILDING WALL, UNLESS OTHERWISE SHOWN. C 'HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET _ 8' ABC WITH WgVEN GEO-TEXTILE UNDERNEATH ON COMPACTED SUSGRADE, SEE DETAIL SHEET -_. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS SHOWN AND CONTACT THE ARCHITECT IF ANY DISCREPANCIES OCCUR. D 'UGHT' DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET _- B BIKE RACK, SEE SPECIRCA71ON --. 4. CONSTRUCTION STAKE OUT IS THE RESPONSIBILITY OF THE CONTRACTOR E STANDARD CURB & GUTTER TERMINUS, SEE DETAIL SHEET _ _ CC TRACK AND FIELD EVENT FACILITIES, SEE DETAIL SHEETS __ & 5 ALL PAVEMENT MARKINGS AND SIGNAGE SHALL CONFORM TO THE 'MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES' F SEE DETAIL SHEET CONCRETE FLUSH WITH PAVEMENT, _ D 4' TALL GALVANIZED CHAIN LINK FENCE, SEE DETAIL SHEET _ _ ® 6. ALL FACE OF RADIUS' ARE 4 FT UNLESS 07HERMSE SHOWN. 7. ALL PARKING SPACES SHALL BE 9' WIDE X 17.5 FT DEEP MIN. G CONCRETE SIDEWALK, SEE DETAIL SHEET -- EE 4' TALL GALVANIZED CHAIN LINK GATE, SEE DETAIL SHEET _ _ 6. (AC) DEN07ES ACCESSIBLE PARKING SPACE; H ACCESSIBLE CURB RAMP, SEE DETAIL SHEET 9. (VAC) DEN07ES VAN ACCESSIBLE PARKING SPACE I ACCESSIBLE PARKING, SEE SIGNAGE & STRIPING PLAN 10. ANY AND ALL LANDSCAPING DUS71NG TREES OR SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEM0L171ON OR _ CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR U71UZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADD17IONAL COST TO THE OWNER. K SEE ARCHITECTURAL PLANS FOR CANOPY, SCREEN & STRUCTURAL WALLS, BUILDING COLUMNS, LOADING DOCK, RAMPS: 11. CONTRACTOR SHALL SUBMIT SCALED PLANS OF ALL SCORING/JOINTS FOR APPROVAL BY ARCHI7ECT 30 DAYS MINIMUM OGRAVEL STAIRS: HANDRAILS; GUARDRAILS; BOLLARDS & MECHANICAL SERVICE YARD. SERVICE COURT 107H MECHANICAL EQUIPMENT, SEE MECHANICAL PLANS FOR EQUIPMENT PRIOR 70 INSTALLATION. LAYOUT & RELATED INFORMATION. 12 THE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.01 OM STEEL BOLLARD, SEE DETAIL SHEET 13 NO NORK SHALL BE PERFORMED ON RIGHT-OF-WAYS OR ADJACENT PROPER71ES UN71L THE OWNER NOTIFIES ON 4' TALL BLACK VINYL COALED (:RAIN LINK FENCE, SEE DETAIL SHEET CONTRACTOR IN WR171NG OF PROCUREMENT OF APPROPRIATE PERMITS, EASEMENTS, AGREEMENTS, OR RIGHTS -OF -WAY. 0 BLACK VINYL COA70 CHAIN LINK GATE, SEE DETAIL SHEET _ _ T YP. PARKING DIMENSIONS P 4' ORNAMENTAL ALUMINUM FENCE & GATES, SEE DETAIL SHEET 1_ & STRUCTURAL DWGS, Q LOCKED PIPE GATE, SEE DETAIL SHEET __ 41RAD R S17E RETAINING WALL, COORDINATE WITH CONSTRUCTION MANAGER & SEE ARCHI7ECTURAL SPECIFICATIONS FOR PERFORMANCE SPECIFICATIONS S PASSENGER LOADING ZONE; SEE DETAIL SHEET HDCP STALL 1. ALL DIMENSIONS ARE FROM T J57 STONE FIRE LANE; SEE DETAIL SHEET 11 FACE OF CURB AIN STANDARD 2 ALL STANDARD U TRASH CAN RECEPTACLE, SEE SPECIFICATION. STALL ACCESSIBLE PARKING VAN ACC. STALLS SHALL BE 9' WIDE GRAPHIC SCALE V DUMPSTER, PROVIDED BY OWNER STALL J. ALL VAN ACCESSIBLE W SEAT WALL, SEE DETAIL SHEET PARKING STALLS SHALL BE iI' WIDE 40 0 20 40 80 160 V X FLAGPOLE, SEE DETAIL SHEET _ STALL SITE PLAN STALL e ACCESSIBLE PARKING SIGN ( IN FEET) 1 inch = 40 ft;. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: STAKING PLAN AREA 1 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C01.01 c� z_ Y H U) It 0 U 0 U W W U) O J n 0 U 0 0 U (D 0 0 0 s c 0 0 Ir ti U A) 0 ti KEY NOTES STANDARD 24' CURB & GUTTER, SEE DETAIL SHEET CONCRETE PAVEMENT, SEE DETAIL SHEET - Q 'HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET 1UGH7' DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET STANDARD CURB & GUTTER 7ERMINU$ SEE DETAIL SHEET CONCRE7E FLUSH W17H PAVEMENT, SEE DETAIL SHEET _ CONCRETE SIDEWALK, SEE DETAIL SHEET -- ACCESSIBLE CURB RAMP, SEE DETAIL SHEET ACCESSIBLE PARKING, SEE SIGNAGE & STRIPING PLAN K SEE ARCHITECTURAL PLANS FOR CANOPY, SCREEN & STRUCTURAL WALLS; BUILDING COLUMNS; LOADING DOCK, RAMPS: STAIRS: HANDRAILS; GUARDRAILS; BOLLARDS & MECHANICAL SERVICE YARD. OGRAVEL SERVICE COURT W1714 MECHANICAL EQUIPMENT, SEE MECHANICAL PLANS FOR EQUIPMENT LAYOUT & RaA7ED INFORMATION. l M J STEEL BOLLARD, SEE DETAIL SHEET 4' TALL BLACK VINYL COATED CHAIN LINK FENCE, SEE DETAIL SHEET BLACK VINYL COATED CHAIN LINK GA7E, SEE DETAIL SHEET 4' ORNAMENTAL ALUMINUM FENCE & GA7ES, SEE DETAIL SHEET 1_ & STRUCTURAL DM LOCKED PIPE G47E, SEE DETAIL SHEET __ S17E RETAINING WALL, COORDINATE W17H CONSTRUCRON MANAGER & SEE ARCHITECTURAL SPECIRCA71ONS FOR PERFORMANCE SPECIFICA710NS PASSENGER LOADING ZONE; SEE DETAIL SHEET 157 STONE FIRE LANE; SEE DETAIL SHEET 11 7RASH CAN RECEPTACLE, SEE SPECIFICATION. DUMPS7ER, PROVIDED BY OWNER SEAT WALL, SEE DETAIL SHEET 11 FLAGPOLE, SEE DETAIL SHEET _._ S09'08'2 ---- - 3.56' I ASPHALT DRIVE Iron Ex. 2 Ir Y27I IRON N8951' I -POST IRON 131.55' 164.94'Total IRON 168.59' I I I I I I I I I 3/ "Iron I (1.74) I I I I I I I I I I I I I I I °o I o I I GRAVEL DRIVE M�I � Z I � I � ` t \ IM ` -- -- -- Q GRAVEL DRIVE ' II �"IronS02'S1'53"E N895839"W 10.40' Tie-------------------------JI _ _ 340.73' Tie Iron GRAVEL DRIV ��' , 7g" IRON Tie " _ S89'58'04 E 1 "IRON ---i i -- -- -- -- -- S8959'31"E-575.09' -- -- -- -- -- — -- -- — 333.74' -- -- -- 3 I I I I I li i li I z� A A A I I I I I I I c MB(, 1 Gm o CAR LOOP C o I I o C o0 I I � 200' 150' TAPER I A A A I I IIII E I h z k-t MOUNTABLE CONCRETE CURB AND GUTTER SEE BENCHMARK - TOP OF I I I DETAIL SHEET OPERATING BOLT 900.65 3160 BM 70PNUT I I I I p I I N89 5826"W ^ 907.40' I O I GRAVEL DRIV J i Shed I Z I LEWISVILLE VIENNA ROAD IMPROVEMENTS IN t ANOTHER CONTRACT. I J N MIDDLE SCHOOL �_ Z 0 DRIVEWAY GRADES WILL TIE TO NEW LEWISVILLE I I I VIENNA ROAD GRADES. � I � I I I I GRAVEL DRIVE ioMB \may I - J ' GRAVEL DRIVE AXLE %"IRON S89'48'07"E 34'7IRON 200.40' 7' SIDE SETBACK I I GRAVEL DRIVE - I I MB I I I Z � I i I I i i I � ' 1" IRON S89'43'19"E— 7/8" IRON I I 37.71' Tie LL I � ' I o i I I � � I I I I I 7.1 V_ Z td I I n i I C) o ' 25' REAR SETBACK z o- I � z MB I I I �`-- --- � `' I - �- N8958'06"W IL_--J -----------S8954'43"W� - 1" IRON S895443"W 7/8" IRON 69-, 2"Iron _ �'� _ N89316' - --' — ---- ------ - W 1 / e "IRON 199.16 9997' __. �-�S894758 �" 49.33 /�� __-----------�---�---------------��--- � ------ AXLE o ASPHALT DRIVE l-------- r - - - - DEXTER DRIVE - - - - - - ___- q, T--------------------- ASPHALT 0 -9 ----------------------- _ _ __ ----------- ---------------------------- _ S895825"E— S895825"E— S895825"E— —ram— -- � -- — — — —�� — ' x x 202.77 n I 1" IRON 99.89 310.11' I I r I I a I I � I I I m I I I I I I I I I I I I I CONCRETE WHEEL STOP, SEE DETAIL SHEET __ CONCRETE RAMP AND HANDRAIL, SEE DETAIL SHEET 8' ABC WITH WgVEN GEO-TEXTILE UNDERNEATH ON COMPACTED SUSGRADE, SEE DETAIL SHEET -- BIKE RACK, SEE SPECIRCA71ON --. CC 7RACK AND FIELD EVENT FACILIIIES; SEE DETAIL SHEETS __ & ®D 4' TALL GALVANIZED CHAIN LINK FENCE, SEE DETAIL SHEET EE 4' TALL GALVANIZED CHAIN LINK GA7E, SEE DETAIL SHEET GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS, 2. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB AND FACE OF BUILDING WALL, UNLESS OTHERWISE SHOWN. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS SHOWN AND CONTACT THE ARCHITECT IF ANY DISCREPANCIES OCCUR. 4. CONSTRUCTION STAKE OUT IS THE RESPONSIBILITY OF THE CONTRACTOR 5 ALL PAVEMENT MARKINGS AND SIGNAGE SHALL CONFORM TO 7HE 'MANUAL ON UNIFORM 7RAFFIC CON7ROL DEVICES' 6. ALL FACE OF RADIUS' ARE 4 FT UNLESS 07HERMSE SHOWN. 7. ALL PARKING SPACES SHALL BE 9' WIDE X 17.5 FT DEEP MIN. 8. (AC) DEN07ES ACCESSIBLE PARKING SPACE: 9. (VAC) DEN07ES VAN ACCESSIBLE PARKING SPACE 10. ANY AND ALL LANDSCAPING DUS71NG 7REES OR SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEIWOLJ71ON OR CONS7RUC71ON SHALL BE REPLACED BY 7HE C0017RACTOR U71UZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADD17IONAL COST TO 7HE OWNER. 11. CON7RACTOR SHALL SUBMIT SCALED PLANS OF ALL SCORING/JOINTS FOR APPROVAL BY ARCHI7ECT 30 DAYS MINIMUM PRIOR TO INSTALLA710N. 12 7HE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.0% 13 NO WIWRK SHALL BE PERFORMED ON RIGHT-OF-WAYS OR ADJACENT PROPER71ES UN71L 7HE OWNER N07IFlES CONTRACTOR IN WR171NG OF PROCUREMENT OF APPROPRIATE PERMITS, EASEMENTS, AGREEMEN7x OR RIGHTS -OF -WAY. TYP. PARKING DIMENSIONS GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft;. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: STAKING PLAN AREA 2 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C01 002 c� z Y H U) It 0 U 0 U F- W W a7 F- O J 0 U 0 0 U a� 0 0 0 s c 0 0 U A) 0 ti 1 I WETLAND IPPE: 8120' MA TCHL I NE AREA 4 AREA 3 / lop. Of C OAK C4 ` Q rn II / / M _ / x I I I / x / / R 2"IRON Tie S89 40'24"E 3�. IRON S893458"E he S893735"E — 216.20' — T' / 1%2"REBAR S897438 E - S89'13'44'E - 52.76' 134.83' REBAR — — _ — — 3/ "IRON 78.69' L92246"E - \ TIDE SEtCK —"IRON / / \ Tie 1 "SOLID IRON 281.31' EE - - - - - , 25.22' I I � 5' ---��----- / CC \+ `\\ / / I x x� \ \ Q / LLI II \ x C x \ I I I \ \ I I x x / I x x \ INI I x I \ i\ / / I x x l I x 20' Pueuc / / I WATERLINE rNS x \ \ / x EASEMENT w x / J / SCM 1 I I � I \ / WET POND I \ PPE- 826.5' x I j / / I x I x x CC CC I CC EE Tie Tie ------------------------------------------ 99.79' %"IRON 128.75' A % IROZ S89 47'08"E 228.55' Total %IRON / / - --- x Tie i I / - x -- BARKWOOD DRIVE / ----------------------------------- ASPHALT DRIVE x x I S89 51'37'E _ 210.00' 232.36' I / / x 15' 151 ' EE i o Tie ' SIDE SETBACK / / 20 7I I L'J C� x / x x I p Y m IY Yom� 20' PUBLIC WATERLINE o EASEMENT W �5Eo� I I� / � I A x G I I I / I 26' WIDE , x I Q o � I � I / E A / x o� I N" `� x I T _ D I ' I _ M G x 2 x / M L J M 30' I S09'08'22"W I I \ l 20' PUBLIC WATERLINE 3.56' lie I / EASEMENT x I %" Iron - C Ex. 2'lron 3% BENT JA TCHL I NE AREA 3 \ l r — — — — —� A 030 3 " ' � � � ' D � } /REBAR 1phm I J AREA 1 °° Y s 3� 13 W 1 1. N88'4T07"W 101.39' - S8849'13" 1.52' I FUTURE ADDITION I 36' I I w 41.30' —0I /'BENT IR 3/'REBAR .% BENT IRON + G I A + /I � H A �. C Rao' G I 30' i. � I � O(D I I H EE +\ � `� KEY NOTES A STANDARD 24' CURB & GUTTER, SEE DETAIL SHEET B CONCRETE PAVEMENT, SEE DETAIL SHEET-- C 'HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET D 'UGHr DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET E STANDARD CURB & GUTTER TERMINUS; SEE DETAIL SHEET F CONCRETE FLUSH WITH PAVEMENT, SEE DETAIL SHEET _ G CONCRETE SIDEWALK, SEE DETAIL SHEET -- H ACCESSIBLE CURB RAMP, SEE DETAIL SHEET I ACCESSIBLE PARKING, SEE SIGNAGE & S7RIPING PLAN J - K SEE ARCH17EC1URAL PLANS FOR CANOPY, SCREEN & STRUCTURAL WALLS; BUILDING COLUMNS; LOADING DOCK, RAMPS: STAIRS: HANDRAILS; GUARDRAILS; BOLLARDS & MECHANICAL SERVICE YARD. OGRAVEL SERVICE COURT 107H MECHANICAL EQUIPMENT, SEE MECHANICAL PLANS FOR EQUIPMENT LAYOUT & RaA7ED INFORMATION. OM STEEL BOLLARD, SEE DETAIL SHEET ON 4' TALL BLACK VINYL COATED CHAIN LINK FENCE, SEE DETAIL SHEET 0 BLACK VINYL COA TED CHAIN LINK GA 7E, SEE DETAIL SHEET P 4' ORNAMENTAL ALUMINUM FENCE & GATES, SEE DETAIL SHEET 1_ & STRUCTURAL DWGS. Q LOCKED PIPE GATE, SEE DETAIL SHEET __ R SITE RETAINING WALL, COORDINATE WITH CONSTRUCRON MANAGER & SEE ARCHITECTURAL SPECIRCA71ONS FOR PERFORMANCE SPECIFICA710NS S PASSENGER LOADING ZONE; SEE DETAIL SHEET T 157 STONE FIRE LANE; SEE DETAIL SHEET 11 U 7RASH CAN RECEPTACLE, SEE SPECIFICATION. V DUMPS7ER, PROVIDED BY OWNER W SEAT WALL, SEE DETAIL SHEET X FLAGPOLE, SEE DETAIL SHEET _ Y CONCRETE WHEEL STOP, SEE DETAIL SHEET __ Z CONCRETE RAMP AND HANDRAIL, SEE DETAIL SHEET 8' ABC WITH WOVEN GEO-TEXTILE UNDERNEATH ON COMPACTED SUBGRADE, SEE DETAIL SHEET -_. B BIKE RACK, SEE SPECIRCA71ON --. CC 7RACK AND FIELD EVENT FACTURES; SEE DETAIL SHEETS __ & ®D 4' TALL GALVANIZED CHAIN LINK FENCE, SEE DETAIL SHEET EE 4' TALL GALVANIZED CHAIN LINK GA7E, SEE DETAIL SHEET GENERAL NOTES 1. ALL CONS7RUC71ON SHALL BE IN ACCORDANCE WI7H ALL TOWN OF LEESVILLE & NCDOT STANDARDS & SPECIFICATIONS: 2. ALL DIMENSIONS SHOWN ARE 7O FACE OF CURB AND FACE OF BUILDING WALL, UNLESS OTHERWISE SHOWN. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS SHOWN AND CONTACT THE ARCHITECT IF ANY DISCREPANCIES OCCUR. 4. CONSTRUCTION STAKE OUT IS THE RESPONSIBILITY OF THE CONTRACTOR 5 ALL PAVEMENT MARKINGS AND SIGNAGE SHALL CONFORM TO 7HE 'MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES' 6. ALL FACE OF RADIUS' ARE 4 FT UNLESS 07HERMSE SHOWN. 7. ALL PARKING SPACES SHALL BE 9' WIDE X 17.5 FT DEEP MIN. 8. (AC) DEN07ES ACCESSIBLE PARKING SPACE 9. (VAC) DEN07ES VAN ACCESSIBLE PARKING SPACE 10. ANY AND ALL LANDSCAPING DUS71NG 7REES OR SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEIWOLJ71ON OR CONS7RUC71ON SHALL BE REPLACED BY 7HE C0017RACTOR U71UZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADD17IONAL COST TO 7HE OWNER. 11. CON7RACTOR SHALL SUBMIT SCALED PLANS OF ALL SCORING/JOINTS FOR APPROVAL BY ARCHI7ECT 30 DAYS MINIMUM PRIOR 70 INSTALLA710N. 12 7HE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.0% 13 NO WORK SHALL BE PERFORMED ON RIGHT-OF-WAYS OR ADJACENT PROPER71ES UN71L 7HE OWNER N07IFlES CONTRACTOR IN WR171NG OF PROCUREMENT OF APPROPRIATE PERMITS, EASEMENTS, AGREEMENTS, OR RIGHTS -OF -WAY. TVP PAI?VINIC. n1AAr\iQin&iQ GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft;. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP Seal: CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 •• H Cq,,''• l • .P � I��f+fi11et N�l�aG ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: STAKING PLAN AREA 3 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C01.03 c� z Y H U) It 0 U 0 0 U F- W W U) F- O J n 0 U 0 0 U (D 0 0 0 s c 0 0 ry r` U A) 0 ti "IRON � p 3.28' IRON 26 POINT -Ell S68S O EXISTING WALL io F /C' F "IRON Ro S FT RD E NT FAA � Y\ "IRON EXISTING WALL-- \ ' \ \ 000, 34'7IRON I / / 20 F p EXISTING WALL "IRON RIBN__ iO86 A (60 R411n010R0 egP�0 �29 --; i /- ---- Q / 4740— ---_ _ ' I I � EXISTING WALL - - SC 2 =1 I WETLAND IPPE: 812.0' MATCHLINE AREA 4 / / AREA 3 I ' — KEY NOTES STANDARD 24' CURB & GUTTER, SEE DETAIL SHEET CONCRETE PAVEMENT, SEE DETAIL SHEET - Q 'HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET 1UGH7' DUTY ASPHALT PAVEMENT, SEE DETAIL SHEET STANDARD CURB & GUTTER TERMINUS; SEE DETAIL SHEET CONCRE7E FLUSH W17H PAVEMENT, SEE DETAIL SHEET _ CONCRE7E SIDEWALK, SEE DETAIL SHEET -- ACCESSIBLE CURB RAMP, SEE DETAIL SHEET ACCESSIBLE PARKING, SEE SIGNAGE & STRIPING PLAN K SEE ARCHITECTURAL PLANS FOR CANOPY, SCREEN & STRUCTURAL WALLS BUILDING COLUMNS LOADING DOCK, RAMPS, STAIRS, HANDRAILS GUARDRAILS, BOLLARDS & MECHANICAL SERVICE YARD. OGAVEL SERVICE COURT W1714 MECHANICAL EQUIPMENT, SEE MECHANICAL PLANS FOR EQUIPMENT LAYOUT & RELA7ED INFORMATION. l M J STEEL BOLLARD, SEE DETAIL SHEET 4' TALL BLACK VINYL COATED CHAIN LINK FENCE, SEE DETAIL SHEET BLACK VINYL COA TED CHAIN LINK GA 7E, SEE DETAIL SHEET 4' ORNAMENTAL ALUMINUM FENCE & GA7ES, SEE DETAIL SHEET 1_ & STRUCTURAL DM LOCKED PIPE G47E, SEE DETAIL SHEET __ S17E RETAINING WALL, COORDINATE W17H CONSTRUCRON MANAGER & SEE ARCHITECTURAL SPECIRCA71ONS FOR PERFORMANCE SPECIFICA710NS PASSENGER LOADING ZONE; SEE DETAIL SHEET 157 STONE FIRE LANE; SEE DETAIL SHEET 11 7RASH CAN RECEPTACLE, SEE SPECIFICATION. DUMPS7ER, PROVIDED BY OWNER SEAT WALL, SEE DETAIL SHEET 11 FLAGPOLE, SEE DETAIL SHEET _._ CONCRETE WHEEL STOP, SEE DETAIL SHEET __ CONCRETE RAMP AND HANDRAIL, SEE DETAIL SHEET 8' ABC WITH WgVEN GEO-TEXTILE UNDERNEATH ON COMPACTED SUSGRADE, SEE DETAIL SHEET -- BIKE RACK, SEE SPECIRCA71ON --. CC 7RACK AND FIELD EVENT FACILITIES, SEE DETAIL SHEETS __ & ®D 4' TALL GALVANIZED CHAIN LINK FENCE, SEE DETAIL SHEET EE 4' TALL GALVANIZED CHAIN LINK GA7E, SEE DETAIL SHEET GENERAL NOTES 1. ALL CONS7RUCRON SHALL BE IN ACCORDANCE W17H ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS. 2. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB AND FACE OF BUILDING WALL, UNLESS OTHERWISE SHOWN. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS SHOWN AND CONTACT THE ARCHITECT IF ANY DISCREPANCIES OCCUR. 4. CONSTRUCTION STAKE OUT IS THE RESPONSIBILITY OF THE CONTRACTOR 5 ALL PAVEMENT MARKINGS AND SIGNAGE SHALL CONFORM TO 7HE 'MANUAL ON UNIFORM 7RAFFIC CON7ROL DEVICES' 6. ALL FACE OF RADIUS' ARE 4 FT UNLESS 07HERMSE SHOWN. 7. ALL PARKING SPACES SHALL BE 9' WIDE X 17.5 FT DEEP MIN. 8. (AC) DEN07ES ACCESSIBLE PARKING SPACE: 9. (VAC) DEN07ES VAN ACCESSIBLE PARKING SPACE 10. ANY AND ALL LANDSCAPING DUS71NG 7REES OR SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEIWOLJ71ON OR CONS7RUC71ON SHALL BE REPLACED BY 7HE CON7RACTOR U71UZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADD17IONAL COST TO 7HE OWNER. 11. CON7RACTOR SHALL SUBMIT SCALED PLANS OF ALL SCORING/JOINTS FOR APPROVAL BY ARCHI7ECT 30 DAYS MINIMUM PRIOR 70 INSTALLA710N. 12 7HE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.0% 13 NO WIWRK SHALL BE PERFORMED ON RIGHT-OF-WAYS OR ADJACENT PROPER71ES UN71L 7HE OWNER N07IFlES CONTRACTOR IN WR171NG OF PROCUREMENT OF APPROPRIATE PERMITS, EASEMENTS, AGEEMEN7x OR RK;HT5-OF-WAY. TYP. PARKING DIMENSIONS GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft;. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP Seal: CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 •• � H ''• '7 . 1566 �� F C. P E� • +r111 r N 000% I -A `11 ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: STAKING PLAN AREA 4 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C01 No4 m a� oU) \ JJ / / l / 20' PUBLIC / 860.40WA 7ERLINE ' / / 859.50T 860.90 A103 x A6 / / / / I i I / � ///000 849.40 + i � / / CD� -, I x/ ------ - 860.50T_ 6 A7 + / 850.40 / A1030 / 850.00 I 850 - / 851.00 ----- II 861.20T sso.00 s B.00T _� /� // I ss _ ,- II__--- / W x 1 A960 o_ __----- _- I I \ / N I I II I I I \ PUBLIC 1 1 1 \ I I i I I \ \ I I � \ I I 1 11 �' 860.50 859.50T _ - - ��' 5 POWER CO. �� 4 _ _--- --- / �� SS /J / F-WAY -� 859. 20 T / / / / /' / % / / / / / DEED OOK M- 'l PAGES-7-e8 ^' �� ASS S SS w I WA 1 I \ I I WATERLINE W EASEMENT I \\ \ 1 11 1 1 1 \ J\ i II I I / I I 861.00 _ n �1020 a /^- - - - 860.60T / � � � 8� -- --- SS / r (LOT 9,B, BLOCK O 5) 859.8 / ---- / � B _ _ iI 1 838-- - I I I I I I I I I I I I I I I I / \ I I 1 / \ -SS-, /' \ ' I\� / Q Q I I \ 859.1OT �'/ \ // S ��� ss\/ / / �/ Ss�- - -- - Al � _- � / I I P RMANE T OU ET 860.40 860.50 \ 8 - // ��� /� /� __ / / SS --� OTEC71 /� r �\ ( 861.35 / A1021 A102 859.50 �- -- � /// �_- �� S�' Imo\ /� ✓/ �/ // Jam, -1 r\� l /.I'L�24, GLASS B STgNEI(2 " K) / I / \ I F S I - � 860.00 v� // _ / i � / `' A3 / A2 ,/ / C2 I /I I �a j �, // ,� SS ;,� sso. r / / �-� / / / / \ /. 861.35 - 861.00 6� i� Ss� / , /�/\_ - - 860.50 �� // / �� \ �� �/ (\ l \v/ / / \ 1 ---�/ -J / - <'n 859.50 - - \ NEbt�MIDDIESCHOOL / A961 \ _---- --� e__ SS SS, _---- �,-r 860.10 / 1 - - /� 860.00 FFE = 861.50 ��� _ ��� // /' r~' /�'' ��' 1 r // A93 / A962 LLA /J 2 ��- W W W� �� / / , a 855.12 G CONTRACTOR SHALL VEI? Ff ALL BUILDING, WALL- ' / / ', 860. 70 T / l AND CANOPY FOOD ELEVATIONS WITH THE I / A 92 854. 72 j \ �' 858.05 T W I lti l / 861.20T FINISH GQADES, SEE STRUCTURAL PLANS FOR g56-' �' �D - !1 / / /' / / / / \ / �' �' / / f 816 ADDP1iONAL INFORMATION. , / / _ / / / � RD = / A920 i/ 855. OT � 855.40T /' l I / / \ 857.6/ G� -_ / / �� 861.20T ' �' _�' / SS 860.60 /�// \ �' 8�� 1 858.50T /,/ \ 860.95 G / / , // /�� y / / / A96 \\ \ ss A1010 �F A95 --� / I A950 8s1.10 // / I / / /' //' /' \` // /^ / /' 8 / - / / / / /-- \ k 860.00 .�/6 �� / // / / / / /� 808 ,-- 855.30T _ �/ 7 / / / 859.00 / _ �R / / // ��� / ,, /' ' / � / / -- / \ / / / ! _ _- 855.90T __--- �/ } j' �-�_ / _ C1 856.10T / 859.50T�✓��/ice=== \ 860.70 - - �=_ ���,/ // / / / FES / / �i iij,/�iii.��-=��_�-- ----- -- i'$ 8 _ -' ��� /20' PUBLIC / WATERLINE \ / l 856.70T / EASEMENT Iv SS //�. W En 859.50 �� / / / / / / / / // -i / // / // / / ,i%�---- / �i v 20' PUBLIC- --- ----- 1, y/ - _--- _--- - / 860.30T ' / I /� / i / 860.00 W W W W / WATERLINE-- EASEMENT- 85 _ _ 857.80T _ \ I �852' _ - 858.40T / �--------- / / ----- ----- i - SS -ASS -S�- / / / / - / i' // %ii�iiij� /i/ - - __--- 856- ��, / // / /---- --- 859.20T -860--- \ 859.50T �' /� �/ \ 861.40r } //' - 857.30T / -_-_-' --- ----------- 859.70T / 8��/ // / // // / , // / / ��__� j ��\ // / / lL '- --- / j / A98 857.o0T // / / / // j -.\\\\ // // / / / ,/ / / �� �i -\ \ 1 I / � / l �- --866-------- -i , \ 865.00T2.10 I / i x ,842~`_---''' _--- 856.00T / 1141 ' \ �� I 856.60T �� // // , / / /ice/��/-- / / ��� \ \ WOODED // / / / ` - \ / 8 \ 865.20T \ \\ B \ 865.70T I / / / / O / _ / 855.40T �� 8�� / / / / /ii /iii / / \ \ / / / 0 �� / / 20� \ / / / - \ \ \-� / / 83 / \ 865.90T \ 866.30T 865.80T l l I l / �,/ /� A990 +856.0 / �i 874 �� _-834 --- / \ ---- - -_- - - - - - - - - - - - - 838 ,� \\ I / --------------_-=___ \ _\ __-_ `_,- \ \ ----- r // // --------------- -----_ ---- -- - ----------\ - - - / REAR SETBACK 125�-AR=ETBACK- - -� -f b03 -25 �a T a \) / I - = -�- - L �� -rn- -- /q,`O�' /�0�ti6�/////' I / ��INV:- _---858 -- - \, \_ W - $5� W W� ____ - ___--_ - 85 a 6 36 ----- IN 855.76 ,----------- /-------------------------------- ------------------------- -------------------------- - - �- ------------ \ --------------------- / \ _ \ ---------------- - 844 _ ----- ---------\ - -- - ��-------------------�-------------------------�--------------- - - � ---- r'- ------------ ---------------- - _ / j I--- 1\ _,��ASHMONT - I--- FOREST COURT ir // 0�1 1-- �----------L-----------zF ----� - -------- -' W --- W --- W ��� �� \ 10� � � m GENERAL NOTES GRADING LEGEND DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS. 2. ALL SPOT ELEVATIONS INDICATED AT CURB AND GUTTER AND ARE DENOTED TO TOP OF CURB, UNLESS OTHERWISE EXISTING CONTOURS SHOWN. STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA UP STRM DN STRM DEPTH TYPE NOTES UP STRM DN STRM TOP ELEV. DEPTH TYPE NOTES 3. TOTAL DENUDED AREA = 30 AC FINAL CONTOURS SLOPE DIA. LENGTH MATRL INV. INV. �TOPELEV.J SLOPE DIA. LENGTH MATRL INV. INV. UP STRM DN STRM SLOPE DIA. LENGTH MATRL INV. INV. TOP ELEV. DEPTHJ TYPE NOTES 4. CONTRACTOR SHALL AD,NJST ALL EXISTING VAULIS MANHOLES, STORM DRAIN STRUCTURES, CLEANOUTS ETC. AS (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) NEEDED TO MATCH FINISH GRADE. 5. ALL BACKFILL, COMPACTION, SOILS TESTING, ETC. SHALL BE PERFORMED BY THE OWNERS INDEPENDENT TESTING 270.4+ EXISTING SURVEY SPOT ELEVATION Al A2 1.67% 18 6 RCP 833.20 833.10 837.30 4.10 CB A90 A91 1.00% 15 40 RCP 867.00 866.60 870.50 3.50 CB A1010 A100 6.34% 15 142 RCP 854.00 845.00 860.00 6.00 ❑I LABORATORY. (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION) A2 A3 1.43% 18 14 RCP 833.00 832.80 837.30 4.30 CB A91 A92 5.00% 15 224 RCP 866.50 855.30 870.50 4.00 CB 6. ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. PPE: PERMANENT POOL ELEVATION A3 A4 0.58% 24 224 RCP 832.70 831.40 838.10 5.40 CB A92 A93 3.80% 18 1D8 RCP 855.20 851.10 859.20 4.00 CB A1020 A1021 2.00% 15 50 RCP 856.00 855.00 860.00 4.00 ❑I SEE DETAIL ON SHEET C_.� A4 A5 0.69% 24 58 RCP 831.50 831.10 850.00 18.50 DI A93 A94 1.36% 18 22 RCP 851.00 850.70 855.00 4.00 CB A 1021 A 102 2.71 % 15 70 RCP 854.90 853.00 860.00 5.10 ❑I 7. EXISTING VEGETATION WITHIN TREE PROTECTION AREAS SHALL REMAIN UNDISTURBED. UNLESS NOTED OTHERWISE. A5 A6 0.70% 30 100 RCP 831.00 830.30 849.40 18.40 DI A94 A95 1.11% 24 36 RCP 850.20 849.80 855.00 4.80 CB 270.50T PROPOSED TOP OF CURB SPOT ELEVATION 8. ANY AND ALL LANDSCAPING AND EXISTING TREES &SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEMOL1110N OR A6 A7 0.76% 30 92 RCP 830.20 829.50 849.40 19.20 DI A95 A96 1.04% 24 222 RCP 849.70 847.40 854.50 4.80 DI A1030 A1031 2.50% 15 60 RCP 856.50 855.00 860.00 3.50 ❑I CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR UTILIZING A LICENSED LANDSCAPE CONTRACTOR AT NO ° A7 A8 0.71 /0 30 84 RCP 829.40 828.80 850.00 20.60 DI A96 A97 1.00% 30 Tao RCP 846.90 845.50 859.00 12.10 DI ° A 1031 A 103 1.33:0 15 180 RCP 854.90 852.50 858.50 3.60 ❑I ADDITIONAL COST TO THE OWNER. A8 A9 0.75% 30 80 RCP 828.70 828.10 850.00 21.30 DI A97 A98 1.02% 30 118 RCP 845.40 844.20 861.40 16.00 CB 9. THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE CODES IN OBSERVING EROSION CONTROL MEASURES BOTH 270.50 PROPOSED GROUND/PAVEMENT ELEVATION A9 A10 0.71% 42 56 RCP 828.00 827.60 852.70 24.70 CB A98 A99 1.02% 30 128 RCP 844.10 842.80 859.70 15.60 CB B1 32 1.07% 15 28 RCP 821.00 820.70 824.50 3.50 CB ON AND OFF -SITE. A10 A11 0.71% 42 28 RCP 827.50 827.30 851.05 23.55 CB A99 A100 1.08% 30 74 RCP 842.70 841.90 858.30 15.60 CB ° B2 B3 2.78:0 15 54 RCP 820.60 819.10 824.50 3.90 CB 10. 1NE GRADING CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS A11 Al2 0.76% 42 92 RCP 827.20 826.50 851.05 23.85 CB A100 A101 1.00% 30 130 RCP 841.80 840.50 857.50 15.70 DI B3 34 9.06°0 15 32 RCP 819.00 816.10 823.58 4.58 CB DIRECTED BY STATE AUTHORITIES OR THE ARCHITECT. 270.50TW PROPOSED FINISHED GRADE AT TOP OF WALL ELEVATION A101 A102 1.00% 30 140 RCP 840.40 839.00 857.50 17.10 DI B4 35 8.75% 15 40 RCP 816.00 812.50 824.00 8.00 CB 11. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE Aso As1 1.06% 12 1oa RCP 845.90 84a.8o 849.40 3.so DI A102 A103 1.06% 30 132 RCP 838.90 837.50 859.10 20.20 DI MATERIALS GENERATED DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR OFF -SITE A51 A52 1.00% 15 100 RCP 844.70 843.70 849.40 4.70 DI A103 A9 7.04% 30 98 RCP 837.40 830.50 856.00 18.60 DI B30 33 1.00°'0 15 28 RCP 820.08 819.80 823.58 3.50 CB STOCKPILES AND/OR WASTE AREAS. 270.508W 12. THE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.01 PROPOSED FINISHED GRADE AT BOTTOM OF WALL ELEVATION A52 A53 1.00% 15 100 RCP 843.60 842.60 849.40 5.80 DI A920 A92 1.00% 15 40 RCP 855.70 855.30 859.20 3.50 c6 A53 AS 9.13% 15 104 RCP 841.00 831.50 849.40 8.40 DI C1 C2 3.33°'0 36 210 RCP 847.00 840.00 856.00 9.00 FES 13. CONTRACTOR SHALL VERIFY ALL EXISTING ELEVATIONS WHERE NEW CONSTRUCTION JOIN OR CONNECT TO EXISTING PAVEMENT, CURB AND OTHER RIGID STRUCTURES NOTIFY ARCHITECT IF DISCREPANCIES OCCUR. 29 STORM STRUCTURE NUMBER A510 A51 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A950 As5 1.00% 15 20 RCP 851.80 851.60 855.30 3.50 CB C3 C4 1.16°'0 54 86 RCP 804.00 803.00 822.00 18.00 HW EXISTING STORM DRAIN PIPE A960 A961 1.00% 15 140 RCP 856.00 854.60 859.50 3.50 DI A520 A52 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A961 A962 1.15% 15 26 RCP 854.50 854.20 859.50 5.00 DI D1 ❑2 4.27% 15 110 RCP 834.50 829.80 836.50 2.00 PE PROPOSED STORM DRAIN PIPE A962 A963 7.58% 15 66 RCP 854.10 849.10 860.00 5.90 DI A530 A53 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A963 A96 7.22% 15 18 RCP 849.50 848.20 858.90 9.40 CB FD PROPOSED FOUNDATION DRAIN DISCHARGE LINE. SEE ARCH. PLANS FOR DRAIN PIPE LOCATIONS ALONG BUILDING WALLS. A80 A8 1.96% 12 56 RCP 846.40 845.30 849.40 3.00 DI A990 A991 2.50% 15 4 RCP 851.90 851.80 855.40 3.50 CB RD PROPOSED ROOF DRAIN A991 A99 7.55% 15 1D2 RCP 851.70 844.00 855.40 3.70 CB LEGEND NOTES TREE PROTECTION FENCE A1000 A1001 A1001 1.02% 12 A1002 1.06% 12 98 RCP 846.40 845.40 849.40 3.00 DI 1D4 RCP 845.30 844.20 849.40 4.10 DI CB CATCH BASIN, SEE DETAIL SHEET X TOP ELEVATION IS TOP OF RIM FOR DI DROP INLET, SEE DETAIL SHEET X MANHOLES, TOP OF GRATE FOR YARD A1002 A1003 1.00% 12 1D0 RCP 844.10 843.10 849.40 5.30 DI MH MANHOLE, SEE DETAIL SHEET X INLETS AND FINISH GRADE FOR CLEANOUTS. A1003 A1004 1.00% 15 1D0 RCP 843.00 842.00 849.40 6.40 DI GRAPHIC SCALE PE PLAIN END PIPE. A1004 A1005 1.04% 15 48 RCP 841.90 841.40 849.40 7.50 DI SO STORMWA TER CONTROL MEASURE OUTLET, SEE DETAIL SHEET X ALL FES INLETS & OUTLETS SHALL BE A1005 A1006 1.00% 15 40 RCP 841.30 840.90 850.00 8.70 DI 40 0 20 40 8o 180 A2 STRUCTURE I.D. NUMBER RCP. A1006 A10 1.11% 15 36 RCP 840.80 840.40 849.50 8.70 DI r4 ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: ' SEAL ........ 1..© ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: GRADING PLAN AREA 1 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number CO3.01 GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE W17H ALL TOWN OF LEK1SWLLE & NCDOT STANDARDS & SPECIFICATIONS. 2. ALL SPOT ELEVATIONS INDICATED AT CURB AND GUTTER AND ARE DENOTED TO TOP OF CURB, UNLESS OTHERWISE SHOWN. 3. TOTAL DENUDED AREA = 30 AC 4. CONTRACTOR SHALL ADXST ALL EXISTING VAULTS, MANHOLES, STORM DRAIN STRUCTURES, CLEANOUTS, ETC. AS NEEDED TO MATCH FINISH GRADE. 5. ALL BACKFILL, COMPACRON, SOILS TESTING, ETC. SHALL BE PERFORMED BY THE OWNERS INDEPENDENT TESTING LABORATORY. (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION) 6. ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAIL ON SHEET C_ Z EXISTING VEGETATION WITHIN TREE PROTECTION AREAS SHALL REMAIN UNDISTURBED. UNLESS NOTED OTHERWISE. & ANY AND ALL LANDSCAPING AND EXISTING TREES & SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR UTILIZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 9. THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF -SITE 10. THE GRADING CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY STATE AUTHORITIES OR THE ARCHITECT. 11. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE MATERIALS GENERATED DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR OFF -SITE STOCKPILES AND/OR WASTE AREAS. 12. THE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.01 13. CONTRACTOR SHALL VERIFY ALL EXISTING ELEVATIONS WHERE NEW CONSTRUCTION JOIN OR CONNECT TO EXISTING PAVEMENT, CURB AND OTHER RIGID STRUCTURES NOTIFY ARCHITECT IF DISCREPANCIES OCCUR. m a� oU) BENCHMARK - TOP OF OPERATING BOLT 900.65 GRADING LEGEND EXISTING CONTOURS FINAL CONTOURS 270.4+ EXISTING SURVEY SPOT ELEVATION PPE: PERMANENT POOL ELEVATION 270.50T PROPOSED TOP OF CURB SPOT ELEVATION 3160 BM TOPNUT 270.50 PROPOSED GROUND/PAVEMENT ELEVATION 270.50TW PROPOSED FINISHED GRADE AT TOP OF WALL ELEVATION 270.508W PROPOSED FINISHED GRADE AT BOTTOM OF WALL ELEVATION 29 STORM STRUCTURE NUMBER EXISTING STORM DRAIN PIPE PROPOSED STORM DRAIN PIPE FD PROPOSED FOUNDATION DRAIN DISCHARGE LINE. SEE ARCH. PLANS FOR DRAIN PIPE LOCATIONS ALONG BUILDING WALLS. RD PROPOSED ROOF DRAIN TREE PROTECTION FENCE I M it 1 �IN t 8.79 QQ 41 I ✓ - E - \ 92.29 Fri II hII � �I I� T\ ILII INV. 894.4Y` Z I o 396 INV.• \89 .9 / 1 i I III I it M4�I' P E BURIF6 IINV. 895.23 `------- i / / _ .II ICI- � - jl I ------ - - - - - - / - 7 / CDR I INV Ii 95.6'1 - -/ - ,, Cb ag / II r I / ' -, - / MAPL II J i III 898.51 TWO. / / / / / / I / h�' 7Q 859.20T � UKN I1 / / / / / $ + 8 8.1 / ' / / / / / l l \ ;I � I I 1 MAPL 895.47T 890.97T / / l / / I M% � \� ill i 895.92T 891.48T // // / / / / A91 / / � // / / / A92 I I \ I qJ8 9 V0/ I \ I I I ( 898.78T O A920 / ' ' / 895.48T 890.98T ¢2 8sa.sarGO / 17 97. / / / / / // // // / WOWD --T/700 z I 1 97 / / / / / INV.•I 96.46 II I / // / /' / / // / / // ��� / / // // // /' ----- - - - - - - - - - ____ _,-------------- -- i113 / A W I �11 INV. 1 i c� /,-Ntil1 I I I t III q INV. $ 4.9 y - il i i I INV.• 895.32 1 N� 6" UKN I n _� C1 z II �/ 11n171 95.73 - - - - - - _ I I ..f I N rn 89461 I I 7' SIDE SETBACK - I -?96 z� 'I - - 4" CEDAR I iMB IIIIdNv. 1893.98 12" CHERRY T 12" OAK c-i\ FT, I I \I I N3 I CI gST�R / I ' \ 6 RUB I a I \ II INV. ro p 1891.73 III39 19 NV. 1891.32 rat ��\'' \ I I ' 25' REA SETBACK IN 1 1'18" CONC.� 8�0.64� ' _ \ L - N _ \ 892 o U m--\ �I I, ~ IF � II I --•-�-----_- 9Q/_- =- --r��i -'��� - �\�'------ -�----�------ \ -- - 6 \894 --- �--------------E 896 4, DEXTER DRIVE �94 I--- INV39 E E E 896 E- X__ .44 - � /896 \ \\ \1\1 II I� II Icy Q I I CIO IITO DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE STRUCTURE NO. PIPE SLOPE PIPE DIA. PIPE LENGTH PIPE MATRL UPPER I INV. LOWER INV. �TOPELEV.J UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE SLOPE PIPE DIA. PIPE LENGTH PIPE MATRL UPPER INV. LOWER INV. UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE SLOPE PIPE DIA. PIPE LENGTH PIPE MATRL UPPER INV. LOWER INV. UPSTREAM STRUCTURE DATA UP STRM DN STRM DEPTH TYPE NOTES UP STRM DN STRM TOP ELEV. DEPTH TYPE NOTES UP STRM DN STRM TOP ELEV. DEPTHJ TYPE NOTES (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) Al A2 1.67% 18 6 RCP 833.20 833.10 837.30 4.10 CB A90 A91 1.00% 15 40 RCP 867.00 866.60 870.50 3.50 CB A1010 A100 6.34% 15 142 RCP 854.00 845.00 860.00 6.00 ❑I A2 A3 1.43% 18 14 RCP 833.00 832.80 837.30 4.30 CB A91 A92 5.00% 15 224 RCP 866.50 855.30 870.50 4.00 CB A3 A4 0.58% 24 224 RCP 832.70 831.40 838.10 5.40 CB A92 A93 3.80% 18 108 RCP 855.20 851.10 859.20 4.00 CB A1020 A1021 2.00% 15 50 RCP 856.00 855.00 860.00 4.00 ❑I A4 A5 0.69% 24 58 RCP 831.50 831.10 850.00 18.50 DI A93 A94 1.36% 18 22 RCP 851.00 850.70 855.00 4.00 CB A 1021 A 102 2.71 % 15 70 RCP 854.90 853.00 860.00 5.10 ❑I A5 A6 0.70% 30 100 RCP 831.00 830.30 849.40 18.40 DI A94 A95 1.11% 24 36 RCP 850.20 849.80 855.00 4.80 CB A6 A7 0.76% 30 92 RCP 830.20 829.50 849.40 19.20 DI A95 A96 1.04% 24 222 RCP 849.70 847.40 854.50 4.80 DI A1030 A1031 2.50% 15 60 RCP 856.50 855.00 860.00 3.50 ❑I A7 A8 0.71% 30 84 RCP 829.40 828.80 850.00 20.60 DI A96 A97 1.00% 30 140 RCP 846.90 845.50 859.00 12.10 DI A1031 A103 1.33% 15 180 RCP 854.90 852.50 858.50 3.60 ❑I A8 A9 0.75% 30 80 RCP 828.70 828.10 850.00 21.30 DI A97 A98 1.02% 30 118 RCP 845.40 844.20 861.40 16.00 CB A9 A10 0.71% 42 56 RCP 828.00 827.60 852.70 24.70 CB A98 A99 1.02% 30 128 RCP 844.10 842.80 859.70 15.60 CB B1 B2 1.07°'0 15 28 RCP 821.00 820.70 824.50 3.50 CB A10 A11 0.71% 42 28 RCP 827.50 827.30 851.05 23.55 CB A99 A100 1.08% 30 74 RCP 842.70 841.90 858.30 15.60 CB B2 B3 2.78% 15 54 RCP 820.60 819.10 824.50 3.90 CB A100 A101 1.00% 30 130 RCP 841.80 840.50 857.50 15.70 DI A11 Al2 0.76% 42 92 RCP 827.20 826.50 851.05 23.85 CB B3 B4 9.06°'0 15 32 RCP 819.00 816.10 823.58 4.58 CB A101 A102 1.00% 30 140 RCP 840.40 839.00 857.50 17.10 DI B4 B5 8.75% 15 40 RCP 816.00 812.50 824.00 8.00 CB A102 A103 1.06% 30 132 RCP 838.90 837.50 859.10 20.20 DI A50 A51 1.06% 12 104 RCP 845.90 844.80 849.40 3.50 DI A103 A9 7.04% 30 98 RCP 837.40 830.50 856.00 18.60 DI A51 A52 1.00% 15 100 RCP 844.70 843.70 849.40 4.70 DI B30 B3 1.00% 15 28 RCP 820.08 819.80 823.58 3.50 CB A52 A53 1.00% 15 100 RCP 843.60 842.60 849.40 5.80 DI A920 A92 1.00% 15 40 RCP 855.70 855.30 859.20 3.50 CB A53 A5 9.13% 15 104 RCP 841.00 831.50 849.40 8.40 DI C1 C2 3.33% 36 210 RCP 847.00 840.00 856.00 9.00 FES A950 A95 1.00% 15 20 RCP 851.80 851.60 855.30 3.50 CB A510 A51 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI C3 C4 1.16% 54 86 RCP 804.00 803.00 822.00 18.00 HW A960 A961 1.00% 15 140 RCP 856.00 854.60 859.50 3.50 DI A520 A52 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A961 A962 1.15% 15 26 RCP 854.50 854.20 859.50 5.00 DI D1 ❑2 4.27% 15 110 RCP 834.50 829.80 836.50 2.00 PE A962 A963 7.58% 15 66 RCP 854.10 849.10 860.00 5.90 DI A530 A53 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A963 A96 7.22% 15 18 RCP 849.50 848.20 858.90 9.40 CB A80 A8 1.96% 12 56 RCP 846.40 845.30 849.40 3.00 DI A990 A991 2.50% 15 4 RCP 851.90 851.80 855.40 3.50 CB A991 A1000 A99 A1001 7.55% 1.02% 15 12 102 98 RCP RCP 851.70 846.40 844.00 845.40 855.40 849.40 3.70 3.00 CB DI LEGEND N01ES CB CATCH BASIN, SEE DETAIL SHEET X TOP ELEVATION IS TOP OF RIM FOR A1001 A1002 1.06% 12 104 RCP 845.30 844.20 849.40 4.10 DI DI DROP INLET, SEE DETAIL SHEET X MANHOLES, TOP OF GRATE FOR YARD MH MANHOLE, SEE DETAIL SHEET X INLETS, AND FINISH GRADE FOR A1002 A1003 A1003 A1004 1.00% 1.00% 12 15 100 100 RCP RCP 844.10 843.00 843.10 842.00 849.40 849.40 5.30 6.40 DI DI CLEANOUTS. PE PLAIN END PIPE. A1004 A1005 1.04% 15 48 RCP 841.90 841.40 849.40 7.50 DI SO STORMWA TER CONTROL MEASURE OUTLET, SEE DETAIL SHEET X ALL FES INLETS & OUTLETS SHALL BE A1005 A1006 1.00% 15 40 RCP 841.30 840.90 850.00 8.70 DI 40 RCP. A1006 A10 1.11% 15 36 RCP 840.80 840.40 849.50 8.70 DI A2 STRUCTURE I.D. NUMBER GRAPHIC SCALE 0 20 40 8o 18C ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: ++1Y1 / %A CAP SEAL 3. ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: GRADING PLAN AREA 2 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number CO3.02 P // / 94 7g2 PERMANENT OUTLET - - / / / // \ _ �'-� - - - / I WOODED24 B4 A _ N _ MATCHLWE AREA 4 _ L-1S W1�,� 14= 826 _ /' Q% s STONE (22" THK) 4/ AREA 3 -g2 ' FES804 -/ y \ \\ C10 / PERMANENT OUTLET � � � B5 PROTECTION FES I / L=16W14, W2=18. ' CI B =TO3WOOED z � �'- --- -- ---------- \ \ \ \ 8 �n \ \ \ \ I / C3 --�A _ _ �/ C4 HEADWALL_ ---------_ \ \\ \\ 812 PERMANENT OUTLET -__ -- 820 _ , �n - =36'-W=9 Ct,4Sf1- --- - \ _-_ ------------------- \\\\\\ 816 -� � 820 8/8 808 ' �- /y%------='/ M ENT TL / / ' 830 X \ 7" S7Dr SEftt*CK TT \ \ l PC INV / / / FES 100- 50 CAASS16 S22'�TH X ;------ + -- 834-85 _ 0.40 \820 `� 1 \ ///'� //////' /' x 7r- - _ 8 \ \------------- _ 8�6 / _ \ I� //J , // // // �� _ 849.40 ----- / \ 4 \ �\ /'' A1001-------------- � I - A 5 0 -848 \ \ 8 \ \ \ I (II II / 4 r '-84 ��� --�- - x // I -8 / co \ � 1 �aDED 1 1 1 1 I •III /ll// / / / ,r // / / � I �- / _ - -__ ___ _� -- 5 � -- � _ \\\ WnoDEDs?\\\ \ \\\ \\\\ NJ/ / / / �/ I I /� �l r // I// / x I I / / // / /// / I i / I I - / kIf a/ Sip A510-- �\ 20' PUBLIC _ WATERLINE / II / - x I ' ' / / EASEMENT I � / 110 WET BOND / PPE '26.5' / I 850.45 - \ \ _ - 850.40 x - E -- E-- E E - - - E x A520 ( 1 \ \ 850.00 I I - - - - - - - -------------- -- - - - -= �/�/ ,$ _ ,/ / / -•' I /' A1003 t 851.05 A52 1 x \ I I I I /� / / ---- ,-- ,---------T----- ------_r_a26�// //, OD DRIVE FOREB�;� i I I // I / / / I I 1\ �o-- KWOI / I I I I I 1 / j /� //� /'� / /// // / / / / --- x BA�'I I \ -�---- --- / I I I l/(l /r� , / ,g2$ / , l / , - ' I -----I------I----------�--- _�- -7�o° �I - ;� - x / l / / ' / / -T-;'. •� / / x / h /a5ti� / // ' / /� I j��/�'' /� 2�' /' - / /850.45 // �I x PERMAN NT OU 1 L l / 0 7/ •S/I/D/E S,ECK//// ,//// / ///�/ // // /�/// //� /�'�/�/// /l,/ ,�/% �//�i/ ///�✓/i%/���/ //,/// /j�`// 1/,�� / // / ' FEs '/ 1 I/ 1 / /�// / ✓/ / / II- Aioo4 / // /II ;�� ° SO " THK) A530 w x06/ A53 850.00lr� i'/ II m 20' PUBLIC A10/ 840WATERLINE A1005 / woD EASEMENT 4/X -/ / / / / / / / .x 85270T //--------- 5 , A9 / x X x- x i---__-_--- w / w w w w / - _ ------ ss1.2o Nwa]- - - - I x _ I ° 860.70 A1031 /� / / A4 I ,� `P ''' I AS A80 �' / ' A5 cP / 849.40 I _ 850.00 861.40 / / 860.90 / 859.25 - / " C / / I I �'\ 851.00 826IIj l� I / -' \ �� 20 PUBLIC / 860.40 1 1 \ \ \ \ \ J� WATERLINE / EASEMENT / 860.90 / / SS 859.50T A 103 x \ I I I 1 1 \ \ \\ \\ \\ \\ ✓ / / / / li / S_SS s5s.00 ss r A6 / /// \ / / / / �/ / 86o.20T SS // 849.40 / + I I AA �fL%V \ \R A\ / / / / / / I� /' _ _-- \ Cow 860.50T , / 851.00 �/ 850 / s s.00r ss /� x / /� _ ------ \860.25Tg--- GENERAL NOTES GRADING LEGEND 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE W17H ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS. 2. ALL SPOT ELEVATIONS INDICATED AT CURB AND GUTTER AND ARE DENOTED TO TOP OF CURB, UNLESS OTHERWISE SHOWN. 3. TOTAL DENUDED AREA = 30 AC 4. CONTRACTOR SHALL ADXST ALL EXISTING VAULTS, MANHOLES, STORM DRAIN STRUCTURES, CLEANOUTS, ETC. AS NEEDED TO MATCH FINISH GRADE. 5. ALL BACKFILL, COMPACTION, SOILS TESTING, ETC. SHALL BE PERFORMED BY THE OWNERS INDEPENDENT TESTING LABORATORY. (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION) 6. ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAIL ON SHEET C_ Z EXISTING VEGETATION WITHIN TREE PROTECTION AREAS SHALL REMAIN UNDISTURBED. UNLESS NOTED OTHERWISE. & ANY AND ALL LANDSCAPING AND EXISTING TREES & SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR UTILIZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 9. THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF -SITE 10. THE GRADING CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY STATE AUTHORITIES OR THE ARCHITECT. 11. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE MATERIALS GENERATED DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR OFF -SITE STOCKPILES AND/OR WASTE AREAS. 12. THE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.01 13. CONTRACTOR SHALL VERIFY ALL EXISTING ELEVATIONS WHERE NEW CONSTRUCTION JOIN OR CONNECT TO EXISTING PAVEMENT, CURB AND OTHER RIGID STRUCTURES NOTIFY ARCHITECT IF DISCREPANCIES OCCUR. m a� oU) EXISTING CONTOURS FINAL CONTOURS 270.4+ EXISTING SURVEY SPOT ELEVATION PPE: PERMANENT POOL ELEVATION 270.50T PROPOSED TOP OF CURB SPOT ELEVATION 270.50 PROPOSED GROUND/PAVEMENT ELEVATION 270.50TW PROPOSED FINISHED GRADE AT TOP OF WALL ELEVATION 270.508W PROPOSED FINISHED GRADE AT BOTTOM OF WALL ELEVATION 29 STORM STRUCTURE NUMBER EXISTING STORM DRAIN PIPE PROPOSED STORM DRAIN PIPE FD PROPOSED FOUNDATION DRAIN DISCHARGE LINE. SEE ARCH. PLANS FOR DRAIN PIPE LOCATIONS ALONG BUILDING WALLS. RD PROPOSED ROOF DRAIN TREE PROTECTION FENCE DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA UP STRM DN STRM SLOPE DIA. LENGTH MATRL I INV. INV. �TOPELEV.J DEPTH TYPE NOTES UP STRM DN STRM SLOPE DIA. LENGTH MATRL INV. INV. TOP ELEV. DEPTH TYPE NOTES UP STRM DN STRM SLOPE DIA. LENGTH MATRL INV. INV. TOP ELEV. DEPTHJ TYPE NOTES (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) Al A2 1.67% 18 6 RCP 833.20 833.10 837.30 4.10 CB A90 A91 1.00% 15 40 RCP 867.00 866.60 870.50 3.50 CB A1010 A100 6-34% 15 142 RCP 854.00 845.00 860.00 6.00 ❑I A2 A3 1.43% 18 14 RCP 833.00 832.80 837.30 4.30 CB A91 A92 5.00% 15 224 RCP 866.50 855.30 870.50 4.00 CB A3 A4 0.58% 24 224 RCP 832.70 831.40 838.10 5.40 CB A92 A93 3.80% 18 108 RCP 855.20 851.10 859.20 4.00 CB A1020 A1021 2-00% 15 50 RCP 856.00 855.00 860.00 4.00 ❑I A4 A5 0.69% 24 58 RCP 831.50 831.10 850.00 18.50 DI A93 A94 1.36% 18 22 RCP 851.00 850.70 855.00 4.00 CB A 1021 A 102 2-71 % 15 70 RCP 854.90 853.00 860.00 5.10 ❑I A5 A6 0.70% 30 100 RCP 831.00 830.30 849.40 18.40 DI A94 A95 1.11% 24 36 RCP 850.20 849.80 855.00 4.80 CB A6 A7 0.76% 30 92 RCP 830.20 829.50 849.40 19.20 DI A95 A96 1.04% 24 222 RCP 849.70 847.40 854.50 4.80 DI A1030 A1031 2.50% 15 60 RCP 856.50 855.00 860.00 3.50 ❑I A7 A8 0.71% 30 84 RCP 829.40 828.80 850.00 20.60 DI A96 A97 1.00% 30 140 RCP 846.90 845.50 859.00 12.10 DI A1031 A103 1.33% 15 180 RCP 854.90 852.50 858.50 3.60 ❑I A8 A9 0.75% 30 80 RCP 828.70 828.10 850.00 21.30 DI A97 A98 1.02% 30 118 RCP 845.40 844.20 861.40 16.00 CB A9 A10 0.71% 42 56 RCP 828.00 827.60 852.70 24.70 CB A98 A99 1.02% 30 128 RCP 844.10 842.80 859.70 15.60 CB B1 32 1.07°'0 15 28 RCP 821.00 820.70 824.50 3.50 CB A10 A11 0.71% 42 28 RCP 827.50 827.30 851.05 23.55 CB A99 A100 1.08% 30 74 RCP 842.70 841.90 858.30 15.60 CB B2 33 2.78% 15 54 RCP 820.60 819.10 824.50 3.90 CB A100 A101 1.00% 30 130 RCP 841.80 840.50 857.50 15.70 DI A11 Al2 0.76% 42 92 RCP 827.20 826.50 851.05 23.85 CB B3 34 9.06°'0 15 32 RCP 819.00 816.10 823.58 4.58 CB A101 A102 1.00% 30 140 RCP 840.40 839.00 857.50 17.10 DI B4 35 8.75% 15 40 RCP 816.00 812.50 824.00 8.00 CB A102 A103 1.06% 30 132 RCP 838.90 837.50 859.10 20.20 DI A50 A51 1.06% 12 104 RCP 845.90 844.80 849.40 3.50 DI A103 A9 7.04% 30 98 RCP 837.40 830.50 856.00 18.60 DI A51 A52 1.00% 15 100 RCP 844.70 843.70 849.40 4.70 DI B30 33 1.00% 15 28 RCP 820.08 819.80 823.58 3.50 CB A52 A53 1.00% 15 100 RCP 843.60 842.60 849.40 5.80 DI A920 A92 1.00% 15 40 RCP 855.70 855.30 859.20 3.50 CB A53 A5 9.13% 15 104 RCP 841.00 831.50 849.40 8.40 DI C1 C2 3.33% 36 210 RCP 847.00 840.00 856.00 9.00 FES A950 A95 1.00% 15 20 RCP 851.80 851.60 855.30 3.50 CB A510 A51 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI C3 C4 1.16% 54 86 RCP 804.00 803.00 822.00 18.00 HW A960 A961 1.00% 15 140 RCP 856.00 854.60 859.50 3.50 DI A520 A52 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A961 A962 1.15% 15 26 RCP 854.50 854.20 859.50 5.00 DI D1 ❑2 4.27% 15 110 RCP 834.50 829.80 836.50 2.00 PE A962 A963 7.58% 15 66 RCP 854.10 849.10 860.00 5.90 DI A530 A53 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A963 A96 7.22% 15 18 RCP 849.50 848.20 858.90 9.40 CB A80 A8 1.96% 12 56 RCP 846.40 845.30 849.40 3.00 DI A990 A991 2.50% 15 4 RCP 851.90 851.80 855.40 3.50 CB A991 A99 7.55% 15 102 RCP 851.70 844.00 855.40 3.70 CB LEGEND NOTES CB CATCH BASIN, SEE DETAIL SHEET X A1000 A1001 1.02% 12 98 RCP 846.40 845.40 849.40 3.00 DI TOP ELEVATION IS TOP OF RIM FOR A1001 A1002 1.06% 12 104 RCP 845.30 844.20 849.40 4.10 DI DI DROP INLET, SEE DETAIL SHEET X MANHOLES, TOP OF GRATE FOR YARD MH MANHOLE, SEE DETAIL SHEET X INLETS, AND FINISH GRADE FOR A1002 A1003 A1003 A1004 1.00% 1.00% 12 15 100 1DO RCP RCP 844.10 843.00 843.10 842.00 849.40 849.40 5.30 6.40 DI DI CLEANOUTS. PE PLAIN END PIPE. A1004 A1005 1.04% 15 48 RCP 841.90 841.40 849.40 7.50 DI SO STORMWA TER CONTROL MEASURE OUTLET, SEE DETAIL SHEET X ALL FES INLETS & OUTLETS SHALL BE A1005 A1006 1.00% 15 40 RCP 841.30 840.90 850.00 8.70 DI 40 RCP. A1006 A10 1.11% 15 36 RCP 840.80 840.40 849.50 8.70 DI A2 STRUCTURE I.D. NUMBER GRAPHIC SCALE 0 20 40 8o ( IN FEET ) 1 inch = 40 ft. 18C Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: SEAL - L© •x'r� A. 1 90017- ISSUE LOG Distribution Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Date No. Drawing Title: GRADING PLAN AREA 3 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number CO3.03 GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL TOWN OF LEWISVILLE & NCDOT STANDARDS & SPECIFICATIONS. 2. ALL SPOT ELEVA71ONS INDICATED AT CURB AND GUTTER AND ARE DEN07ED TO TOP OF CURB, UNLESS OTHERWISE SHOWN. 3. TOTAL DENUDED AREA = 30 AC 4. CONTRACTOR SHALL ADXST ALL EXIS71NG VAULTS MANHOLES, STORM DRAIN STRUCTURES, CLEANOUTS, ETC. AS NEEDED TO MATCH FINISH GRADE. 5. ALL BACKFILL, COMPACTION, SOILS TESTING, ETC. SHALL BE PERFORMED BY THE OWNERS INDEPENDENT TESTING LABORATORY. (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION) 6. ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAIL ON SHEET C_ Z EXIS71NG VEGETATION W17HIN TREE PROTECTION AREAS SHALL REMAIN UNDISTURBED. UNLESS N07ED OTHERWISE. & ANY AND ALL LANDSCAPING AND EXISTING TREES & SHRUBS TO REMAIN WHICH ARE DAMAGED DURING DEMOL17ION OR CONSTRUC71ON SHALL BE REPLACED BY THE CONTRACTOR UTILIZING A LICENSED LANDSCAPE CONTRACTOR AT NO ADDI 7IONAL COST TO THE OWNER. 9. THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF -SIZE 10. THE GRADING CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY STATE AUTHORITIES OR THE ARCHITECT. 11. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE MATERIALS GENERATED DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR OFF -SITE STOCKPILES AND/OR WASTE AREAS. 12. THE CROSS -SLOPE ON ALL SIDEWALKS SHALL BE A MAXIMUM OF 2.01 13. CONTRACTOR SHALL VERIFY ALL EXISTING ELEVATIONS WHERE NEW CONS7RUC71ON JOIN OR CONNECT TO EXISTING PAVEMENT, CURB AND 07HER RIGID STRUCTURES NOTIFY ARCHITECT IF DISCREPANCIES OCCUR. E U Q- Q4 m a� oU) GRADING LEGEND EXISTING CONTOURS FINAL CONTOURS 270.4+ EXISTING SURVEY SPOT ELEVATION PPE: PERMANENT POOL ELEVATION 270.50T PROPOSED TOP OF CURB SPOT ELEVATION 270.50 PROPOSED GROUND/PAVEMENT ELEVATION 270.50TW PROPOSED FINISHED GRADE AT TOP OF WALL ELEVATION 270.508W PROPOSED FINISHED GRADE AT BOTTOM OF WALL ELEVA71ON 29 STORM S7RUC7URE NUMBER EXISTING STORM DRAIN PIPE PROPOSED STORM DRAIN PIPE FD PROPOSED FOUNDATION DRAIN DISCHARGE LINE. SEE ARCH. PLANS FOR DRAIN PIPE LOCATIONS ALONG BUILDING WALLS. RD PROPOSED ROOF DRAIN TREE PROTECTION FENCE r i \ 7s.. \ \ \ _ m ' �\ \� "� b PERMANENT OUTLET Z ti PR07EC71ON o� \ �\ �. L=8, W=4,CLASS 2 l FI D �' \ \ \ _ STONE (22" INK) \ \ BENCHMARK - TOP OF OPERATING BOLT 821.29 1 sE Teq \ e �\ \ �� 7058 BMFHTOPNUT \ \ \�00 I \\ \ 01 00 --- CP CP �, CD -4' ` -�V 0 I / / I 20' PUBLIC'ge (60'/t'/1ijj/� )DIQQ^ '-=�'C� WATERLINE EASEMENT / I / / / q,`4' / / / E�Z 29 E CO .. , / / _ PERMANENT OUTLET - - / / / / // \ - - \ f / 792~ WOODED 4 MATCHLINE AREA 4 -826' ', '`�� _ g,�'' ' s -CLASSL/ STONE (22" 7HK) AREA 3 � FES804 1'I I \ \ SS SS 7�_SS SS SS 1�1 �S $0 SS \ \ l J \ \\�� _ _ _ \\ _SS/ / // / / / / / / /� � � / / / / � �J/ / / �/ �`� � , got \ ASS /-- \ / ,� / / / / / / / / / / / / / / / / �� / B04 wLLJr �--- / / / / / / / / / / / - -� _ ' �//// // // // / / / // / / / // /_-- Sob // �_ - /�� / / / / // // // // // / / / / %�\�/ //• / / / / // Sob 810 /r 1 \\\\\x -- 812 - \ \\�\\\\�\\�• I I•• I III 814 \V . 800 i _ I \\`.- ' i/ r\ f// /"/ --_' // / / // / •/ / \/ / j�i/ / //// /' / ice' /- -/' - \\ \ \ \ \ \ \ \ \ \ \ \ \ _ J _ _ _ a \ \ -J /�\\\\\\\\\CD 100 YEAR 500 YEAR WOODED 820 \ \\ \ \ I \ \\\\ 822 cp -----� v / / / / / �� /' ---- 824 \\ \\ \ \I \ i ------ / l-L__--�-/ / DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE DRAINAGE STRUCTURE SCHEDULE STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA STRUCTURE NO. PIPE PIPE PIPE PIPE UPPER LOWER UPSTREAM STRUCTURE DATA UP STRM DN STRM TOP ELEV. DEPTH TYPE NOTES UP STRM DN STRM TOP ELEV. DEPTH TYPE NOTES UP STRM DN STRM TOP ELEV. DEPTH TYPE NOTES SLOPE DIA. LENGTH MATRL INV. INV. SLOPE DIA. LENGTH MATRL INV. INV. SLOPE DIA. LENGTH MATRL INV. INV. (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) (IN) (LF) (FT) (FT) (FT)(1) (FT) Al A2 1.67% 18 6 RCP 833.20 833.10 837.30 4.10 CB A90 A91 1.00% 15 40 RCP 867.00 866.60 870.50 3.50 CB A1010 A100 6.34% 15 142 RCP 854.00 845.00 860.00 6.00 ❑I A2 A3 1.43% 18 14 RCP 833.00 832.80 837.30 4.30 CB A91 A92 5.00% 15 224 RCP 866.50 855.30 870.50 4.00 CB A3 A4 0.58% 24 224 RCP 832.70 831.40 838.10 5.40 CB A92 A93 3.80% 18 108 RCP 855.20 851.10 859.20 4.00 CB A1020 A1021 2.00% 15 50 RCP 856.00 855.00 860.00 4.00 ❑I A4 A5 0.69% 24 58 RCP 831.50 831.10 850.00 18.50 DI A93 A94 1.36% 18 22 RCP 851.00 850.70 855.00 4.00 CB A 1021 A102 2.71 % 15 70 RCP 854.90 853.00 860.00 5.10 ❑I A5 A6 0.70% 30 100 RCP 831.00 830.30 849.40 18.40 DI A94 A95 1.11% 24 36 RCP 850.20 849.80 855.00 4.80 CB A6 A7 0.76% 30 92 RCP 830.20 829.50 849.40 19.20 DI A95 A96 1.04% 24 222 RCP 849.70 847.40 854.50 4.80 DI A1030 A1031 2.50% 15 60 RCP 856.50 855.00 860.00 3.50 ❑I A7 A8 0.71% 30 84 RCP 829.40 828.80 850.00 20.60 DI A96 A97 1.00% 30 140 RCP 846.90 845.50 859.00 12.10 DI A1031 A103 1.33% 15 180 RCP 854.90 852.50 858.50 3.60 ❑I A8 A9 0.75% 30 80 RCP 828.70 828.10 850.00 21.30 DI A97 A98 1.02% 30 118 RCP 845.40 844.20 861.40 16.00 CB A9 A10 0.71% 42 56 RCP 828.00 827.60 852.70 24.70 CB A98 A99 1.02% 30 128 RCP 844.10 842.80 859.70 15.60 CB B1 32 1.07°'0 15 28 RCP 821.00 820.70 824.50 3.50 CB A10 All 0.71% 42 28 RCP 827.50 827.30 851.05 23.55 CB A99 A100 1.08% 30 74 RCP 842.70 841.90 858.30 15.60 CB B2 33 2.78% 15 54 RCP 820.60 819.10 824.50 3.90 CB A100 A101 1.00% 30 130 RCP 841.80 840.50 857.50 15.70 DI A11 Al2 0.76% 42 92 RCP 827.20 826.50 851.05 23.85 CB B3 34 9.06°'0 15 32 RCP 819.00 816.10 823.58 4.58 CB A101 A102 1.00% 30 140 RCP 840.40 839.00 857.50 17.10 DI B4 35 8.75% 15 40 RCP 816.00 812.50 824.00 8.00 CB A102 A103 1.06% 30 132 RCP 838.90 837.50 859.10 20.20 DI A50 A51 1.06% 12 104 RCP 845.90 844.80 849.40 3.50 DI A103 A9 7.04% 30 98 RCP 837.40 830.50 856.00 18.60 DI A51 A52 1.00% 15 100 RCP 844.70 843.70 849.40 4.70 DI B30 33 1.00% 15 28 RCP 820.08 819.80 823.58 3.50 CB A52 A53 1.00% 15 100 RCP 843.60 842.60 849.40 5.80 DI A920 A92 1.00% 15 40 RCP 855.70 855.30 859.20 3.50 CB A53 A5 9.13% 15 104 RCP 841.00 831.50 849.40 8.40 DI C1 C2 3.33% 36 210 RCP 847.00 840.00 856.00 9.00 FES A950 A95 1.00% 15 20 RCP 851.80 851.60 855.30 3.50 CB A510 A51 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI C3 C4 1.16% 54 86 RCP 804.00 803.00 822.00 18.00 HW A960 A961 1.00% 15 140 RCP 856.00 854.60 859.50 3.50 DI A520 A52 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A961 A962 1.15% 15 26 RCP 854.50 854.20 859.50 5.00 DI D1 ❑2 4.27% 15 110 RCP 834.50 829.80 836.50 2.00 PE A962 A963 7.58% 15 66 RCP 854.10 849.10 860.00 5.90 DI A530 A53 1.04% 12 48 RCP 847.00 846.50 850.00 3.00 DI A963 A96 7.22% 15 18 RCP 849.50 848.20 858.90 9.40 CB A80 A8 1.96% 12 56 RCP 846.40 845.30 849.40 3.00 DI A990 A991 2.50% 15 4 RCP 851.90 851.80 855.40 3.50 CB A991 A99 7.55% 15 102 RCP 851.70 844.00 855.40 3.70 CB LEGEND N07ES A1000 A1001 1.02% 12 98 RCP 846.40 845.40 849.40 3.00 DI CB CATCH BASIN, SEE DETAIL SHEET X TOP ELEVATION IS TOP OF RIM FOR A1001 A1002 1.06% 12 104 RCP 845.30 844.20 849.40 4.10 DI DI DROP INLET, SEE DETAIL SHEET X MANHOLES, TOP OF GRATE FOR YARD MH MANHOLE, SEE DETAIL SHEET X INLETS, AND FINISH GRADE FOR A1002 A1003 A1003 A1004 1.00% 1.00% 12 15 100 100 RCP RCP 844.10 843.00 843.10 842.00 849.40 849.40 5.30 6.40 DI DI CLEANOUTS. PE PLAIN END PIPE. A1004 A1005 1.04% 15 48 RCP 841.90 841.40 849.40 7.50 DI SO STORMWA TER CONTROL MEASURE OUTLET, SEE DETAIL SHEET X ALL FES INLETS & OUTLETS SHALL BE A1005 A1006 1.00% 15 40 RCP 841.30 840.90 850.00 8.70 DI 40 RCP. A1006 A10 1.11% 15 36 RCP 840.80 840.40 849.50 8.70 DI A2 STRUCTURE I.D. NUMBER GRAPHIC SCALE 0 20 40 8o 18C ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: ',1Y1 %A CAP SEAL 3 - •. • • Or, - 1r© •x'r+ A ,. A. ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: GRADING PLAN AREA 4 & AREA 5 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number CO3.04 0) z 0 0 w J Q P z It 0 0 U 0 0 U 6) F- w w U) F- 0 J d 6 U 0 0 0 0 a) 70 5 0 0 c 0 2 0 A) 0 0- ti 0 N 'w > I_ 0 a U Q M LL N I a) M Mo C N 0)r,: c ?: 0- \ I \ I / / / / / / - / WELL I i \ i / W WELL - ' \ so9 oB'22"w \ I \ 11 I II 1 \\ \ \ \ \ \ �� J� / / / / / / / i , I / F71 - I / / / / / i , I o_ -11 -_ // /-\ \ / \ \ \ "�/ / / / / / / / / // / // 1 1 o i oMA1L�)C __/ / \ / 3.56' Tie \ I I \ 1 \ \ \ \ \ \ TEMP. / / / // / / / / / / / / / / a62 i i I W i / / 1-1 / / / q / _ - / \ / %" Iron - \ I 1 1 \ \ SKIMMER & / / / / / / / / / / -- - --- E - E --- E --- E ---+ E rt- �i- E --- E --- i E - - --- E --- E --� E -- I _ / J / Ex. 2"Iron 60 \ I I \ BARREL / / / / / / / / / / ___--/ I I 1 �' // � / / �� /-' / -� " ENTIMA UN \ LC A 4 / / / / / � / / // / � // �'- i I � ��/ \ / i // //�'REBAR / I //� / - `\ / ' L--- ---- S893313 _ 101.96 ________ ___ - N88'4T07"W I0.>:39 L - � -/ ----------- 1 L� q �' / / / / / / / // � --------------------------------------- 3 " - 3 " 7� S88'49'13"W 1.52' I 1 / / / 41.3 ' I I I \ \' 1 I EMERGENCY / / / / / / / _ - - - - - - GRAVEL DRIVE / BENT IgON M BAR 5 / / y / / / / ' \ - - - - - - 1 I I I EMERGENCY I I I SPILLWAY/WEIR / / 1-1 / \----------- _ -- --- 86 // -1,/ / /t RON / I / I '�/ // 1� / I SPILLWAY/WEIR I \ I / / / / ------------------------------ - \ - - - - - -- - ------------------�� �/ __- --- --/ g 850 - --- ///// ----- I / / / < / I 58 // I / // 1 -_ - _ I11I / I \ I, I l / I 1 / (/ I _848 - --- '' I /' / �/ I / ��- / \ III I I I l /BAFF(IE I //� "I \ �/ 1-1 /-_ / _--I- ,�, _� I/// -- // ___ 1 I I I I1__IJI 6' ( I I / to I I I /' /� \ ---� /.- /// / //! I i J - 846 ----- J� I I I ^ i \\ 1 I t l B_F��_ � I I \ __---_-_-_' / / �� -- --- f I I 1 1 I I I / \ - - - � 5 '_DtXE POWER CO. _ 844 - / W I �BALLFlEI I \� 7SSB-5 i I I / / \ �-_ // // // /- / / � //RIGHT-OF-WAY - /--_ _ - L__O�� N `1 o ro 1 I \ �- I I ' 1 _ _____� - - / / / / / / / / / DEED BOOK ,16 � PAGES-798 _ _ , _ --- � in' Q Q 1 N / I I I 1 I I �M1FFL� I I I / ' \ 1 - ---- / /// -_ /// l / // / r/ (LOT � ./BLOCK �F15) J/__\-- 8A2 p --- -/ of ` I I \ \BAF�L I q I 838-- I I I\ '/ '/ 1 ///^ /�/ //' /// �' // // -_/ /// /� \_/ 84-_------- - - W -- Q Q Z I1. II I 1 // / / / / / ,\ // 1`// )\-// /// // _ --1 ,�,"I �_ � a / I 1 I I I \ \ j/ / / // // I\- /\ // - - / / ---J--449 / 6 / / l B FLU I I I I I I I TSSB-5 / / / / / / / / / / - / / � 1 - - - /� /� j / I 01 I I I I I I I I \ I // �i I DRAINAGE AREA: 2.4 AC // /// // // /'----/ I-' /// / / I-\ /) N / / // /_ - r\ --- ----/ \ / / Z / / / / I III I I I I \\ ( / / DISTURBED AREA: � 2.4 AC � � / -' / / / / / / / / / �- ) ✓ /' / / / J - - J/ , - - - - // U /� / / I) I I I \ / / VOLUME REQUIRED: 4,320 CF /�- /// /, // // // // // // / I \ I\v/ // // / \\� 830 ,� f \ 11 / / -� I J / SURFACE AREA REQ: ` 1,865 SF / / / / / - / / ✓ - / / /Q / / 1 16 � / I I I I I / / I BOTTOM DIMENSIONS: ` 60'Lx30'W / / - - - - - - - / / / WDOOT / / / / � i / / -_ - -_ ' / / l ` /� \ / / J / \ /' /,_' ,� / � \-_ _� I ",\--- - //I1 / W / / / I DIV-5 I I l / / l BOTTOM ELEV. 38.0' -� /-� /// // /'/ / // // ) /, / / ^_� ///' // /� / > c-- J I \ -- / / / / / I I I I / / / \ WEIR ELEV. 40.0' / / / / / / -- \ `� / \ / / �/ 1 r ---_-- \-//\ / / / / / ( \ \ / \ I - -V / o // // / / / �� I I I J ) I / ; lq \EMBANKMENT ELEV.• 8 .0' i$6� /// /// // // // // ��- /� M/ /�/ ) J l / Jr\/ I \ r - \,_-_ - / 1 1 ON ^ // / // // / / DIV-3 I // / l / l / / IMMER DIAMETER. 2� / __- � / / � / � I\� I I -- 1_ co - � - - / / / / / 4 / / / / l / // RIFICE DIAMETER. 1.25 / _--- / / / / / / / ) r -�/ / -/\_/ / -J I f-\ \_--- a - / / / / / / I I - 1 �_ J \\ 1 - / / / / / � l 1 / / ( / , // / D AWDOWN TIME 3.04 Di ,6--- - - _ - - / _ / / ,- ~ / ✓ 1 / � / � �- - � I � / 1 / - -_� /� / 1 - / / DIV-2 / / / / l / / /Nl! gs\ , ,/ �,� �--� /// /�/ i' / ) \// // // / r� // \J /J I��-J ___/ \-J �----/ \ �- ''� gl / f / 13 / 1 I / / r� __ a / / / D RSION IT T / /• � y1 1 - / ' / / / / r _� ' 5 / // �� 1 �a // / / // / / L- / \0�/�l 58 - - - - �' / / // /J /J "I \ / J / / -11 1 82 - / / / I I- / / 1 / / / f - o � \ Tss6-2 4 / /6� / /858 - - - /1 / I �/ J(\/ J - 5 / / / IRECT PSTRE M � -� l � .�7 / / / � / / / \ / / / N� RUN- F AW FROM / / / _ / - - _ / / / \ ( r / / 818 - / / / / / - - / / / J �/ / -\ / - 1 / F - 1 / // i� ////// l / LA DIS BANCE AND / l l l / / _-_, � / // // / / j I \--J 1 '��// � r � /' ) \ \\/ -----/ � --_ / / / / / P OWDE OOM F16R / / / // / / // --' ® // // // // // / 1 __J I �/ /� I -\/ // \ �/ f_-- / / / / / �\ // ULVER INSTALLATION. I l )I / / / '' - _ '/ / / / 1_/ / / // / / i ` �\ / i \ - / / � / / -- I,/ / z z .L-J. / / z -�, - z // / / I 011 / / / old / / / / I I / / / ` / // /_/ / -/ / / / / / / J \� / \ I \v- / I '- - /I / / i � / 1' / / / / / / / --_ / - - / // - � / / / // /i ���/ \ / -_/' --' DIV-8 - o ^/ / / / / / / / / / / �� L // / // Z / /, // / I / / / / / �/ /// 54/ // // �-_ // // /, / // // // // \\`\ / 1 ( \ � 1 / // / �- �12 - ��-- / - / / _ / / / / __ / / / / / ,�, / / 1 \ / / ,,\� / -\/ / _ / // // ( ____ /// // /� // // / // / / __1 11 /�__ /// /// // /�--/ /�//// / �// // /// // // // / // \} � // \ -I-- \ 1 \-Z ^// //' / / // =-� // / - / / \\ // // / i i -11 / / / / / \ \/ r' / / / g1p J / / / \ �\ - __ TEMPORARY SKIMMER IMENT BAST / / \ // / // -_- / / /` \� _ / / // / / // / \ \_\�/ � \ �� 1-1 / // / - 808 --- - _ / \ \\ - DIV-5 TSSB-4 -/ / / / -� �1 / // _a52 // / / /�/ \- // / / / / / / 1/ / // - _ - = \z.\ DRAINAGE�A: 4.1,A� / / / / / / _ / / / 5 \ \ / / / / / / ) // / / / / / ,,-�, - _ - /_ = _ - �\ TEMPORARY // / / // / /// //- / / // / // (\� / - // // / / // / / s // // __� // /�_---_----i� �- -- \\ - V OLUME_ R UUIRED: 60 CF - II / - / l / / / z / / / / / �// _� -�_ -_ \ TIMBER - - / / / i// / / // / / _, / / / \\v/ _// / 1 // / // // / / / - // /�_ __ - URF1fCE AREA REQ: - 3r185 SF / / / / I - - _ - - - - J - BOTTOM DIMENSIONS' 64 Lx30'W - _ / / / / / / / / - / / 1 r J / 1-1 / / / / / / / - / / / / / / / / // //ii i - - - - - BRIDGE AT / l / / / / / / / / / / 1-1 / / / // // /. _�- - - �� ING - / / / C,� I / / / 85 / / / / / / / /, // // // // // / j / /// ��/iGi%�'- _ _ TOII�ELEV. 83110` / tiG�� / � I / / �� __-_-- WEIR ELEV. --' 841.0' --� / /� \ I l / // / /// /// /l � / /// // \) ' `/\ /// /// / / /// 1.1 /.Ji�jj--- i-� /� --- ----- DIV-- - - E� -- NKM�NT ELEV.: � 843A' / l// I// \ � I / /// / / / / / / / / / / S / / /, // / / / �/ / ii� /i�) ----- - I I 1 / / / / / / / /i - a� DIV 4 ,1 �� - - - SKIMMER DIAMET 2.0" / / '\ / / / / / / / / /i / /� / _ 2' _ _ _ - - - ORIFICE -DIAMETER: 1.25 \ I ' / / / / / // %�%�� / � / 1ti __�_ ~ 85 --85 i -- DRAWDOWN TIME: �341 DA / / ,' / // / /'a / / l / ) / j // /� // �/ /' /// �ii//' // /ice-------_-- / / ----- ----- _ ---- 1 / __------- - I / I 1 / / /// // / l v �� // / �/ // j// j -- �/ /� - - --F------- ----- / / / I / / � / \ _/ � / / / / / /i / /i8 i __--- -856- - _-� , , / �__ � I / / / / \ / / / / //i//- - / �- - -- / i / / -- o \ I I / / // / / / / J� � / -_ / �'�/ /�//� // / /// �_____ ------- ------ _ - -860- -- --- / / \ \ \ I / / // // w / ♦ / / DIV-8 / / i�//ij . /- / // / -16\�, __ � - _� 1 I -' -11 // / , / - ` \ \ / / ^ -n / /J / ////// -� - - / / / / / / / _ N-�-- ,�/' / //� _ \\ \ \\ / / // // ♦ / / ♦-�/ TSSB-1 / / / / / �� d/� --- / -_/ / / 0� --'- --- ------ __- a 1 862-------- /'�\ ,/ / ``��__ \ \ \ l l / // //' l ♦,y / ♦ / ♦ / / / / // �� // % '�i/' �\-_ _/__-_- / // �a2 -__ ----- - --� // /% �/ ,/� �\ d&1 \ \ \\ / / /// �// 8 / /♦"� / / ♦ / �: ` / `\-_"/�/, / ,-,\ - / / // / lL ------------ DIV-4 // / /' /� 8 \ \ \ \ l / / // // ♦ 11� ! / / / / /' -- ///�i/I \\ \ \ / / / 866-------- - ,/ \ � \ \ \ \ l ( / // _-- 4 / / ♦ / \ / / I,- / . /�/ /�� \ / / / L� _- rDIVERSION DITCH TO // // \\ \ \ \ \\ \\ I ' // // __--------- -- p / / � // / ) Ji/// //i �� / `\ \� -� / / // / /-,----- _--J DIRECT UPSTRE�b_- \ \ \ \ \ / / /--- - / / i - 1 / / / / � � I--- / / / �ti / (i \ - l / / TEMP. / // >-- / / �---- \ - 868 - OFF fly Y FROM l \ / L - 1 LAND DISTURBANCE l // / /^\\��\ �,866\\\ \\ \\ \ \\ \ \\ ' // // /�'/-__-------- / / / SKIMMER & /// %i // 816 / / / / /--'C ������ / // // / /'! � \� � i / BARREL / � �// - - / / / / / � _ � / / � / \ \ \ \ J I / � - - / / EMERGENCY /i /ii / / � -1-1 \ WOODED / / --� \ \ 68�\ \ \ \ \ l / / --- /1-1 SPILLWAY WEIR /i/ / p \ / / � _ \ \ - _- �_872-- \ I / / / // /// /// ----- - / /z / / / 11 /ii/ 82 / / / / \ \ / 1-1 / / I,- \ -1 B50 11 / \ \ \ / / / / / / / / /// /�i / / / \ \ \ / / // / /\ 3/ IRON / ,I, ', \ `\ \\ \ I l l / l l / / / / / /-/// - ,- / a�"/ // // �� '���zii��% / /_"--'���\ f /� // ( I I/ --- �\ `\ `\ \L/ /// //, / 32 -____ \----- -874 ,/ --__- 8j0 \ \ \ I I I / I / / / / - / / - //- - __ -_ __- 'cy - / I I I ( ,// / /� --_ //'/ \\a,/' -\\ \ \ \ 7) I I i / / / // / /// /// /�_-�/' //// /�/�/%/ ��� - -'j _ _ / / \\ -// / I \\ �, I--- \�� f / -// _-_834 �_-----���_ '/ '/// \\ \ \ I I / / / / // / /''' /// /// --_i / / DIV 7 /// //���%��/ ----- �/ J_`- �- �/ 1 \ \ \- `'J/ -_ \ \ 1 I / �- - / //// /- - - - - I - - -- - / X \ �' \\ I I I I / / / / / / / // _/ / - / /�' _ /�� �__----_ - TEMPORA�9 SKIMMER SEDIMENT BASIN -if- I \ I ��------- __-' / \ (>2 \ II f-�/ 4 1 1 , / / // / ; // // %� ,/ // 82 r 826 jA - t% _-- TS�S = ",� - I I - ----'_ - _ _ _ _ ,' // / 1 ( / / / / , G __=i __ - / / / - - --DRAINAGE AREAS ___61_ E / - - - /% �� \ DIV-7 \ I I / I / / / / � 1Z --- ---- - �- _ DIS76P REA:� 6. C\ --J I /, __--_- ---- 836- ,< / \ \ I I / I / / / / / / / / _ - - _ / -- _ _ VOLUME REQUIRED. -' 1143300 S� � - - / / / - - - - /'� / \ \-_-_-_\ \\\ \ I I I / DIV-6 / / / / � � / � // -- - -/ /------- - SURFACE A RE . 4,U3,SF\� � // / ,_ - -- ___--- _�- y1 �� ) / / / / / - _ _ _ - - - _ _ - - BOTTO�MENSIONS• \t iD'Lx50 / / / / %'� , - �� �Ir\ \ / / / / / I C \ �\y�� / � �_ ___-- � - _ _ ___� -_----- -- BOTTOM, ELEV �1\ 824�0� / / // // \�,'� v� \�� \ \\ \ l / / / / / \\ \ - --- - - i ------ -------------- WEIR ELEV.0' �\ \ / / / /- --- - ------ / / \ \ \ 1 / /-\ / / / I y _'� - � - - - - - _ - __ � __ - - BANKMENT EL 828�' \ `\ - - - / / / 838 - \ /// \ / / / I �j cP �- _ � p \ / / // \___ ,'�� /'�L I `\\ ���\ \\ \\ / // \ // LAIH / / / / / / 1 \ ��i)------- . - - - ___� -_-- J�� SKIMMER DIAMETER:\\ 2.0 \ \ / I / _--_ ORIFICE bbWETER: �.0" /% \ __� \ \ / \/ / / / / I I I / ) DIV-6 --- -__- ---------------\\ DRAWDOWN 314 DAYS \ ----- I / 1-1 \ wnonm \ / l l �.� / / / / l l / 1 ( - - DIVERSION DITCHI0_ - - - - - - - - - _ _ - \ \ - \ \ / / / /- I I \\ \ / / ) I �, / / / / / / / J i _ DIRECT UPSTREAM - ------------------ \\ \ \\ � \\ \� // // 4 I \ / / / / / I \J / / / / / / / / �___ RUN�F� AJyAX _ _ _ \ - 8 I ` \\-8�8\ \\ // / // // // / // // // l / // - __� LAND LAND DISTURBANCE------------- ------ \\_� `\ \`\ `\ `\ ) // \� \ \\ ) / // / // // I I \ / / / / / / � /----- _----- `__� - � �\ \\ �, "\ \\ CI-0 \\\\ _/_/' // \ \\ // / / / 1 \/ / / / / / //------' �/--------------- \ \ 1 \\ \ �---- / 80\ // // // / // // // /// / / % � (\ -// _ _ \\� \ \ \\ `\ \\ \ --- / - / 11 \`\ \ % // // // / // // // // \ ..* / \--- \11 ` � \ \ \\ � \ \\ ,� \\ /\ \ / / / / / // // // / �` //- ----- ----- �__� \__\` \ \ \ \ \\_ /� /-_- � / / / / \ / -/ \ \ \ / \ /- -� -f CO�b� �a / - _ 75' REAR SETBACK _ - - - \ �- \ - L Aso - \ 03 \` - �\ -- BAR=SETBACK ?/ / - \) / I � / � / /� //0 /�0 ��ti $60/ /// \\ //�- -`\ _- �- _--_---- 858 \\ ��` 8S� �`s� \ _\ \\\ aq0 // \ I / / / / / / 8 8 -\ ON = � I/ --- -- - �\ 856 \ \ \ \ 846 -_� 844-- ,_� 108 1" IRON \ - L l / / / / / - / 5 I 15'_ O G - ' ­- - :`- - /______� �� 977.02' - \` ` \ \ - \ - - - - : -- _ �_ __ - 836 ---AL X -- 1111111. _ - _f y - �_ ,589'St'1�''WW \ -� S�956"W 21_04' / / %"IRON 0.5 ' EIP /, V-- - - -'---------------- �S89�5-T�22"V-----//��\�� �-_\ ��-\ ----- ---__844 �_ a1"1 �\ \ I- \ / / / / / i `-- --- ---- \ - - - -_ / / / / / / / Tie \ ------ ------------------ 1 /----------- --------------------- - a / /', // I / /�--- III ----/ - -- - -- I ASPHALT DRIVE / I i --- _-- ` GRAVEL DRIVE L Q) l / / 1 ASHMONT F REST COURT \ / o �_ �I -------- ------------------G------------------------------1--------------------------------------------------------1----------------------------------------L- &j�I ,, - -�,'��---------------------------------- EDGE OF ASPHALT(TYP.) ��/ W --- W --- W % IRON `/ � (50' PUBLIC R/W) \ � QJ i I I � 1 �- I / I O� 3 6 \ / �m N I � WIRON 0.36' IRON :n , N ; SOUTH OF PROPERTY LINE Z � �� �o N N - - ® 9+23.60 Lu LEGEND EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN CONSTRUCTION SEQUENCE TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET _._ �� W� TEMP. INLET PROTECTION DEVICE % 0� SEE DETAIL SHEET -.- TEMP. DIVERSION DITCH / BERM SEE DETAIL SHEET _._ TEMP. SILT FENCE SEE DETAIL SHEET __ ® TEMP. REINFORCED SILT FENCE OUTLET SEE DETAIL SHEET -._ PERMANENT OUTLET PROTECTION SEE DETAIL SHEET _._ TCW TEMP. CONCRETE WASHOUT AREA Em SEE DETAIL SHEET TEMP. PLASTIC LINING, SEE TEMP. BASIN BAFFLES ON DETAIL SHEET _._ CD TEMP. CHECK DAM **moo SEE DETAIL SHEET -.- TEMP. COFFER DAM SEE STREAM CROSSING/CULVERT INSTALLATION DETAIL SHEET _._ 3iP TEMP. J-HOOK PROTECTION Lrl SEE DETAIL SHEET -.- TEMP. 17MBERIBRIDGE MAT SEE DETAIL SHEET _._ IEMP. SKIMMER SEDIMENT BASIN TSSB SEE DETAIL SHEET __ - - - - - EXISTING CONTOUR FINISHED CONTOUR .----..- TEMP. CONTOUR (TEMP. GRADES DURING CONSTR.) *a, TEMP. ROCK PIPE INLET PROTECTION . j SEE DETAIL SHEET _._ CHANNEL LINING SEE DETAIL SHEET . B TEMP. DEWATERING SILT BAG G SEE DETAIL SHEET -.- TEMP. SEDIMENT TRAP SEE DETAIL SHEET TREE PROTECTION FENCE SEE DETAIL SHEET _._ TCS TEMP. COMPOST SOCK, SEE DETAIL SHEET _._ 11TO& TEMP. COMPOST SOCK IN CHANNEL, SEE DETAIL SHEET -.- D TEMP. SLOPE DRAIN SEE DETAIL SHEET _ - � PROPOSED STORM SEWER PIPES = = = = = EXISTING STORM SEWER PIPES - - - - CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED. TEMPORARY COCONUT SLOPE MATTING SEE DETAIL SHEET 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISWLLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR ARCHITECT. 4. TOTAL DISTURBED AREA: 30 AC. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK STOPPAGE EACH DAY. SEE DETAIL SHEET C701. 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. 8. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UN71L ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE. 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. 14. ANY DEWATERING OF STORMA71LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS 16. CONTRACTOR SHALL USE 71RE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION ENTRANCE IS FOUND INSUFFICIENT. IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED THOSE ABOVE. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6.1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED W17H STRAW AND TACKED WITH ASPHALT. SELF -INSPECTION RULES SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. SLOPE & SURFACE STABILIZATION GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES. SEE SHEET C705. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED MINIMUM REQUIREMENTS INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS. INITIAL PHASE (SEE SHEETS C04.01-CO4.04) 1. INSTALL TREE PROTECTION FENCING. 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF LAND DISTURBING ACTIVITIES. 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT STORMWATER CONTROL MEASURES (SCM) DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. Z INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS IMMEDIATELY FOLLOWING GRADING. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL MEASURES. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND TEMPORARY STOCKPILES. 16. BEGIN ROUGH GRADING OPERATIONS 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT REQUIREMENTS. 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO TEMPORARY BASINS. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY ARE ESTABLISHED AT FINISH GRADE. 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETA TE STEEP SLOPES (GREATER THAN 6H.1 V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND COVER IS ESTABLISHED. 22. VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS AS SHOWN IN SLOPE AND STABILIZATION NOTES 23. INSTALL SILT BAG INLET PROTECTION ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. GRAPHIC SCALE 40 0 20 40 80 18C ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 2 71 01 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: INITIAL EROSION PLAN AREA 1 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.01 z 0 0 ry w J Q z 0 0 U 0 0 U H w w U) F- 0 J d U 0 0 U a� 70 5 0 0 c 0 U A) 0 d ti m a� oU) LEGEND TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET _._ TEMP. INLET PROTECTION DEVICE SEE DETAIL SHEET TEMP. DIVERSION DITCH / BERM SEE DETAIL SHEET TEMP. SILT FENCE SEE DETAIL SHEET ® TEMP. REINFORCED SILT FENCE OUTLET SEE DETAIL SHEET _._ PERMANENT OUTLET PROTECTION SEE DETAIL SHEET _._ TOW TEMP. CONCRETE WASHOUT AREA SEE DETAIL SHEET TEMP. PLASTIC LINING, SEE TEMP. BASIN BAFFLES ON DETAIL SHEET CD TEMP. CHECK DAM **moo SEE DETAIL SHEET TEMP. COFFER DAM SEE STREAM CROSSING/CULVERT INSTALLATION DETAIL SHEET _._ MP TEMP. J-HOOK PR07ECIION Lri SEE DETAIL SHEET TEMP. 17MBERIBRIDGE MAT SEE DETAIL SHEET _._ TEMP. SKIMMER SEDIMENT BASIN TSSB SEE DETAIL SHEET __ EXISTING CONTOUR FINISHED CONTOUR TEMP. CONTOUR (TEMP. GRADES DURING CONSTR.) TEMP. ROCK PIPE INLET PROTECTION j SEE DETAIL SHEET CHANNEL LINING SEE DETAIL SHEET B TEMP. DEWATERING SILT BAG SEE DETAIL SHEET -.- TEMP. SEDIMENT TRAP SEE DETAIL SHEET TREE PROTECTION FENCE SEE DETAIL SHEET TCS10100000001111 TEMP. COMPOST SOCK, SEE DETAIL SHEET _._ "O► TEMP. COMPOST SOCK IN CHANNEL, SEE DETAIL SHEET _._ D TEMP. SLOPE DRAIN SEE DETAIL SHEET _ _ PROPOSED STORM SEWER PIPES EXISTING STORM SEWER PIPES CONSTRUCTION LIMITS UNLESS 07HERMSE NOTED. TEMPORARY COCONUT SLOPE MA T17NG SEE DETAIL SHEET M�j I N _ - 00 4' //II I ASPHALT DRIVE I ✓ II - E - � \ I I I I 3/ "Iron I it i� (1.74) IN I I Y2"IRON S8933'24"W �- g" IRON 131.55' 164.94'Total IRON 3.56' %" Iron Ex. 2'Ir Co I II / i A I % N ti I� iI "" 160 i III I W Q Q GRAVEL DRIVE\ V m \ 3 96 -I 302 51-53E - _GRAV_ EL DRIVE - -_ -/N8-9 8'3-9 W N� rnJ"Iron JI I / / / //10.40' Te------------- 340.73' Tie Iron / GRAVEL DRVI 7- IR04 S895804'E 7_l 18" CDR T 3 3 74' / III �� ' � �. a / / ' / 28 MAP t � I II rn�11\IZ // // / / / // / / / / � I "W O p a z 8" UKN 28" • et.,$r • A•`;r // / / // / / // / // / // / / // ��� // / // / / // // // // / A 14 DIV-1 P�/�9' // �, �^ DIV-1 / / / �� �f-'>/ P/ '/°�2 IIICO BENCHMARK - TOP OF II /// / / / / // // // // // /// /// /// , DIV-1 OPERA 71NG BOLT 900.65 3160 BM TOPNUT I ��\ I a / / / / // / / / / / / / / / - - _ j II / WOODED / / / / � N89 7- -7 / //- - / - � /% _It � I'� GRAVEL DRI o II I\ O j /III / / / z / / / // /i/ // / / // / DIVERSION DITCH TO DIRECT UPSTREAM - - - - li L9nI�D o BAN _------ ���856IV II �I �&I 'AlCI \ 0)i1�1 I GRA VEL DRIVE ' I I o Mq 6" UKN-I III N II o -L GRAVEL DRIVE AXLE %%IRON S8948'07"E 3/ IRON -- -- - I 200.40' _ \ c-0 7' SIDE SETBACK ,� I96 0 l / IIII rn GRAVEL DRIVE z 4" CEDAR I I IMB 12" CHERRY 12" OAK c-i\ I I II v Ic 1" IRON S8943'19E- 7/8" IRON / I\ 1 CL IS I R 37.71' lie q I it 8 c-i I ^ 6 4- \\� I RUB ,' I I I I I 25' REASETBACK - \ \ II 18" CONC.I r I z o 54'43"W_ 1 " IRON 08 5443"W 7 8 - - - - - 892 I 2"Iron - _ /---------- - I I m w-JV8958'06"W`�r N893247"W - lU -s--- ^ 163.54' ��---------` 100.Ov�=---- - // E W 1 y 199 16 Z/ 89 896-------- - =_--------- -1=� cs 894-------- \ � _ _ _ � / 99.97' _ _� ` � S89 4758 � " �9.33 9 % "IRON 1� reON� -`-------------------- �_ a Y ~ F `---r ---- --- I // T - �- ASPHALT DRIVE rnl , -- \ -_----------- -- ASPHALT DEXTER 894 --- ll E _� E ''_ (-------___= 2g2p'� / E � � E --- E---�-`�-E- 896--= -_ E�------- 896 65 p � II S8�'Sv�-E -- � I--�8938z'S E-----------------0582s�"E- -- � rn 2.7 " IRON ��1�9 310.11' G r 11 N � m I I I I i 11 II oo I �i l EROSION CONTROL GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISVILLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR ARCHITECT. 4. TOTAL DISTURBED AREA: 30 AC. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK STOPPAGE EACH DAY. SEE DETAIL SHEET C701. 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. 8. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. 14. ANY DEWATERING OF STORMA71LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS 16. CONTRACTOR SHALL USE TIRE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION ENTRANCE IS FOUND INSUFFICIENT. IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. MAINTENANCE PLAN 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUC11ON OR DEVELOPMENT. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZA1701V REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED THOSE ABOVE. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. SELF -INSPECTION RULES SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPEC1ION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. SLOPE & SURFACE STABILIZATION GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES. SEE SHEET C705. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED MINIMUM REQUIREMENTS INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MATTING PER MANUFACTURER'S INSTRUCTONS. CONSTRUCTION SEO UENCE INITIAL PHASE (SEE SHEETS C04.01-004.041 1. INSTALL TREE PROTECTION FENCING. 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF LAND DISTURBING ACTIVITIES. 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT STORMWATER CONTROL MEASURES (SCM) DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. Z INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS IMMEDIATELY FOLLOWING GRADING. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL MEASURES. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 13 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUC17ON LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND TEMPORARY STOCKPILES. 16. BEGIN ROUGH GRADING OPERATIONS 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT REQUIREMENTS. 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO TEMPORARY BASINS. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERA 77ONS PROGRESS. INSTALL INLET AND OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM DRAIN LINES UNDER CONSTRUC17ON WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREA TER THAN 6H:IV) AS THEY ARE ESTABLISHED AT FINISH GRADE. 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETA TE STEEP SLOPES (GREATER THAN 6H.1 V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 22. VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS AS SHOWN IN SLOPE AND STABILIZATION NOTES 23. INSTALL SILT BAG INLET PROTECTION ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONS7RUC710N. 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS. REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS 28. REMOVE TEMPORARY CONSTRUC11ON ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. GRAPHIC SCALE 40 0 20 40 80 18C ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: '!!IP G SEAL ,,.• 3 . ; q U. ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: INITIAL EROSION PLAN AREA 2 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.02 0) z O O w J Q L Z It 0 0 U 0 0 U 6) H w w U) F- O J 0- 6 U 0 0 IZ 0 0 a) 0 5 0 0 IZ c 0 0 2 0 A) 0 d ti 0 N 'w > E 0 a U Q M LL N I a) M Mo C N 0)r': c ?: 0- / -- - - �, III EMERGENCY - - - - - ' / / / / \ - • . � �/ / / • - - / / / / - . - \/ / IL /-- -- - . \ -- / - SPILLWAY - / / / � -�. / r --\� /�-\ // - ---'­ ' ' WOODED -1 ,-/-' I . ' V/' - ----- // // // / / \ � ' � . � \ � \\ - F y I /- -- \ \I- MATCHLWEAREA 4 8 6'�' If - _- ''- ;����' �' - \\ -- r' - / i - / / -- / / �/ ,� / \\�\ \ - '� \ / - - -� -- / / -- / -- / ,---- --/ / \ - AREA 3 I -g24, -''r _ - ° //. \ �- \\�, \I /� DIV-15 i - / �� 804 - �j /. /''-\\ � ---- : -- �--, / \' - -- - / \ - \ g22' DIV-18 /' / � / / it �' , - / �` \ -- - - / / \/��\ \� �� � � �:z \\ \ / ' -� / /�� �' / -- __ TEMP. ---/ / \��- �� _�/ \ / S / - -�/ v \ \\ \ 0 � / ' ' - �'' - - - - / ro i�%'' ' TEMPORARY OURET PR07EC77 \ � - g - - � SKIMMER & _ _ � / -� _ � ` - � � � \ �\ \ \ \ � ' /' / �� �' 13'Lx4'Wx27"17i CLASS RI� P� BARREL - - - - _ � l \ \ \ / / _ - �' - - ���� 80 / ./ \ tW , - -- EMERGENCY [---­1 -' 1 \ \ \ \ \\ \\ \ \ \ \ \ TEMPORARY SKIMMER SEDIMENT BASIN 0 1 - �"% � � A / � I ' / 'r ' ( / SPILLWAY/WEIR \ \ \ DRAINAGE AREA: 1.20 AC I / / Bib TSSB-6 / /' / �' , � �� _ i - � �"� � �/' / �'� T v - - - - - - - _ _ _ _ - - - \ \ \ \ \ \ & DISTURBED AREA: 0.3 AC I / = - J / / _ � ! I6 - - - � \ \ \ \ \\ 8 VOLUME REQUIRED: 540 CF I , - , I i - -- - -�T j m / / / \ `' /' - 1 _ w♦ \ TEMPORARY SKIMMER SEDIMENT BASIN f73 \\ \ \ \ \ \ \ ��� SURFACE AREA REQ. 932 SF go M ice: / DI V-12 / \ - " ♦ - \ \11 BAFFLES , -=;� I i / 03 ♦ -- \ --- - �-- \ \ \ \ \\ \ �o�, BOTTOM DIMENSIONS: 31 Lxl6'W / - - _ � - / rn ♦ -\ DRAINAGE AREA: 4.22 AC - - � \ \ \ � \ BOTTOM ELEV. 810.0' I ' r / � I - /' ' 0 \ ♦ ♦ �\ DISTURBED AREA: 3.92 AC \ \ \ \ oo� I Y - / - WEIR / _ _ - ' / / / \ o TSSB-3 \ \ \ \ WEIR ELEV. 812.0' - k - __--- OUTLET / ---- ---- - ---- / / ♦ , - - -- V REQUA REQ. - 3,27 SF \ \ \ \ \ �06 EMBANKMENT ELEV. 814.0' 1 I �/ 13 _ - - - - _ - - - - - - i / ' / / ♦ SURFACE AREA REQ. 3,279 SF - - _ \ \ \ SKIMMER DIAMETER: 1.5" j - - - - �� ' ' - - - _ � - � / / \ BOTTOM DIMENSIONS 74'Lx39'W \ \ \ / 0, - � i 1 �� - . -- ----� / // ----' BOTT�Iu FIF Rmn _� \ \ \ \ w� ��-- ORIFICE DIAMETER: 3/8" I / / / i -- __ � - j � - V' -�„r� \ o_ DRAWDOWN TIME 4.87 DAYS I // / / -- ---� i ­�------------ !----Ji//-- WEIR ELEV. 809.0' �� \ \\ \ \ \ I \ ) TEMP. I / / / j � / -- -- - - � - .,, r'-- - _ - - - -_ / / � � EMBANKMENT ELEV 811.0' - \ \ \ \ \8� \ EMERGENCY SKIMMER & J // / / _ - � - - - ! '- _ \ _ _ - - � - - -- SKIMMER 4NAMEfiER- - -2.U' - _ � \ \ \ - � I SPILLWAY/WEIR BARREL � z / ' �/ / _ - �� -� 11 -_ __ ---------��� _ --- ORIFICE DIAMETER: 1.5" - \� \\� \ - r` I //// / ' ' -� �- -- -- "- --�� -�/� _---- - \ DRAWDOWN TIME. 3.44 DAYS \ --"� \ 816 84\\ - \ \ I I / Z";-'z / // Z ' . /' TEMPORARY COFFER �� B FFtES TS= 1 //----- ISO LF - � - - - _ -- ----`' \\\ �\---� \�---- � _ - _ _ / / / / / / . PUMP OW _ - - - - - /' 15"HDPE \ - - _ - - - - - - \ 820 818 i - - _ _ �I II I � 8p6 //� // / /-- / STREAM THROUGH ' ---- --- _---------- DIV-10 ---_ --- \-\ -� DIV-17 _ I I /�/ //Z� / // ' /< DI BANCE TO - - - ----- ---- ------ �-- `P�Q �\ \� / / //./// // / LLOW CULVERT- /�' DIV-11 \ _ \ 822� \ _��22� z/ / // / /ice/ / �1 / NSTALLA?ION. -� _-`` _ -- -- - - --_- \ -- / /"/ / / --- _ L- - �\ 8 \ 2" IRON _�_ ''%' 8�2 \ - ---- i�� - / ` -X. /j/ ///// ,- ''/j -- ----'- '--- ---- - r#Li - \\ �� \�\� \ TEMPORARY SEDIMENT TRAP TST-11 3/" IRON Tie - = ' '---812- --,- / 808 ` B�Q�/J /�� / / / /' � / �j SHED �-- --- a // \ DRAINAGE ARE��DS�IL� \ 828 --, �� S89 40'24"E S8934'58 E _ � - - - - - -S&237 35 � 810 - 216.20 � � - � / / / // / - - S891�1' 8"E / - _ 2 _ _ _ _ _ 52.76' 134.83' / - -.- - - - - - - - - -- 11 / / / / - / - - a " / 78.69' - - - - - _ - - - - % REBA '--- - �' _ - ' / ' S89'13'44"E / / " / RE�A7� - TURBE REA: O.6 AC \ \ \ \ \ �7 - S89 22'46 E 8 y� - - - - - - • _.. R / / / / "SOLD IRON - - - - / - - VOLUME REQUIRED: 2,160 CF _ X 7" SNr SE�$4CK TT � / �/ / - i Tie / 281.31 / 25.22 -T" - _ - \ _ / / d IRON - , SURFACE AREA REQ_ - 713�� - \) \ \\\\\ // /' ' /// / '' -- '' // ----- \\ I �/ \ -�-- B9TTBM DiigENSIONS: 30Lx14'W ----__ -19J" \�\ \ f / / // . / / / SB - ' --- /-_----- -�-- \ 830 '6 \\ BOTTOM ELEV 812.0' - �_\ \� \ g18 \� \ I / / / 61 / % � / / __ ---- --- - � ---- // ---- WEIR ELEV.-8-1�0'- -834- \ �� _ - - '� \\'� I If/ / / / � / �� - / /�------------- - '� /'a - \ - \ EMBANKMENT ELEV. 817.0' --- ------ �-- \ �\ _ \ -- - ) \ �/ ./ f // // / // //' -// //' -� \--1 - -J-- -�/ /g36---- \ WEIR LENGTH: 4' -836- \�------ z \------- / / �' / / � I / / ///// // ' I- - - �-834__ /'- �/ \ \------- ��\-- ��\ �,6PORARY SEDIMENT BASIN 2 TSB-2 _-�� I\ //�%'�%//) //////" I/ / /// //' --�, - //� //-/ -- 8�6 --- ----11 "I' ---� 838-- - _ _-- \- ---------- -----838�\\\ ��\\ ��\ / // / ��- -- I - /' // ---- ---- -`�`-- ---- r /' --840 \ -840-- ---- ---- DR NaGE AREA: 2.05 AC / / / // / / / -- / / � -- DISTURB AREA: 2.05 AC 1 y/ / / / / / � / � _ - - - j I / \ - - \ -- \ \ \ VOLUME REQE�JFR DD:: 3, 690 CF I / I I '�' / / / / / / I / -- - - 8 URRFFAACE AREA REQ--3,M Sf-� I // /�/ � //,/ /// j / / �i I I // /'' �/� /- �_` _----- --I % --842- \\ - --- -- -------842 � \� B M ELEV. 809.50' / / J-------- ��� \\ / // / / / / � 11 -I- I - � / ' 840 - 844 - \\- - \ \ I\ RISER �EMe. TOP ELEV. 813.50' I / �i% / ,/ �/ // / , ,/ /- ' I I 1z /' /� -,- ----- -� =-J ,- -- -----_ _-- \ \ -- \ --8 EMBANKMEN EV.• 816.00' I /// / /�/ / / / / I I - ------ --- - \\-------- 844-- \ 'SKIMMER DIAME : 0.75" / / .// / / - / / / / / / ,/ If /-- I I _-/ // / _�' DIV-I1 - ----- --__-- ✓-- / 846 --- \ \ �� ORIF1 IAMETER: \ 1.5" I / ./ I I /( / / / // TEMP. , I _-- / / 842' ---- --- // \\---------- `--- ---\ \\ 1'� / / / // SKIMMER \ \ \ 4 DjILIZ�r TE%VJ10N WETLAND DIM NSION � �I ,I 11A / / / / / / / , / / / - - - -I I / /' / �' � - - - - - - - _ - / / / / -- 848- - - - \\ \ -846 � \ \ - - / / / �i _ / / -- \ _ \ \ I'n SEE�DETAIL SHEET. \ �� /� / / / / / / I I - / - / � - - - - - J / / \ - - � � \ \ \ � \ /// //// // / / / / / I - - - \ \ �\--- ___---848-_ \ \ r \ \ \ , /11 I ��_�// // , / / /// I -j 1z /' / -1/'--------------- // --- \\ \\ \\ \\ `8�' \ \ I \ I �I I I I I I �/ / / / / / / // //' 'I // -844� / - ' _-� / \\ \ \ ---SSo \� \\ \\ 1-1 \ 1 1 1 I I I I % / / / / / / AFF - W , I / / / // 46 / ' / �i / -852- --\-- �------------ \ \\\ \\\ \ 1 1 1 1 1 �I I I i I I II / / / / / ,/ ,/ / . / / / 1 I 1 1 ti / / /j // �� / - 8 _ 8� \ \ \ k � 1 1 1 1 •111 '` 111.I l I l l l // .�/ �I / /"I // --- _--- -- --854- _\ \\ S`\ ' \WI\o I I /II / / / /00 I _ _ - \ M �,IINI I I J I I./ l ///• / ( i '� / / / / ' ---- ----_ -'-- �_- -856- \ __ \ \ &SQ\ \ \ \\ o I 3 I I / / / / /// • / I i/ J / I // �a / _ \ \ N z N l I l l I /// ll/ / 1 /i / TSe-1 � , / a / / \ ) \ L - \ \ \ \ I , I I / / I l //�/// 11/. 1 /l / /' I 0 /' ,' / --- --858--- -_-\ \\cp\\ -_�\I I //// / /,/// /�// % I I I % �// // � // y 'I / // / //// // /'---' - \ � _ �\``\ s��\ \ \\ \- _ l l / l I / j /// � I I / I I ,,� I /, // a5o // // -860- _ \ \ \ \ \ % / / / / / �% /gyp 1 N / I I I / / BPFF�i' I I 'I-,' z // ---_ '-''' \ \\ \� \\ \\ �\ L /l � l l ��l / l /j�� 1 1 / /lI I 010 / /I I 3 /' / - /// \\ � \\ C& \ \ \\\ - / / / /l / I l/l l/ml l l 1 �f / / I I � / to / - as2,_ \ \ \ 1 - -_ / / / / / IlJl l/ I / / / 1 I � I / / l.' / / I , / / 5�"C �/ \ -- - / / / / / �// // r / l / I / / ..-r I / / j I / //a ///' 1.1 /1-1 '1-1 ' �- � �/ ��'� c.� `\�\\ \ \\ \\ \\ /I / // /// // //�/ ��/ / //' l l l it l l / I I ' // /' / /� S- A \ \ \ I-� / / / / //� \'// /I / / / / I � /r I / / / // I / / // /' w \ �----- / / � // // /j/ I // / / 1 // I / / / f / , 5 / / / _ �� // I f // / / 1 / /6FF�'� I /' 11 � /'' - /'�'f 864 / / / - - - I Dlv-10 ,. - \ / //',/ // / / / / / 1 /'F � .-,�/ I / / / / '------'' 1-1 \ / � \ -- E E -- E - \ - - --E - Ei� I // // / / / I / I / -- Ln \ \ - I �/ % ��l// / /�/ a22 I / / / / / / I I �� . f . / I ,-/ 11 / / \ j l I / \ / / / / l/ i/ / i I / / / / EXIST 6`�JILDIN �''� 1 ' \ Pie % " re / l .7 / ll / l / / / / / / I I I 4, , / / /� // carioN Nor I I - ----- ----- ----------------- 99.79' /e IRON 128. 75' I %'IR#1N '/ / // / / /// - / / / I I / / I / / , � - - - - - � -Q - 3/e IRON S89'47'08"E _ 228.55' Total l ��/ l _- / // / //I J I �� / / /// ��� I // / // // /, SURVEYED - - I \ \\ // \-\ Tie // \ / I I I i / I / / / `�/�/ �,82, // /� / / �/ % I / 0� /� \ 1 �\ /' --\ 1" V I I I I / I ,//- 7 / / f // // // // //l I "a5 / i I 1 \ \ ,/ -----I-- ,--�---- T-------- -_r - 1 / I I I I I I II If \�/ ��/�%�/ /�'g2 l / / // // �, / /r / I I / / // I I \ IfD BAkKWOOD DRIVE I I I I / I / N // // / / ,, , / / I / -- .-- J \ I I i ASPHALT DRIVE/ --- J I I I / // / g2 / / / // �/ / / / / // / /-- --� \ -----�-- 7 � li-o I I I II l l l ( / 8 // / // i/ // // I / I // / /' -- I \ -----1------I ----- T----- ---- / / ce` ��I °u -" �° '' 1 / 1 I %I l �/� EMERGENCY // / / 7z -� /I ��,/ � --- I / / / / / / ��/ \ \-� h// / // // /I I I j�/�SPILLWAY , / / / / / I / / / ��� \ I \ \ ",I- N \ 5ti / / / I I I /I , / / / 1-1 / / / , f/ o� / / \ I �°� \ \ / 1 /T=�' c�95E�` Lj'�/ J 11�//' �/ jj//j/i//// 2%/// -- 1!-_i// _-- ------ / ---I / /�� // // /�' �J I o \\ \� /� 210.00' / - L _� / i "' � / / / / �"��'�� b/ /�� /� / 1-1 / /11 ."/ _ - _ - / / / / / / EXISTING BUILDING / I -- / - ) \ / / a50 7',1IDE S�E�7, / / / /" - /%q��// / DIV-9 / / LOCAr10N NOT w / Tie l T / �� / / i / / - / - / / / / / I / I / / / / / / / / SURVEYED / / / / / / ,- / / /" / / / / / / / m/ / /' / I / 4° o / / '/ / / /// / - / / ' / /11111111 11 / / / / / / 1-1 // � J / / � / /// //// // I ) �� i/�/i// / /�- j��' / --/ / a-- / / / / // / i0 j ,/ I Q- - o ''/ / / / / / / / / / / ///i�p //%//' � ,�-- '' / / / / / / I � �, m 62- ( // W I / / / / / / / / / f / /// /// / Z / / I--- / / / / / / ° / () I o I I / / / / / / / / �/ ///// / // �/ /// /-- / / 4 / / / I I /Lc) - x000EO I 1 / / / / / / / /� / //�// /// / // // - / / / // 1 ' Il I I I // // // �//// / / �%/ ///�/ /%'/� / /"I /// ,-- --/ // // a / / / // F---I (-,\ / I // I ��-_----- /' / - / / / / , / / EXISTING BUILDING I I / � I / ----- --- / / / / / / / / / / /� / / -- --/ / / /a / LOCATION NOT SURVEYED n I I / / a I I I / / /� //// /// � %/ / ///� / / / / /� // / / 1-1 / / / 0 / I I a6 __----- ~ .0 I / //// / / /� / /,/ // %%/// //// �// ��// //''/--// ///' // //-- /�854 / / // / // - 1 / \ \ / // / I I /' /---i -_-- o r- I I / / / / / / / , // - / / / / / / / / / I 1 - ---_-- o Z I l l I I l 1 // l I. �jK %// / / / / ' / /' / ' ' / / / \ F, i I / ' FT1 /''' - - - - o I / ( /� q,///� / // /// ,/ / /-' // //' /' /'' -856-' // / / // n i \ I i J // //' / I / /- ------- I I 1/ l I I I I I /I I /i� //i// // /// // i� // / I � I \ I W I I $5a- I I I I I I l l ' I I I I ll/ //j/ / // /// // / /'/ // / �/ // // I/ // / / I � 11 I \�. � EE / // 1 - --- --___- / I I I ' / I I //I /// / DIV-9 / / / / // / --858 / / / � � \ I / � I ,,---- / 1 I 1 I I I // ,0�v / / /� , / 1-1 / ---- 1 -- � - / / - ,� 0 / 1 // / I \ WELL � w / / rm / I I ( / / / / / / / / - / I 1 i i�i / / / I / � � I 0 \% . J -2i . z I--,' I 1 I \ \ / / / 60 / i i I \ - // / I I 6 ' -- --- \ / I I 1 I I I I / � \ \ \ 826 /) l// ( / It / / / , / /' /' // -- / / / `k I I I � J z / I 85 � - , -- \ I I I l 1 1 1 f // I / / / / / / / / / WELL I �W I 6 '- \ I // OwELL / // - \ // \ I I 1 \ \ ��L� - / / // / / / / / / / / / / / I I yI / m __i I / / S09 O8'22"W \ I \ 1 I \ \ '� / / / / o � i / i � / \ / 11 3.56' Tie \ I I I 1 I \ \ \ \ \ \ TEMP. / / / / / / / / / / / / / a62 i I W i I / / / /' / 4' -' \ / �" Iron - \ I I SKIMMER & / / / / / / / / - E - E --- E --- E --� E �- �i- E --- E --- E - - --- E --- E --� E -- I / J Ex. 2"Iron `Q6I \ " I I \ \ \ BARREL / / l / / / / / / / / _ _ / I I � I ' / / -' / - / ENTIMA �fb \ * A\4 l / l / / / / 7/ //' // // // /-- i I �'�' I \ / //' //�"REBAR /'' / �, ''- "I �-- I / / / / �_ --- i----yS893313 tY/-101.96 _-------1N884707"W 10.1q' S884913W 1.52' a / -- ------------- -------------------- - / / / ---\ 41.3 ' I I I \ \ I EMERGENCY / / / / / / / - F _ 3 " - 3 " 7� I I ' - - - - - - / r � I I EMERGENCY I I I \SPILLWAY/WEIR / // / / / \ - - - - - - - - - - - - GRAVEL DRIVE - - - � "BEN / / /M BAR � � I RON / I / / I � / - � I� / I SPILLWAY/WEIR I I / / // //---------------- - -- - - - ----_ - -- - - ----------------- / ---- _/___/ I 8 ' / / --I / I - ' / ' --- ------ ��!_ 11 5g / / I � 850 -- J �� 1 _ _ 11 / I I /I�i \ I, \J / / / I I I i/ l /,' /,� ///// \ ' ,- ' f ,- -- /� / I // /� -848 ''' i--- /' - -- -111 LEGEND TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET -.- �� W� TEMP. INLET PROTECTION DEVICE *` 0! SEE DETAIL SHEET _._ TEMP. DIVERSION DITCH / BERM SEE DETAIL SHEET -.- TEMP. SILT FENCE SEE DETAIL SHEET -.- ® TEMP. REINFORCED SILT FENCE OUTLET SEE DETAIL SHEET -.- PERMANENT OUTLET PROTEC71ON SEE DETAIL SHEET _._ TCW TEMP. CONCRETE WASHOUT AREA Em SEE DETAIL SHEET - TEMP. PLASTIC LINING, SEE TEMP. BASIN BAFFLES ON DETAIL SHEET -.- CD TEMP. CHECK DAM �� SEE DETAIL SHEET - TEMP. COFFER DAM SEE STREAM CROSSING/CULVERT INSTALLATION DETAIL SHEET _._ MP TEMP. J-HOOK PROTECTION Lrl SEE DETAIL SHEET - TEMP. 17MBERIBRIDGE MAT SEE DETAIL SHEET _._ TEMP. SKIMMER SEDIMENT BASIN TSSB SEE DETAIL SHEET -- - - _ - - EXISTING CONTOUR FINISHED CONTOUR �,�- TEMP. CONTOUR (TEMP. GRADES DURING CONSTR.) *a, TEMP. ROCK PIPE INLET PROTECTION . j SEE DETAIL SHEET - CHANNEL LINING SEE DETAIL SHEET - B TEMP. DEWATERING SILT BAG G SEE DETAIL SHEET - TEMP. SEDIMENT TRAP SEE DETAIL SHEET _._ TREE PROTEC71ON FENCE SEE DETAIL SHEET _._ TCS TEMP. COMPOST SOCK, SEE DETAIL SHEET _._ "O► TEMP. COMPOST SOCK IN CHANNEL, SEE DETAIL SHEET _._ D TEMP. SLOPE DRAIN SEE DETAIL SHEET ­ � � PROPOSED STORM SEWER PIPES = = = = = EXISTING STORM SEWER PIPES - - - - CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED. TEMPORARY COCONUT SLOPE MATTING SEE DETAIL SHEET EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISVILLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITIES CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR ARCHITECT. 4. TOTAL DISTURBED AREA: 30 AC. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PR07EC71ON AFTER WORK STOPPAGE EACH DAY. SEE DETAIL SHEET C701. 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. B. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. 14. ANY DEWATERING OF STORMA71LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRI77CAL AREAS 16. CONTRACTOR SHALL USE 71RE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUC77ON ENTRANCE IS FOUND INSUFFICIENT. IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED THOSE ABOVE. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. SELF -INSPECTION RULES SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. SLOPE & SURFACE STABILIZATION GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES. SEE SHEET C705. EXTENSIONS OF 77ME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZA71ON REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED MINIMUM REQUIREMENTS INSTALL TEMPORARY EXCELSIOR MA771NG FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS. CONSTRUCTION SEQUENCE INITIAL PHASE (SEE SHEETS C04.01-CO4.04) 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT 1. INSTALL TREE PROTECTION FENCING. REQUIREMENTS. 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF TEMPORARY BASINS. LAND DISTURBING ACTIVITIES. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH ARE ESTABLISHED AT FINISH GRADE. TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETATE STEEP SLOPES (GREATER THAN 6H:1V) STORMWATER CONTROL MEASURES SCM DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, ( ) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND COVER IS ESTABLISHED. THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE 22 VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED AS SHOWN IN SLOPE AND STABILIZATION NOTES IMMEDIATELY UPON INSTALLATION. 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES 23. INSTALL SILT BAG INLET PROTEC71ON ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND DIRECT RUN-OFF INTO INLETS. ANCHORED IMMEDIATELY UPON INSTALLATION. 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. Z INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS IMMEDIATELY FOLLOWING GRADING. AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS AREAS REMAINING ON SITE INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS REMOVE MEASURES. TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS GRAPHIC SCALE INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND 49 Q ?o 4a 8o 180 r TEMPORARY STOCKPILES. 16. BEGIN ROUGH GRADING OPERATIONS ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 2 71 01 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: �, 1,11,E „ '!!IP %A CAP , 01-..-Mi 1�, � •� • :�` G SEALfi' .'r-" . ;0. ,y'',►N A. tiQ►*''4, 1 "�081toIit0 "' 9 - I I ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: INITIAL EROSION PLAN AREA 3 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.03 0) z 0 O W J Q L E It 0 U 0 0 U in F- W W U) F- O J 0- 6 U 0 0 0 0 a) 0 2 0 0 c 0 0 li 0 A) 0 d ti 0 N W > E 0 a Q M LL N I a) M Mo C N 0)r': c ?: 0- - \ \\ \ �r �A\ -\\\' l ��\ \ V \e \ ' / \`\ �\ ��'_, \\ v � \ I -\ o m / -� \ T__�_ \1 y \e-\ kz--:------- 6y - \w �\ 1 �� co� "i I - 00 -_� � \ - �\ ( 1� 2. I' \ ` ` � �� \ -�� <v 1 - • PUNT -DIP \ \ \ \ b / I % IR N pb - ,,,`\ - EXISTIIl L = �- / - -- ---- 'I_ __\ D 1 _ / � \ � � / ' T� _ \- - - _ ' �� BENCHMARK - TOP OF OPERATING BOLT 821.29 / \ ?\ 1p• 3, - R � . I% , x. ` \ ` FR N\ e «tom \ \ O T qRp ���_ �� �r� J o� -- a '\+ I\� wQ _ \ 4 SF \ `w \ \ I \ 7058 BMFliTOPNUT �' « \ I 2� \ \ / �7 \ \ \ - / _ 1 - `l.� , DIV-18 \ ir \ �� ryi�' ` �O \ \ 1 \\ i• •i • ~ a \� _ I/J • - • 7� 1 •, C N - - ,X' 3 i�hNG WALL � . 876 1 - If' I I I 's�°v�'�'+l 4ir% • - - / 1R1 % w• \ __ V, \ ,-I \\ \ \ 4 Ai �O / q�P \ \ - \ \ \ �- - Z W a / \ \ 0 ' /,tea,\ \�\� �\ ���, W- - �� / IZ \ \\ \ -__ - W \ W / ) I /'\ \ ? ^ / /INSTALL TEMPORARY 127RCP \ I � / \ -�\ \ \ �TIN G/rlYj�L \ C �-_ W -, \ I Z^_ / / EXTENSION OF EXISiiNG PIPE / � / e-- - -' _ _ -CONS TRUCI ---�- \- 3/"IRON I I -/ J/ \ 2p�\ -\- - \ l 7 \\ _------) � � __ �- \`. � _ /¢p / /��� / FROND F\\ T \ v. S73 - '-_-- \ \ - -- L W \�`. \ \ 2ti /P E/P I / DIV-13 / LACY( �� l � 2.2�� ---� ____- � o - \��-�-, \� B /�� I--,' � \ Sr - / a30 v l� � /� - �I- \ 4`-�! � � >98 EXISTING WALL TQ \ / / ) ----__�--- v� I // 832 ���'' Q r / \' / /�--CD /1OB�^/ `\ - \_ �� ���'�� I "-Ni\ 3/ "IRON / - TEMPORARY OU PROTECTION / ( i I �l 7� �1 "IR �_ / ^ ` - - - - - - - 1 _ (ISO / V /yOO W �� ��98 TSD-1 10'Lx4'Wx27"1! CLASS 1 RIPRAP I / \ / �- / - - - - - - - - _ _ /t /� , D /1'C �t -c 1 �� TEMPORARY SEDIMENT BASIN 2 TSB-2) / e 1� ? - > / -- - _ _ Yi/ �iqD - - _ _ \ \ �� ( I JHP _ I / 0 I I peC P �3 _ C DRAINAGE AREA: 2.05 AC I l l / -- _ _ \ �5 1iDPE / / 0L q� / / / E� ` �� ` - = _ \ - - - = _ _ - B �9 DISiURBED AREA. 2.05 AC l I / � _�z �ff-131 h � ' ^ .,./a, I / / // , ) �� �`- ----_ i / ��� `E ` ,- �"I VOLUME REQUIRED: 3, 690 CF / / / / / / __ / / �o / \ / / �� _ - _/ ��� � � - - - _ -_ - 6,\ \� SURFACE AREA REQ. 3,289 SF / / - ��\ \moo ,i 5 / / - / / / / \/ ,moo 'o �j E _ - _ _ ` BOTTOM ELEV. 809.50, / / / / �' / - - - - y / DIV-14 / � l /� E �� �y7T _- \ \� / b RISER TEMP. TOP ELEV. 813.50' / � / _ / / - / / / /� /� / / / / � � ` E _ _ _ �2t`T---- - - - - _ _ `� EMBANKMENT ELEV. 816.00' / / / / / / / _ E 4p7' ---- -- \ -�- /�' /--- // / �/ ` SKIMMER DIAMETER: 0.75" / / / -_ _ - _ / � � / / / / / o� / i ` E _ ` 'EXtSTIPI�WALL - --- I _ ORIFICE DIAMETER: 1.5" Lu S36 // // -/' - 1z // / / / / \ // / j / \� - E ` � -_ -- f� - I / DRAWDOWN TIME. 2.7 DAYS 1/ __/ / �/ / / / ,/ / - / \ � � - E� ` 79 / // / / / / / -� \ \ � l (� 90 UTILIZE DETENTION WETLAND DIMENSIONS / 1 / / / / / / / 606 /� SEE DETAIL SHEET. / / /- / \\ ��\ 'f �/ / / I 8 // -t-� P -% // // oo - ___/ r5 / 1l I TEMP. --- _' // // / / / / "\ y\ - ` ro ` �` \ TSB-2 i / � 7 I' �§Q / �/ � /' / / / / \ \ rn / c g32 , - / I "I SKIMMER ---'' // 1-1 //// / � \ ^ 11 V___ 1-1 1 - - - V- \ I II / EMERGENCY _ _ - - - -' - / / / / \ / - . �� / / _� .. / �� I �\ 4 % SPILLWAY /' ////// / / /I • • - _��. . - / /i // IL /r -_ \. - _ __ _ __ _ - �IpppEp / /-- 1 / / / -- �/ /// // ' � / '\ �-__� -'�� _\\�_ \ � \\\ ��\ --- _ % -_ _�,�/J '/ I ' a� _,-'' /�,�'�--���/,-----___- ", ��_ �\ ���_ \ -826-'/ ,/--' � __ /- _--- /-'' /-'�/�' /- MATCHLiNE AREA 4 - " J_ -i 1 /824- / ,__ /__\ - -' ---- /� �' �" �� \ //_ -__--' 1 \�\\ \ AREA 3 �/ -- _ ,- _/ /� I- �� aoo , /- �' \\ \ _ ! ///\� \\ \� / DIV-15 - / / r--- /. \ ---- DIV-18 / �� "/ -�\\`_�1� \\ \ 22/ // "- // �/ /�// f� // //_ �i, 322 / // _--' / B J � /_��/ / / /---- - -- TEMP. ---/ / \��_ -_ ___ �\ 1\ � \ ' \ \\\ per/ / -_- - ~Z -_ - \ �\ ro . i/%�� �'�TEMPORARY OURET PROTECTION- \ /' B - - SKIMMER & _-�/ BARREL \ \ \� // �__ ----" �// -_- I / ice/ � 13'Lx4'Wx27" CLASS Rl� P - _ \ \ " \ \\ / / � / / / / / / / / / / / / / / 0 / / / / \\\ \ �. \\ \� w / / / / / / � / / \\� - \ `. / / `z% \ I--- \ // -/ / // ///' /// // /// // // // // / // // // // // �/ / // /� // // / // // / \) )� . \\ \� 1 � // / / / / / / / / / / / / / / / / / / / / / / - . A�'� i / / /,, / �!- --�\ -� -- _ - -1-1 / -' - // / // / / / / /' / / // / // , , / �00 , ?/ \ . --_ - ----_ • . \\ 1 / // // // / / // / / / // /� / o I. / V -� N89 'S6 E 89 \ 5 E / / / / / / / / / / / / -_� - �- / �L� /- % ' _ --� ------ -" ----' / // / �/ -T / / _/ -- / / / / / / / 7 L-L -- ���- - - 2 54' / i" - i / // // /� _ / / / // /// // // // / / i -788 /�� / // \ \ -�� " , -�in - -IRON / / / / V \ /- �/ / / / / / / / / / \\� - .\\ / / / / / / / / /,,, / / // / / / / / //-- / \ \.I \ \ -- E--_- // - // - �.•' // I/ �"'t�'// // // /'- /-- // // I�P ,.`�� / // // // / // �� /i /�9p // Ok -_ / / \\I\ 11 _ \ `\ . \' � / //' �5 �.�`��' / // // // // HP // / / / / �// / . ��-' /// �g2 � /- / i/ /,\\\, / \ ` � �`6 �I \ \ S �. / / / / / / / � / ---/ / - \\ \\ : \ I -- \\\ \ �� -- --- �" /�' $$`i' // / HP �• / /NIIII- / z / / / / // / / / // / / /� // -� � `� �� -J \\��\ / II / / / / /// / / / � 1J / �\ / / -- / � \\ \\ `. I/ _ - -'- ___ � - --- // /� - /\__' / // // // // ,_- // /' // // / / / / / / _- /-/ // / // ��� // �/ ,/' ,6-' / a02 \�\\ \\�� I_� II I / / / 804 -\\\ \\ \\ \ --- w�-- /' --/ /-/ // // ---- �/' �/ // - � / / // // // /� �/ // // // // // // // // / // // /_/Z ///,- -, \ // // // / // // // // / '-/ // �/ 3i / / / / f / / -/_ -/� --/ -_" \ � \\ 1\\\� \ I •� II / " ° / / / / / / / / / / -\ \ t: II �• -- --� //_---- � // ---- -/ -/ _- _- // - /\i --- 1-1 / // // // // // // 1J /- /-J - 806 \\\\\\ 1 1 i /-/- � / / � / / // / / /, / / / / // '- __- \ \ \\ / I / / / / / / /^ / / / 1 1-1 - - - - / IIIII&IIII- -- - - TEMPORARY SKIMMER SEDIMENT BASIN -- (Is�g ---- // / / / / T / / \ '_- /_-- / // / 1 / /� // // //' / ////' // // / �/,- 1' /'If � � ��//z//�/r /// / / // \�\\1/I // / �/1 � ` \\\ / -/' �•I III __ - - - DRAINAGE A A - 6. 72 / / / / / / / / b '\\ / / / / - l `* I lj 810 \\\\\\ / - _AC/ ---- ISTU�BE6 AREA: -5.52 AC / I�L�1ME REQU EDP 9, / / // �/ / // // /�,/'//////���`/! �/ 1-1 /� ///i / / /- �-- \` \Il / \\\ / / ���/ -�D / !/ // " /�/'� / �� \�\\ \\\\\'\\\ \\ \1. / URRAC!< AR A REQ: �5,221 SF / // / ///// // // / // /� \ / / / / / / �'� / / / / / - / \ \ \ - / TOM DIM NS: 95�x50 W / / - _ // // / // // 1/ 1-1 // ///- �- -11 _��/�/ //' �// // �/ /// / ---- - 872 --� \��\ \�\\\\ I ( I \ J / ,- / --M // -- E NKMENT F.LE+-- 814.Cr- / � / / / / 1z / -i/ / G _---- / •>< // / / / / \ \\�-_ \ \�\ - - \ i \ / / / /% / //i j// �- _- / / / / /\ \\\ \ \ �r / �W __-M I - I DIAMETER: _�2.0' _� ' ------_ \\�� / / / / / / /� /�_� . -_-� /_/ /_ / // / -// / 814 --\ \ \\� \ \ \ �_ - \\ ��� I / \\ \ \�\�\\\\-� \1 \ -- a ,a / �' / �r - /'-_ ORFi�E D�ME�ER- // /� /� /�� _ / i� ��-�� __----/ `�/ /__ / /-- // \ \ \\ -�T - ` \\� � /� / / �/ // / -_ / \ \\ \ \� ---_ \ \ ,a _V- �� // f A WIN TIME. 4.85 D --_ r� / // /' _/. �/ \\\\��� // // // / %/// ,- / // /_-- �/ �,/ \ \\ 4 �� �' ---- \\ \\ � - \\ \ �- \ - TSSB-2 \ EMERGENCY / J SPILLWAY WEIR / ---- - o / r i / - -_ / - 816 - \ \ \\ \\ � _ �� �R' \ / \ \ \ - -- --_ / / / \ \ ��5 // �� // / TEMP. / // //-- -- -- -" _ \ // / / // i / -- / \ \ \ \ -_ \\ _ \ \� /, / \�\ \ \ -_ ,-� - � \\\ / --� //'' �/' SKIMMER & / �/ //' ��i-�\/ %%/ // /////// /r---' ��//'- - - ----- 800 � \\\ \�& / /� / �-� // / \ \\ \\ 11, \� --_; -_ o \ / - ._f BARREL / / //// ./ / \_/// // / -- /-- ______ \\ \ \ \ / // \ / / / 6 / / � - - / - - - \ \ \ \ 818 ----\ \\\ \\\ \\\ �\ \\\ \ \\\\\\ � /�/ /-/ B /// -1 --,:I- "I / j/j i� . ��---- j�/� //' / �__ "--'' --//' "--_-'- 806' �/ / i \\ \ / / "I I_ _� / -- ///� / _� / / -- /-� -- \ \ 1-1 \ oB \ \\ \ \\� 100 YEAR FLOODWAY - 5- / -- - / / ' / - \ \ \\ \ \\ \ 500 YEAR FLOODWAY I / \ / i / / / / / / -/ / / / / / \ - \ \ - ��/ -- / / / \\ \ / - / _ _ / - WOODED/----- \ \ \ c DIV-8 -� -/__- r-' _ /'- /%j/ �/ i� _'// 1' -- _ // // // _ f� \� \\ �\ \\ %, t \\ \\I �\\ � /' // / /// j % ��� j- - .-/ 'I---/ ---- \\ \\ \ // //// j// /i /------_---- // - - / / - - -- // / I I I- � = ------- _-'�'( _- ---_- ---- _ �' v �� ///// // /-- ���/ //- 824 - -___ \�\ \\ \\ \\ \I - / ------� � \I / - \/ _ - ----- -- / -_ __ ----- -11 // / _/ -__ \\ \\ '_l \ \ \ -_J� ---/ /--- - / - / / i - _-_- - -- �-� / / / -- _ \ \ cP I- ------ / - \ \ �\ \\ \\ \\ \ \ \ ----- -----/' /'� -__' \J -- i� / //' // 828 - / / f \� �\\ \ \ \ \ - / ri] �/ �/ ___-'--- _ // ___--------- \ \ \ 822 � \\ \\ - \ \ \ � V\ \\ �-- o �� _--" --' �� --- ----- 830 \ \ \ \ � --- ----- _-__-- ,-/ -/ �� \ -� -- \ \ - \ - LEGEND EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN CONSTRUCTION SEQUENCE • TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET TSSB iEMP. SKIMMER SEDIMENT BASIN SEE DETAIL SHEET 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISVILLE AND NCDOT STANDARDS, SPECIFICATIONS AND 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND DETAILS. STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH INITIAL PHASE (SEE SHEETS C04.01-CO4.041 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT 1. INSTALL TREE PROTECTION FENCING. REQUIREMENTS. •��,_ X. _•_ . __ 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO �10W� TEMP. INLET PROTECTION DEVICE ----- - EXISTING CONTOUR ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF TEMPORARY BASINS. LAND DISTURBING ACTIVITIES. *r 0! SEE DETAIL SHEET -._ FINISHED CONTOUR 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND TEMP. CONTOUR LOCAL AUTHORITIES OR ARCHITECT. CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZA1ION REQUIREMENTS AND SCHEDULES WHICH MAY 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM TEMP. DIVERSION DITCH /BERM SEE DETAIL SHEET _._ �-� (TEMP. GRADES DURING CONSTR.) 4. TOTAL DISTURBED AREA: 30 AC. EXCEED THOSE ABOVE. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK STOPPAGE EACH DAY. SEE 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. DRAIN LINES UNDER CONSTRUC17ON WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. TEMP. SILT FENCE �� DETAIL SHEET C701. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF TEMP. ROCK PIPE INLET PROTECTION SEE DETAIL SHEET 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER). REFER TO MATERIAL SPECIFICA71ONS INSTALL MATTING PER 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH ARE ESTABLISHED AT FINISH GRADE. SEE DETAIL SHEET _._ �♦ _._ INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE MANUFACTURER'S INSTRUCTIONS TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. ® SEEPDETAIILFSHEED SILT FENCE OUTLET CHANNEL LINING -- SEE DETAIL SHEET 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL SAND OR 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETATE STEEP SLOPES (GREATER THAN 6H:1V) STORM CONTROL MEASURES SCM DIMENSIONS, ELEVATONS AND GRADES. INSTALL BARREL, AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND ( ) PERMANENT OUTLET PROTEC71ON SEE DETAIL SHEET _._ TEMP. DEWATERING SILT BAG OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. SELF -INSPECTION RULES COVER IS ESTABLISHED. THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, _._ III B SEE DETAIL SHEET _._ 8. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE 22 VEGETATE (OR OTHERWISE STABILIZE Wi PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED MULCHED LINED AND ANCHORED � / AS SHOWN IN SLOPE AND STABILIZATION NOTES y TEMP. CONCRETE WASHOUT AREA .... TCW SEE DETAIL SHEET _._ TEMP. SEDIMENT TRAP INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS IMMEDIATELY UPON INSTALLATION. TEMP. PLASTIC LINING, SEE TEMP. ® BASIN SEE DETAIL SHEET _._ 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY CO . THE FENCING SHALL THE FINANCIALLY RESPONSIBILE PERSON AND OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND ( ) / 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES 23. INSTALL SILT BAG INLET PROTLETS. 110N ONCE CURB &GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND DIRECT RUN-OFF INTO INLETS. BAFFLES ON DETAIL SHEET _._ TREE PROTECTION FENCE BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SIZE SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. ANCHORED IMMEDIATELY UPON INSTALLATION. CD TEMP. CHECK DAM SEE DETAIL SHEET _N 10. TREE PROTECTON FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. V SEE DETAIL SHEET _._ TCS ,..... �......1 TEMP. COMPOST SOCK, AREAS WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY LANDSCAPING, () ( FENCING, OR UnL INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT SLOPE & SURFACE STABILIZATION 7. INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS IMMEDIATELY FOLLOWING GRADING. TEMP. COFFER DAM SEE DETAIL SHEET _._ OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED RI AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE O SEE STREAM CROSSING/CULVERT ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT ,;�;. TEMP. COMPOST SOCK IN CHANNEL, GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES SEE IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT SHEET C705. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). INSTALLATION DETAIL SHEET _._ SEE DETAIL SHEET -.- ORDINANCE. 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO D TEMP. SLOPE DRAIN 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS. REMOVE MEASURES. TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. SEE DETAIL SHEET _ _ SEDIMENT BASINS. CONDI110NS THAT MAKE COMPLIANCE IMPRACTICABLE (SEC110N II.B(2) (b)) INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. JHP TEMP. J-HOOK PROTECTION rl o PROPOSED STORM SEWER PIPES 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS Li Offib SEE DETAIL SHEET _._ - - - - - EXISTING STORM SEWER PIPES 14. ANY DEWATERING OF STORM 11LI1Y TRENCHES IS TO BE DONE THROUGH A SILT BAG THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY N EXCEED MINIMUM REQUIREMENTS 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY TEMP. TIMBER/BRIDGE MAT 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. SEE DETAIL SHEET _._ - - - - CONSTRUCTION LIMITS 16. CONTRACTOR SHALL USE TIRE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION UNLESS OTHERWISE NOTED. . . TEMPORARY COCONUT SLOPE ENTRANCE IS FOUND INSUFFICIENT. _ INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). U77LIZE TEMPORARY CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-004.08) 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. MATTING SEE DETAIL SHEET COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. __ INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS GRAPHIC SCALE INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND 40 0 20 40 8o 180 G TEMPORARY STOCKPILES. w 16. BEGIN ROUGH GRADING OPERATIONS � ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 2 71 01 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: INITIAL EROSION PLAN AREA 4 & AREA 5 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.04 z O U) O Qr W J Q z LL Co 0 4 0 U L6 0 0 U 6) F- W W U) F__ O J d U 0 0 U a� 0 2 0 0 c 0 0 U A) 0 d ti I - J / / / / 20' PUBLIC , \� ` ` ``\ ` \ / X 113� /( / t� / / -I- .1,� I \ \\ \ \ \ WATERLINE ♦ \TEMP. / \� ` \ - 4 - / / k/ / \ \ I I \ \ l / I I I \ \ \\ \ \\ \\ SKIMMER & / / EASEMENT ` / / ,` / / � � ` `mil l/ /� � / 1 SASS /' `S6 X -� - J / / / � / / / � /' // �/ I / \ / / � BARREL \ \ \ � \ / / / -- S + / MI - I \ EMERGENCY / / / �` `� `. / / CD - 7 �_ yy I EMERGENCY I SPILLWAY/WEIR _ _ / / I SPILLWAY/WEIR \� / �- --� / ♦ / 85a //-- ----- ` `\ `� BAFFIE \� \`; ;` I I► X I I o 4 Q Q WATERLINE -BAiLFlfEI I \� I \ I I TSSB-5 \� \ �IFFLI� ��/ \ ��---- // / ' / / / / //RIGHT- F-WAY --- ^�/� -- DEED OOK ]6� PAGE�7B8 (LOT 69,B,/BLOCK 0 15) �� / -- SS \-_� / SS SS _ w W EASEMENT � \ - BAF�L q I 838-- � I \` �` \ I I / � //^-' ♦ r / /� // i/ u�j ' -I' //' /� \ / 6 SS _ -- � //' � _ -� � Q Q I II I , •� ' 1 // � - � /' y Ss �--� TS$B-4 I �f � I \ c' ' • •- SS\' SS � v / I // I // / I I B I FL� I I I _ ; `\` �` /1 TEMPORARY SEDIMENT BASIN � \ / TSSB-5 ` ` �` `\ I / 6 a . °- / \ / /' //'/ ' ' /J '' ` / �- -- \ / / // 0' DRAINAGE AREA: 2.4 AC DISTURBED AREA: 2.4 AC VOLUME REQUIRED: 4,320 CF O v /' / - / \ / /// / / / / / / ✓ i /\ - i SS / Q SURFACE AREA REQ. 1,865 SF BOTTOM DIMENSIONS: 60'Lx30'W / - ,y� // f� J / l BOTTOM ELEV. 38.0'LLJ l WEIR ELEV. 40.0' �- / / / / / / / / / y / EMBANKMENT ELEV. 8 .0' IMMER DIAMETER: 2• �, NEbt�MIDDIE SCHOOL-- e- / / �- � \ / / � / �- --� / \ \ / - - � / s� / � // RIFICE DIAMETER: 1.25 �"t / � / AWDOWN 11ME.• 3.04 Di�YS/ FFE = 861.50 � -r" ` ` / � /'- 1 ` ` ` ` ' ` ` ` ` ` `` - / / \ ` Cp // �856� CD / \I�Rp /� \ \ / TEMPORARY SKIMMER IMENT BAST 808 - DRAINAGtp E: 4.1,A� - �6 -- DISTURBED AREA: �-27 AC- - - - - VOLUME REQUIRED: 4,860 CF AREA REQ: 3r1 85 SF- --SURFACE - BOTTOM DIMENSIONS- 64 Lx30'W _ / / � / c, / ♦ / D 1 � / � ..-_-_ TELEV. 83J10`PUBLIC- /--- ---- WEIR ELEV. _,�---- EASEMENT I W / ` ` 20' PUBLIC / / \\\� / / / - T NKMENT ELEV. B43A� �� " / c° i \` \` // , //�//i/i / / / \ \ \ / `` \ \ \ WATERLINE / i �0 -- / DIV-4 J� - -- SKIMMER DIAMEl­ 2. / J - - - R£E-DIAMETER: 25" / / I I / i/ ` \\ ` \ �` \ l / EASEMENT / \\ \`\ ` \�� \ \ \ �� �` �� �� __�_� w w W W ` ` ` ` ` ` ` ` / / / �/� - / / / / i� b1ti / ------ g5 �' g52 -- , ,I- / _ - -- WDOWN TiM �.3�1 DA p ; / \ l �` �` / / �\ / � � \� . , `�`,/ -� � � � / ' / \� \� / // // / / �--------- ------- � _ - 856 CP -- 860- - - / - �T/ TSSB-1 / / / �J / ���// __- _ / / / / i �- __ 2----- \\ \\ / l �,y ---- ------ - //' �� \ \ / // \\ \ ` `\ ` `\ // / ♦ / / ��/ ✓-iii�_��-__ --�/�' /' / - - - - - _� - - - ----- /� l l �\ \ \zz `\ 0 / / - -r--DIVERSION DIV-4 <p6 \ \ ` ,� ,1 / : / /� �i / i -� \ -' / /------------- 866-------- DITCH TO __ � / � �\ \ \ \ I --- _�_ 1 // \\ 0 y _ / / / �_� \ / ) '/i�� / / / --- DIRECT UPSTREAM-- 868- OFF ANY FROM Ss6, \ \ \ \ I �� �� ,� --- \� �` � / r/ /' `� ` / / ` TEMP. �/ / /Z i //�> 1// / / / ���� _ -- / / �ti / / SKIMMER & / / / / / c _ \ / / / 816 r � - -_ � / �- / � LAND DISTURBANCE l �\ \ \ \ \ I ---- `� / '/---- ��` `� `•� / /-- � _ / / _� / BARREL / �, � - / / \ //// \��� --�_ �� / ' / �� EMERGENCY / / ���_ -� / / / / / / 0� / - / / _ \ / / / / a3 SPILLWAY/WEIR /ii /// 20 1-874 ��/ �---,j ``\� `\ `` �`` �`` �`` DIV-7 / /% ////�- - -� / I \ \ \ ` / �� _ / --- /-- TEMPORAP9'-SKJMMER SEDIMENT BASIW-i1" / \ \ � , , , , , , , , , , , , , A� g2 a26 - -- ----- -DRAINAGE `AE - - ' � DIV-7 �`` � � � �`` � � � � i AREA.- --4. J I / ----- 8,3 - ---�/ / � - �,�\ I / �I \�\ \��� - � / ----- � / �-- DIS76PBE"REA: 6. C�6- VOL NM HEQUIRE�Bs�' 4 S6Ii3FACE ARE : _ 4,93 SF - BOTTO�MENSIONS• 1�0'Lx519�IN `` ` ````\`\ `` ` ` \` � \ \ DIV-7 / ;`\`�``` � ` `\`� � `\`� �` \ � ` ` ` ` _- _� ��`�`\��;� `� - - � -- - ----�-- _-------- / - - WEIR ELEV 4.0' `------- -_ BOTTOMEL 824�0, / / ----- �,'� \\ _-_ - -- I --_-- __--- //' /i - ------ 838 - - BANKMENT EL 828�' \ \ // / // ��� \ / / / / l % l / \\ �ij `----_- ----�- ���-- _�� _ SKIMMER DIAME R \ 2.0" __-_--- -� DIV-6------J',�----------------\ ORIFICE NMETER. \�.O" _ DRAWDOWN 3 144 DAYS DIVERSION DITCHI�------------ _ DIRECT UPSTREAM a� I \ \\ // / // I / / / / , // / _-- RUN-OFEAWAYaOM------------------------------�-�� - \\ / // / // / / ////��-- - LAND DISTURBANCE -------------_-------- 4" 03 / - -� -f ��b\ a �a / - 25' REAR SETBACK -/ / - = \ �- - L -rn- 1 -- AR=SETBACK -/ - \ / / I , 0 �0 / - / / �- -` / _--------858 8S 00 / j age W-- W- W �-/ ----� � �� 8¢4 �� 6 \\ \ \ \ 846,� `~��� 836 ----- �= -, \-844 --- ��------------------------------------------------------------ /--------- --- �- ----------------------------------------------------- ----------------------------------------------------------- ------------ -------- ----------- r---------------�-- I\ //�ASHMONT FOREST COURT // o II F-------------L---------------- 1 L- - ------------------------------------------------------------------G------------------------------ --------/ ,''--- w I-L --------------- ----------------------------------------- ------------------f------------------------ �� I-------- ,, J 0 z LEGEND EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN CONSTRUCTION SEQUENCE • t TEMP. GRAVEL CONSTR. ENTRANCE TSSB TEMP. SKIMMER SEDIMENT BASIN 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISWLLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. INITIAL PHASE (SEE SHEETS C04.01-004.041 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT 1. INSTALL TREE PROTECTION FENCING. REQUIREMENTS. ��, X. SEE DETAIL SHEET _._ SEE DETAIL SHEET �_ 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING • ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO ♦�♦ '----- - EXISTING CONTOUR ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF TEMPORARY BASINS. TEMP. INLET PROTECTION DEVICE SEE DETAIL SHEET _._ FINISHED CONTOUR OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE LAND DISTURBING ACTIVITIES. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND TEMP. CONTOUR LOCAL AUTHORITIES OR ARCHITECT. CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM TEMP. DIVERSION DITCH /BERM �-� 4. TOTAL DISTURBED AREA: 30 AC. EXCEED THOSE ABOVE. 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. SEE DETAIL SHEET _._ (TEMP. GRADES DURING CONSTR.) 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PR01ECi7ON AFTER WORK STOPPAGE EACH DAY. SEE TEMP. SILT FENCE TEMP. ROCK PIPE INLET PROTECTION DETAIL SHEET C701. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY SEE DETAIL SHEET �♦ SEE DETAIL SHEET _._ 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH ARE ESTABLISHED AT FINISH GRADE. TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. _._ INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE MANUFACTURER'S INSTRUC110NS ® TEMP. REINFORCED SILT FENCE OUTLET SEE DETAIL SHEET CHANNEL LINING SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL SAND OR 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETATE STEEP SLOPES (GREATER THAN 6H:1V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND _._ PERMANENT OUTLET PROTECTION SEE DETAIL SHEET _._ OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. SELF RULES STORM CONTROL MEASURES SCM DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, ( ) COVER IS ESTABLISHED. THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, SEE DETAIL SHEET _._ B TEMP. DEWATERING SILT BAG SEE DETAIL SHEET 8. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT EROSION CONTROL DEVICES STOCKPILES SHALL BE STABILIZED REQUIRED -INSPECTION EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE 22 VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED MULCHED LINED AND ANCHORED / y \... TCW TEMP. CONCRETE WASHOUT AREA SEE DETAIL SHEET _._ AND AND MEASURES. AS AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS � AS SHOWN IN SLOPE AND STABILIZATION NOTES IMMEDIATELY UPON INSTALLATION. _._ TEMP. SEDIMENT TRAP TEMP. PLASTIC LINING, SEE TEMP. BASIN SEE DETAIL SHEET _._ 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UN71L ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES 23. INSTALL SILT BAG INLET PROTECTION ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. BAFFLES ON DETAIL SHEET _._ TREE PROTECTION FENCE BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. CD TEMP. CHECK DAM SEE DETAIL SHEET _._ 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. V SEE DETAIL SHEET _._ TCS 11....0......, TEMP. COMPOST SOCK, AREAS WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY LANDSCAPING, () ( FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT SLOPE & SURFACE STABILIZATION 7. INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS 25. CALL FOR INSPEC110N OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS IMMEDIATELY FOLLOWING GRADING. TEMP. COFFER DAM SEE DETAIL SHEET _._ OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE. O SEE STREAM CROSSING/CULVERT ,;�;. TEMP. COMPOST SOCK IN CHANNEL, ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES SEE 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). INSTALLATION DETAIL SHEET _._ SEE DETAIL SHEET _._ ORDINANCE. SHEET C705. 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO D TEMP. SLOPE DRAIN 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS. REMOVE MEASURES TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. SEE DETAIL SHEET _ _ 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. ,NIP TEMP. J-HOOK PROTECTION o PROPOSED STORM SEWER PIPES 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS Li SEE DETAIL SHEET _._ EXISTING STORM SEWER PIPES 14. ANY DEWATERING OF STORM TILITY TRENCHES IS TO BE DONE THROUGH A SILT BAG N THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY TEMP. 17MBERIBRIDGE MAT 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS. EXCEED MINIMUM REQUIREMENTS 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. SEE DETAIL SHEET _._ - CONSTRUCTION LIMITS 16. CONTRACTOR SHALL USE 71RE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION UNLESS OTHERWISE NOTED. ENTRANCE IS FOUND INSUFFICIENT. INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL •, TEMPORARY COCONUT SLOPE _ IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. MATTING SEE DETAIL SHEET COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MA T17NG PER MANUFACTURER'S INSTRUCTIONS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS GRAPHIC SCALE INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND 40 0 20 40 8a 160 t, TEMPORARY STOCKPILES. w 16. BEGIN ROUGH GRADING OPERATIONS ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: vk CAP c SEAL .,.• 3 - '0 ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: FINAL EROSION PLAN AREA 1 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.05 z 0 U) 0 w J Q z LL CID 0 U L6 0 0 U H w w U) F- O J d U 0 0 U L7 a� 0 0 c 0 U A) 0 d ti LEGEND TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET _._ TEMP. INLET PROTECTION DEVICE SEE DETAIL SHEET TEMP. DIVERSION DITCH / BERM SEE DETAIL SHEET TEMP. SILT FENCE SEE DETAIL SHEET ® TEMP. REINFORCED SILT FENCE OUTLET SEE DETAIL SHEET _._ PERMANENT OUTLET PROTECTION SEE DETAIL SHEET _._ TOW TEMP. CONCRETE WASHOUT AREA SEE DETAIL SHEET TEMP. PLASTIC LINING, SEE TEMP. BASIN BAFFLES ON DETAIL SHEET CD TEMP. CHECK DAM SEE DETAIL SHEET TEMP. COFFER DAM SEE STREAM CROSSING/CULVERT INSTALLATION DETAIL SHEET _._ MP TEMP. J-HOOK PROTECTION LrI SEE DETAIL SHEET TEMP. 17MBERIBRIDGE MAT SEE DETAIL SHEET _._ TEMP. SKIMMER SEDIMENT BASIN TSSB SEE DETAIL SHEET __ EXISTING CONTOUR FINISHED CONTOUR TEMP. CONTOUR (TEMP. GRADES DURING CONSTR.) TEMP. ROCK PIPE INLET PROTECTION j SEE DETAIL SHEET CHANNEL LINING SEE DETAIL SHEET B TEMP. DEWATERING SILT BAG SEE DETAIL SHEET -.- TEMP. SEDIMENT TRAP SEE DETAIL SHEET TREE PROTECTION FENCE SEE DETAIL SHEET TCS10100000001111 TEMP. COMPOST SOCK, SEE DETAIL SHEET _._ "TR& TEMP. COMPOST SOCK IN CHANNEL, SEE DETAIL SHEET _._ D TEMP. SLOPE DRAIN SEE DETAIL SHEET _ _ PROPOSED STORM SEWER PIPES EXISTING STORM SEWER PIPES CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED. TEMPORARY COCONUT SLOPE MA T17NG SEE DETAIL SHEET 03 41 II E 1IIii \ IfIiy� ��I csIIIT/ III I� h - 'II I •_I I -\_ �a-; -u •-;-:=i-• t�- -/-mo-/=/-r-- ---'- ---------a/g-- a/-\ -- / - -/- -----i -/i - - CID e �/2 / B8A /- �- /• / / '_A LZQN/-/u V---------- FTj / T�- P/ ! 46 5 870 FT GO CO '" / //BENCHMARK TOP OF // 3160 BM TOPNUTOPERATING BOLT 900.65 DIV-3 DIVERSION DITCH TO DIRECT UPSTREAM � -�8'5/ 52 6 - - 10 "; al Qq 6" UKN fJ 7' SIDE SETBACK 4" CEDAR IJM8 12CHERRY 12OAK CLSHRUB 3 '25' REASETBACK 892 ------RIVE--------------896 894 -0 ---r-------DEXTER D - 894 Ea ------- -- - -E E _E - -_ -E 896 E -- 1 896 - - - - - - - - - - - - - - - - ---- Xx r N:V / /T I � I I I EROSION CONTROL GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISViLLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR ARCHITECT. 4. TOTAL DISTURBED AREA: 30 AC. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK STOPPAGE EACH DAY. SEE DETAIL SHEET C701. 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. B. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UN71L ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTiL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. 14. ANY DEWATERING OF STORMA71LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS. 16. CONTRACTOR SHALL USE TIRE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION ENTRANCE IS FOUND INSUFFICIENT. 1Z CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. MAINTENANCE PLAN 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED THOSE ABOVE. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER MANUFACTURER'S INSTRUCIIONS 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. SELF -INSPECTION RULES SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. SLOPE & SURFACE STABILIZATION GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES. SEE SHEET C705. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED MINIMUM REQUIREMENTS INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MATTING PER MANUFACTURER'S INSTRUC110NS. CONSTRUCTION SEO UENCE IN171AL PHASE (SEE SHEETS C04.01-004.04) 1. INSTALL TREE PROTECTION FENCING. 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF LAND DISTURBING ACTIVITIES. 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT STORMWATER CONTROL MEASURES (SCM) DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. Z INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS IMMEDIATELY FOLLOWING GRADING. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL MEASURES. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-004.081 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND TEMPORARY STOCKPILES. 16. BEGIN ROUGH GRADING OPERATIONS 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT REQUIREMENTS. 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO TEMPORARY BASINS. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERA T1ONS PROGRESS. INSTALL INLET AND OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY ARE ESTABLISHED AT FINISH GRADE. 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETA TE STEEP SLOPES (GREATER THAN 6H.1 V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND COVER IS ESTABLISHED. 22. VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS AS SHOWN IN SLOPE AND STABILIZATION NOTES 23. INSTALL SILT BAG INLET PROTECTION ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. GRAPHIC SCALE 40 0 20 40 80 16C ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 2751 B Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: c SEAL .,.• 3 _ Oi ti q mu1101, ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: FINAL EROSION PLAN AREA 2 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.06 z 0 U) 0 w J Q z LL Co 0 4 0 U L6 0 0 U 6) H w w U) F__ O J d 0 U 0 0 U a� 0 2 0 0 c 0 U A) 0 d r` /� � �♦ / EMERGENCY - /SPILLWAY 1gk1�=; 792 MATCHLWE AREA 4 1%, -- ;� _----__ AREA 3 24, �, \\ INSTALL PERMANENT I g2 DIV-18 CHANNEL 13 UPON CHANNEL ,3 / - / / / S / '� / / ' - REMOVAL OF TSSB-6 / - I ♦/ / / / j // ^ \ TEMPORARY OUjCET PROTECTI SKIMMER & \ g - BARREL 13'Lx4'Wx27'TH' CLASS I �% i 80 / / EMERGENCY /// / , - - SPILLWAY/WEIR \ \ \ \ TEMPORARY SKIMMER SEDIMENT BASIN �6 I \ / - - �� � � � � � / / / � � ( / DRA(TSINAGE AREA: 1.20 AC TSSB-6; . \ -�i _ // / �- T_ ♦ V DISTURBED AREA: 0.3 AC I J ♦ 16 _ VOLUME REQUIRED: 540 CF I ' : N - _�-` `� �' ♦ Q,♦ \ \ \ \ \ 8 0 SURFACE AREA REQ. 932 SF BAFFLES `" ' %'� DIV-12 /' / \ / \ - -♦- - ♦ \\ TEMPORARY SKIMMER SEDIMENT BASIN #3 BOTTOM DIMENSIONS: 31 Lxl6'W ''�� _ _ - - - � �,/ y♦ ' -\ - - \ \ \ \ \ 2 BOTTOM ELEV. 810.0' I � r 4- � � ♦ I WEIR I � � • � � � � � � � / / �/ � � \ ♦T♦ �" ♦ � \ DRAINAGE AREA: 4.22 AC WEIR ELEV. 812.0' I ` ` ♦ ♦ - / _ - - - ` ` / \ o_ �} - TSSB-3 _ - DISTURBED AREA: - �056--2� \ \ \ \ \ �Cp \ �' / OUTLET / - - ` ` // / ♦ ♦ �_- \ \ \ 6 EMBANKMENT ELEV. 814.0' I / - p4 - _ / / SURFACE AREA REQ. 3,279 SF SKIMMER DIAMETER: 1.5" ` ` ` ` - _ � . � � . � � .� � � . � � / \ BOTTOM DIMENSIONS. 74'Lx39'W \ \ \ ORIFICE DIAMETER: 3/8" I \ I -�� ```-BDIT0M E•EV en7.0' ORAWDOWN TIME 4.87 DAYS WEIR ELEV.\ \ o EMBANKMENT ELEV 811.0' I EMERGENCY SKIMMER & J / - _ - - 1 - - - <- _- •--- -;_.'- � � SK�IAMETER.T-�.Tl"---_ \ SPILLWAY IR BARREL - _ - ___ ` \ ` ` ` - ORIFICE DIAMETER: 1.5" DRAWDOWN TIME 3.44 DAYS TST-1 `` �``�� �� TSD-2 \ -- --- - \ \- � II/ / / / BAFFLES ,� ,,�,` ,� ,�,`,,�, ,``,�,`, �`,, - \ �-------- �, \ 820 818 TEMPORARY SEDIMENT TRAPjV (TST 812- _ � 808 \ �a / j / / / / � . � � � � � ` • � � ` • � � • � � ` • � � \ DRAINAGE AREA: � D:fi�IL� VOLUME REQUIRED: 2,160 CF _--- -� X \ 7" SIDr FCK SURFACE AREA O-NS. - 713I� - \ / / / `` \ ` `` \ ; \ \ \ BOT SIONS: 3OL812 0' 'WBOT / / ` ` ` ` � ` ` � WEIROM ELEV.LEV: $�2�_ OM-FAWKWEVI WEIR LENGTH: ELEV. 417.0' _-- ---------836, \ PORARY SEDIMENT BASIN 2 TSB-2 1 / / /� //// // // 00000 DR GE AREA: 2.05 AC DISTURB AREA: 2.05 AC / I �i //j% / / // / / /� � �` ` `38- VOLUME REQ�1R DD: 3,690 CF 8 ------ % - - --- \ ---- \ �\ \ 86MM ELEV.• 809.50' // // / �� ��I / /' `` ` ` 840- - \ RISER -TE . TOP ELEV. 813.50' �// / / / / / / / / // i / - - _ _ _ __ _ EMBANKMEN LEI., 816.00' \� - 8 SKIMMER DIAME 0.75" ORIFI-11METER: 1.5" I DRAWDOTIME: 2.7 DAY jLIZE DETEEATON WETLAND DIM NSION \\ ♦ _----- �/♦ //'- 4 'n SE&DETAIL SHEET. X N` // � 10 to to I- \�too ti� �:> // / _ -- - - - - - - - - - - \ \\ 40 / lJ III I \ I I / I /// /// / �/ •� I x / ` `. `. x // - --- -''� - 5 SQ 100 840 ' x / . � gpfFy.�'41 �' y / 20' PUBLIC / EASEMENT / \ \ \ \\ WATERLINE / / / x \ s I ; x ' - ` --_ l/0/ l// I / / I I �� I i l l.' SC /1 / i s -- /� // �// // /%'�/%/ / i I �;•r l WET POND / x \ `�\ \` - - - - \\ \ PPE: �26.5 // ; �. -� / /' / / DIV-10 rn\ - - - - -�- X-- E -- E-- E E - - - E II \ /// 6� / // // I �I I -- ,---------T-----------fir_ \ ;- \ ,,I I I I I I I N II 1 / ��/�;/-32 to / / / ' I \ cop, \--- WKWOODDRIVE / -----I------� ----- T-----�---- ----- j --- /7 �o �I mom' m "' 1 I �I /� EMERGENCY SPILLWAY k 1 / a50 7' ,SIDE SOECK// / / / /'��/ 1a//i// - / DIV-9 /' / /' / /-- CL /p f I 20' PUBLIC / / / / / /� q� / ♦ / I r I r / / x o / / W WATERLINE / / / / / J / /� / /// / / / ` ` `� ` ` o I I EASEMENT / / / / /// / ///�/ / .` .' =' .� 7 / / / / / ` ` ` ` ` ` ` ` ` I--___-- 1I w� w w w T w w w w 858 `Q�` �► ' ' / ,'p 20' PUBLIC .� `� / y' /' / F���� / / / 1hi -�/ WATERLII I \ \ \ \ \ TEMP. EASEMENT 1 / \ I I 1 1 \ \ \ \ \ \ s1 6 x } r SKIMMER & s S / - I7L A\ / BARREL / / / // // / // / _ / S -- - � x / I I I \ I EMERGENCY / /' / • 7 CD� S / / / -\ - - - - - - r -7 I� I EMERGENCY I \ SPILLWAY/WEIR �`.` ` ; // / \ *--------- _- SPILL WA YIWEIR \ I `. `� .� / nf / C / g58 / / 850 - - - - - -- - -- LEGEND •�_ 'r . " t TEMP. GRAVEL CONSTR. ENTRANCE SEE DETAIL SHEET TSSB TEMP. SKIMMER SEDIMENT BASIN SEE DETAIL SHEET • �♦, X. _._ TEMP. INLET PROTECTION DEVICE - - - EXISTING CONTOUR �`�� SEE DETAIL SHEET _._ FINISHED CONTOUR TEMP. DIVERSION DITCH / BERM TEMP. CONTOUR SEE DETAIL SHEET _._ (TEMP. GRADES DURING CONSTR.) TEMP. SILT FENCE TEMP. ROCK PIPE INLET PROTECTION SEE DETAIL SHEET _._ �♦ SEE DETAIL SHEET ® TEMP. REINFORCED SILT FENCE OUTLET CHANNEL LINING SEE DETAIL SHEET _._ SEE DETAIL SHEET PERMANENT OUTLET PROTECTION SEE DETAIL SHEET _._ B TEMP. DEWATERING SILT BAG TOW TEMP. CONCRETE WASHOUT AREA SEE DETAIL SHEET _._ SEE DETAIL SHEET _._ TEMP. SEDIMENT TRAP TEMP. PLASTIC LINING SEE TEMP. BASIN SEE DETAIL SHEET _._ BAFFLES ON DETAIL SHEET _._ TREE PROTECTION FENCE CD TEMP. CHECK DAM SEE DETAIL SHEET **moo SEE DETAIL SHEET _._ TCS TEMP. COMPOST SOCK, TEMP. COFFER DAM ,............, SEE DETAIL SHEET _._ SEE STREAM CROSSING/CULVERT TC$� TEMP. COMPOST SOCK IN CHANNEL, INSTALLATION DETAIL SHEET _._ SEE DETAIL SHEET -.- D TEMP. SLOPE DRAIN SEE DETAIL SHEET _ - �iP TEMP. J-HOOK PROTECTION o PROPOSED STORM SEWER PIPES Lrl SEE DETAIL SHEET _._ EXISTING STORM SEWER PIPES TEMP. 17MBERIBRIDGE MAT SEE DETAIL SHEET _._ CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED. TEMPORARY COCONUT SLOPE MATTING SEE DETAIL SHEET EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISVILLE AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR ARCHITECT. 4. TOTAL DISTURBED AREA: 30 AC. 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK STOPPAGE EACH DAY. SEE DETAIL SHEET C701. 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING SITE STABILIZATION. INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. 8. SOIL AND OTHER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUCTION LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS INDICATED IN THE SLOPE & SURFACE STABILIZATION NOTES ON THIS PLAN. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE 10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY SEDIMENT BASINS. 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. 14. ANY DEWATERING OF STORMA71LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG 15. GROUND COVER IS TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS. 16. CONTRACTOR SHALL USE TIRE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION ENTRANCE IS FOUND INSUFFICIENT. IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND STABILIZATION TABLE ABOVE FOLLOWING COMPLETION OF ANY PHASE OF GRADING. (ABOVE) 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED THOSE ABOVE. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6.1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS 5. ALL OTHER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. SELF -INSPECTION RULES SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. SLOPE & SURFACE STABILIZATION GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES. SEE SHEET C705. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS THE CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY EXCEED MINIMUM REQUIREMENTS INSTALL TEMPORARY EXCELSIOR MATTING FOR STABILIZATION DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY COCONUT MAT IN AREAS IDENTIFIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFICATIONS. INSTALL MATTING PER MANUFACTURER'S INSTRUCTIONS. CONSTRUCTION SEQUENCE INITIAL PHASE (SEE SHEETS C04.01-004.041 1. INSTALL TREE PROTECTION FENCING. 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF LAND DISTURBING ACTIVITIES. 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT STORMWATER CONTROL MEASURES (SCM) DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. Z INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS IMMEDIATELY FOLLOWING GRADING. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL MEASURES. 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND TEMPORARY STOCKPILES. 16. BEGIN ROUGH GRADING OPERATIONS 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCOWR PERMIT REQUIREMENTS. 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO TEMPORARY BASINS. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY CONDITIONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREA TER THAN 6H:IV) AS THEY ARE ESTABLISHED AT FINISH GRADE. 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETA TE STEEP SLOPES (GREATER THAN 6H:1 V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 22. VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS AS SHOWN IN SLOPE AND STABILIZATION NOTES 23. INSTALL SILT BAG INLET PROTECTION ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 25. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE 26. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. 29. CALL FOR INSPECTION OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 16C Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: G SEAL ,,.• q ti ISSUE LOG Distribution Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Date No. Drawing Title: FINAL EROSION PLAN AREA 3 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.07 0) 7 Z 0 Z5 0 Qr W J z LL CID 4 0 U L6 0 0 U 6) F- W W U) F__ O J 0- 6 U 0 0 0 0 a) 0 2 0 0 c 0 II 0 A) 0 0- I'_ 0 N W > 0 a Q M LL N I N M Mo C N 0)r': c ?: 0- m M LU) \ � - \ \ - � '\ � -x_ __ -'\ pp\ �'' � \ _� �' ` I, -- \ _� s�\\t\\`> \\\ \\ \ ,,w y � � ` -w \ - \ \ ��, ♦zzzk �\ _� _� 03 I \ /I EIJ .i _ \\\ �\ \ \ -�. \-- 1 \ / '_ 10, \ i %F ' �� � - \ _� BENCHMARK - TOP OF OPERATING BOLT 827.29 / / FR \ _ N� RD F \ _ �- J I \�_ C \ I �q . ~ W `� \ 7058 BMFHTOPNUT «. \ \ ` \ \ C ��7 DIV-18 is \ \ \ / * t». \ \ C --A \ \zz:� --- I / -�-_ J / / / \ Ro 1 \ \� e� \ \� - \ ` -1- �\ / T\"\ \ , _ -- w \ \ / / _ / 0 IN T L MPORARY 127RCP l - � ' - - W z \ I ' / / E SIO OF EXISTING PIPE l l \\� \ -- "�� F� v _ -_ A _ / / ?,t; / R ONSTRUCITON lb' l \-_ \ \ --W �_�_� ��__-_ z____ _ _ E / \ �- --- \ - _�� - __ _\� - - ------ / / p \ _ \ N� / �- DIV-13 qC/r \ \\ � __� __ 03 w -- \\ \� CD '�' O I / / o/ �� �� \ - \ - - -_ _ � CP \ - _� �-_ I / / _ -_ _ �_ I / % // l I $32 TEMPORARY OU PROTECTION �" j� j I �!/ >� \/ �_ /^�_=�_ J �---__ i p�OD/��QO`W �\! ��I n! ��98 / 20' PU C TSD-1 iO'Lx4'Wx27"TFl CLASS 1 RIPRAP ) / 1% ", / /- - - j - -� 0 /t�/ D RQ� �'C� �t \ � / ?� a j - _ _ _ TEMPORARY SEDIMENT BASIN 2 (TSB-2) I 1 WATERLINE / 66-LF I / JHP 4 p I / _ - _ - - _ _ =- �L7� j P p D ' - - _ _ _ �t - \ DRAINAGE AREA: 2.05 AC / l l 15 HDPE / / 0, / E / / _ / -_ ' - 1 - - _ _ _ U• I J - �� /G' W DISTURBED AREA: 2.05 AC I EAS ENT / I / �, / �� / - \ / ' I 13J% --_/ �' \ VOLUME REQUIRED: 3,690 CF I / ) / / / \ �`N �E � /'_ � _------_ -g_ \ SURFACE AREA REQ. 3,289 SF / _ - - _ / % �,`� / \ ,moo/ o�' / / z � 'c E _�� � __ - ~` - - - _ _ \\ \ / ' � ' BOTTOM ELEV. 809.50' �$ / / �' / _ O / - _ / / / I _ _ \ / / - / RISER TEMP. TOP ELEV. 813.50' / / / / / - - / / / ` E _ _ _ _ \ � �` EMBANKMENT ELEV: 816.00' - - 1 / / / / E - '\\- // / /// __ // / � \ - - / / - -----_ ----_ SKIMMER DIAMETER: 0.75" I �' // __/� // / p� / I E __� ORIFICE DIAMETER: 1.5" I g / 1 /' / / / / � \ / / / / / / / \ // / / / \ �` E ` - f' 790 DRAWDOWN TIME. 2.7 DAYS / / / I - _ _ - / / Q / / / ' r --\ U17LIZE DETENTION WETLAND DIMENSIONS / / / / 7 � / - _ / / \ �`01) / / \� \ SEE DETAIL SHEET. � / / / P / - - _ - /' / \ _ _ __/ L �i / TSB-2 ; i� TEMP. --- -_ /// /// y/ \ \ ro�f i i SKIMMER ///' / \ � '-11 \ 3 �!� - /// / i- - �'/ - - - - / / / / / / \ � _L _J- N 2 - - I I I - I I \ 11 1-1 i� - -'r �� T� _ _ / EMERGENCY ___---� __// / / / '/ / \ / �_� _ . . ��� /�/ / �� . __ 8 , � I / g SPILLWAY / // / � /- �- - /// // IL - �IF----\�\\ / �- -,__ / _/'/ �82 I �`f - - ---__- / / / / //� �\ / 9k - \ . 792 _ \ \ I/ - - J " / � -" - ---� MATCHLiNE AREA 4 6-� y�•^ - '� ..::'" /� - _\---____ - \ AREA 3 // - ,- _- /� /- �� oo _/ �. �- \\ \ �_ % _ //\ \ '-/� - � --- Soo---��/G '6 � / /�-\\ __ - - _ � ->� �' \- \�� __- / \\ I - i �� i ::: � /� \\� \ / � /' _�z DIV-18 ---/ / / fi // / �\ / -_/ /� \\\�\_-_ - - \ INSTALL PERMANENT - � a2 \ _ -, / CHANNEL 13 UPON CHANNEL /3 / - / / /' B /%� __ i / ' - TEMP. - - / \� �\ \\ \ REMOVAL OF TSSB-6 i , / o �/� %� - / � � / TEMPORARY OURET PROTEC71 \ B SKIMMER & Z - - - - \ \ \ \ - - � - _ \\ I - ro %%- �J A- - BARREL - -� \ /� -� \ / i// ^ __13'Lx4'Wx27" CLASS Rl� P - \ \ / / /I I // / / / / / / / / / / / / / / 0 / / / / / \\ \ \ . �- \� � � \\ / / / / �\ / / l \ \\ �\ \� \ \ \\ /' �/ // /�/ // // // /� �/ �� / / // // / // / // // // / / / 1 1\\ I / / / / � / / / / / / / / / / / // / // / \) \ \ / / / / / II/ / // / 1� � I \ J / -_/ _/ / // / / // // / / / / // / // / / // / / \11 /_-- �__ \ / / / / / / / / / / / / � -=_ \ �� \ \ - I- / / / / / / 1 �--_-_ , __ __1 L z 11 1_1 / / / / z Z/ / / 'I--- __ _____�__.� - __�_�. \\\ \ ��/' - - __� " / -11 // / IT / 11 - X '/ / ' _� \ _ -__� -- �,.y / CGS / SS -ASS / / / I�P�. / / / / / ��� /�� �� -- / / \11 �\ \ k / /// CS '.���ii / // �S��T // HP // / / , / / �/ / 11 "� / 90 1g2 /� / �/ / \\\\\I 1 ` . / \ __� \ 16 \ \ - / Ss�- / / / / / / / l -- f/_/ / _- �\ II _- _", -- - J _ *$ _/-�� �SS�- / / / / \\\y P / / / / / / / / / / / J / / / /� /. �- - �' _/- / ap0 \\\ \\\ / � 1 / / \ ) ��/ �>�5��� ASS ..��i/��' /�/ ,/ / / / //' // /' I // /' /' /'/ /'// /'�/l lY j // ��� �- `/ �� "�Jn\\\\\\\�\ SS SS -' �__ / \ / / / / / // / / / / / / /` -/ / / / �l / / �� ��' g02 \\\ / / / / / / / / / // /i//Z,/ , 804 -\\ \\ \\ I_ / / / w /_- _ LQ.-'/ __� ,, - �_ / �/ // -__-��/\\,_� /� // // // // // // // /��� /// /// ���/�/ /1 �/ / / / / / /' /' -.� " ,/� ,'_' \\\ \\ \\\ \<� \ 'I Y //// \ l I// -\\\\\\\\\\\\1\) I 11 \ III II - - -- --� _/'----- // �---- _/// /// f // - '�i/ /// /// �/// �� // // // ,� v� // // //// // // // --- /�J-__ 806 �� // / // // // // "- / // // � / _/ � / / // / // --/- /- � \ -),) I 1 I 1 I / / l \� Q - - Q --- �- / ____ _� - -� / / �� - - TEMPORARY SKIMMER SEDIMENT BASIN 2 / - / / - �_ �/r /I / / , , �-� , // / / // // // // // / / �� / /� \�/ /// // / / / // - 808 \) / / / I \ \ � / / /� / / \ - -I \ �\ \I\�'/ 1, - _ _ _ _ - _ ,- - "6.72�tC-� ,- // -� -/ /- /- � , / 1- /7)/ ,� �� �; /- //,i,' ,/ ,�J /-' �',' �\ / // /' / /' //1�1 // / �/ // / // / / / - / \ \\ I I l I l \ \ \\ _ --- DRAAIINNAGE A -A:' ---- ISTURBE6 AREA: --5.52 AC / I�L�1ME REQU EDP 9, /I 1.1 /' -'`\ // // ,11� //� ,/ //�// // 11.1 �/ j_-1 �//�\/ 1 �� _i j/ ,� j/�'// // // ��-- 810 \`\\\\\\I \ i / \ CP I \ \ i / ///��� / l/ \\ \\\\\\\\\\\\\\�\ \ - / "- -,SURFACE REQ: --5,221 SF � �� / // ///��// // _ _/ // � ���/ // / �� / \ / / / � � � / / / � / / / \ NI- - - - -AREA - - TOM DIM NS: 95�x50 W 10ti( 810.0 / i / 1-1 / / � - \ / /-_ i/ / // // �/ // ///� �� _ -_- _���\� �/� �// // // /_/ // ---- - 872 --� \�\ \�\\k� I I I ( I\ / / i � f / / /// /- -_ _- . .� __ / / / / i / /� \\\�\\ \\ \\\-- I I I I / / / � /// / / / / \ \ \ �-- \ � J _ i I W ' /�- /� - / E NKMENT E6Et!�' 814.0% / / __� / / \\\ / / / �i \\ \ \ \ / / // /, �/ / -// / / \\ \ \\� 1 I / / / / / i / / / - ----- / ,>c / / / \ \\\ \ \ \ \ \ z \ \\\�� I. --t / / �W _� / I I DIAMETER: /�2.0" /� / / ,i/ , / /ii/ ,- j/ ��/� �/ �' i/ / // // --- -- 814 -- \\\ -�\�� \ / / i / -- --- _ _� / \- \ \ \� I / / i /i / / / / \ \\ \ \\ \ �\ I \ \ - - - - ORFi�E DAME" 1. / - / / / I �� / __-_-/ `��J " \ \ S$ f - A WIN TIME. 4.85 D �j'_; EMERGENCY / / / / i / � \ \ \ \ \ / / / // / j / - / - - � __ \ �\ / / / / - 816 \ \ \ \\ \ - \ - 22 ��/ ` - J /� SPILLWAY WEIR / �� /� / / / - - - - _ \ � - - // / / // / / / / --- // / // / ��� \ \ \\-\ �\\ \\ ��� \ \I\\ \\ \ �� \ TEMP. � / / / / / / / / '- / \ \ \ _\ \\ \\ 11 80, / / SKIMMER & _� /_/ i / / i / / / / /r r / -- \ \ \ -- \ o / / \� / / �__ / /- \ - \ \ \ / / / / // / / - i- \ \\ - _- _ - \ \\ f �/ BARREL / // - / j /� �� i��"----��/ ����/�---'' -- 818 --_� \\ �\\ \ �-- - 1 1 \ \\ \\\ \\.\\ \ �- J_- // / / �_' `------- 80 6 ' /, - /AI- -- / / / --f -/ -/ \ \ \ \\ \ \ \ \ \ o\ \ \\\\ / -- - _7 _= � / / �i/ %/' '�//�- -'/ /� �/ 8 \ 100 YEAR FLOODWAY \\ \� \\ \\ \ OB I \ \\\ / / \ / / /1-1 /�'- ���/ /�'- ____�--"' \\ 50o YEAR FLOODWAY / // / �/ - i�//- -- / "7 /� // 1-1 I -i \ \� \ \ \ \ \ \\\ \\ �/ -/ 1-1 /�i_-- - / __- -/ i / / /----- \ \ \ \ / /�_/ - -- 820 \ \ � I \ DIV-8 / -� -/-� - / - //- / /j�� �� ��/ � _ _/ --- / _ _- _ \ /� _/�// �- - -_/ // /� �- �\ \\ \\ \\ \\ �1 \\ / 1-1 _i _ .� �i / / __ / / '- 'l i \ �_ =_= - '--�_ / / ------ -" -�/ / \\ \ \\ \ `per - _-_ - - _` - // // --- --_� \✓ \ \ - i i ---- - _�-� - - - _-� -_ -- - ___ \ \\ \ I\ / �� I' - '--� - / 826 --- -- � __� - /1 / - __ \ / /- / - \ // /--------------- --- \ �\ \\ &' \ \ \ __� --------- _____/ 1-1 " f \ \ ----- -----/ \J // '�� /__� I \ 828 -�_� �' "I \�' - -- _-' �-� - -'� �_ --, / /�------- - // /__/ ---� __-------------------------- \_`` \ �\ \ C20 \ \ \ \ 11 f - - - --' / --'\ \ '__ __ __ __ _� I- 1� 11 __ __ \ \ ----- - __� __� ------/' ��/ ""---- _� // _----------- \\ \� \\ 822 � \ \\ \\ - -_\ �\ ____- \\ --__ --- �/ --- ----- 830 \ \ \ _ -1 6 �\l --- ----- _-_--- __- -/ �� \ \\ \� \ \ - � \ LEGEND EROSION CONTROL GENERAL NOTES MAINTENANCE PLAN CONSTRUCTION SEQUENCE . TEMP. GRAVEL CONSTR. ENTRANCE • t SEE DETAIL SHEET TSSB iEMP. SKIMMER SEDIMENT BASIN SEE DETAIL SHEET 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL LEWISWLLE AND NCDOT STANDARDS, SPECIFICATIONS AND 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED ACCORDING TO GROUND DETAILS. STABILIZATION TABLE (ABOVE) FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES B07H INITIAL PHASE (SEE SHEETS C04.01-CO4.041 17. ALL WORK ASSOCIATED WITH STREAM IMPACTS SHALL BE AS APPROVED BY USACE AND NCDWR PERMIT 1. INSTALL TREE PROTECTION FENCING. REQUIREMENTS. X. _._ __ 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING •��,_ . ON AND OFF SITE ALL OFF -SITE SOIL BORROW AND WASTE SITES SHALL BE PROPERLY PERMITTED FOR SUCH 2. OBTAIN APPROVED PLAN AND APPROVAL PLACARD. A COPY OF THE APPROVED PLAN MUST BE ON 18. AT THE END OF EACH DAY, INSTALL AND ADJUST DIVERSION DITCHES TO CONTINUE TO DIRECT RUN-OFF TO ----- - EXISTING CONTOUR ACTIVITIES. CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION OF SEDIMENT & EROSION CONTROL PERMIT FOR ANY TO GROUND STABILIZATION TABLE (BELOW) FOLLOWING COMPLETION OF CONSTRUC71ON OR DEVELOPMENT. FILE AT THE JOB SITE. NOTIFY EROSION CONTROL AUTHORITIES OF PROPOSED STARTING DATE OF TEMPORARY BASINS. �10W� TEMP. INLET PROTEC110N DEVICE *r 0! SEE DETAIL SHEET -._ FINISHED CONTOUR OFF -SITE SITES TO OWNER PRIOR TO RELOCATING ANY STOCKPILE MATERIALS. 3. THE ABOVE REQUIREMENTS ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS. THE 3. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LAND DISTURBING ACTIVITIES. 19. INSTALL STORM DRAINAGE SYSTEM IN DRY COND17IONS AS GRADING OPERATIONS PROGRESS. INSTALL INLET AND TEMP. CONTOUR LOCAL AU7HOR171ES OR ARCHITECT. CONTRACT DOCUMENTS INCLUDE ADDITIONAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY 3. CALL NC DEQ LQS AT 336-776-9800 TO SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF OUTLET PROTECTION DEVICES AT NEW STRUCTURES AS THEY ARE CONSTRUCTED. PROTECT ALL OPEN STORM TEMP. DIVERSION DITCH /BERM SEE DETAIL SHEET �-� (TEMP. GRADES DURING CONSTR.) 4. TOTAL DISTURBED AREA: 30 AC. EXCEED THOSE ABOVE. 48 HOURS PRIOR TO BEGINNING ACTIVITIES ON SITE. DRAIN LINES UNDER CONSTRUCTION WITH STONE FILTER AFTER STOPPAGE OF WORK EACH DAY. _._ TEMP. SILT FENCE 5. ALL OPEN STORM PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECiION AFTER WORK STOPPAGE EACH DAY. SEE �� DETAIL SHEET C701. 4. SLOPE EROSION CONTROL MATTING SHALL BE INSTALLED FOR TEMPORARY STABILIZATION DURING THE ESTABLISHMENT OF TEMP. ROCK PIPE INLET PROTECTION 4. INSTALL CONSTRUCTION ENTRANCES, TEMPORARY CONCRETE WASHOUTS, PERIMETER SILT FENCES, SILT 20. INSTALL SLOPE PROTECTION BLANKETS AND TEMPORARILY SEED STEEP SLOPES (GREATER THAN 6H:1V) AS THEY SEE DETAIL SHEET �♦ SEE DETAIL SHEET _._ 6. ALL STORM DRAINAGE PIPES SHALL BE THOROUGHLY FLUSHED OF ALL SEDIMENT FOLLOWING S17E STABILIZATION. VEGETATIVE COVER ON ALL STEEP SLOPES (6.1 OR STEEPER). REFER TO MATERIAL SPECIFICATIONS INSTALL MATTING PER FENCE OUTLETS, TEMPORARY SEDIMENT TRAP AND TEMPORARY COMPOST SOCKS. ESTABLISH ARE ESTABLISHED AT FINISH GRADE. TEMPORARY CONSTRUCTION TRAILERS WITHIN STAGING AREA. _._ INTERIOR FLUSHING OF SYSTEM SHALL BE PERFORMED AS NEEDED TO MAINTAIN PROPER FUNC710NING OF THE DRAINAGE MANUFACTURER'S INSTRUCTIONS TEMP. REINFORCED SILT FENCE OUTLET ® SEE DETAIL SHEET CHANNEL LINING SYSTEM. 7. THE INDICATED STAGING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL SAND OR 5. ALL 07HER SEEDED AREAS SHALL BE MULCHED K17H STRAW AND TACKED WITH ASPHALT. 5. INSTALL TEMPORARY SEDIMENT BASIN 1 AND 2 (TSB-1 AND TSB-2). UTILIZE PERMANENT 21. RESPREAD TOPSOIL, INSTALL SLOPE PROTECTION BLANKETS AND VEGETATE STEEP SLOPES (GREATER THAN 6H:1V) AS THEY ARE ESTABLISHED. STABILIZE ROADSIDE DITCHES AND CHANNELS DAILY ON71L PERMANENT GROUND -._ PERMANENT OUTLET PROTEC71ON SEE DETAIL SHEET SEE DETAIL SHEET _._ TEMP. DEWATERING SILT BAG OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. SELF -INSPECTION RULES STORM CONTROL MEASURES SCM DIMENSIONS, ELEVATIONS AND GRADES. INSTALL BARREL, ( ) COVER IS ESTABLISHED. THEN OUTLET STRUCTURE FOLLOWED BY THE EMBANKMENT. INSTALL OUTLET PROTECTION, _._ y TEMP. CONCRETE WASHOUT AREA TOW B SEE DETAIL SHEET _._ 8. SOIL AND 07HER MATERIALS SHALL ONLY BE TEMPORARILY STOCKPILED WITHIN THE CONSTRUC77ON LIMITS PROTECTED BY SEDIMENT AND EROSION CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS REQUIRED AS SEE SHEET C706 FOR SELF -INSPECTION REQUIREMENTS EMERGENCY SPILLWAY AND BAFFLES. INSTALL TEMPORARY SKIMMER ON POND DRAIN WITH GATE 22 VEGETATE (OR OTHERWISE STABILIZE WITH PAVEMENT, BUILDING PAD ETC.) IMMEDIATELY TO ALL DISTURBED AREAS VALVE OPEN. ALL TEMPORARY BASINS SHALL BE SEEDED MULCHED LINED AND ANCHORED � / AS SHOWN IN SLOPE AND STABILIZATION NOTES IMMEDIATELY UPON INSTALLATION. .... SEE DETAIL SHEET _._ TEMP. SEDIMENT TRAP INDICATED IN THE SLOPE & SURFACE STABILIZATION N07ES ON THIS PLAN. TEMP. PLASTIC LINING, SEE TEMP. BASIN SEE DETAIL SHEET _._ 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE S17E UN71L ALL SITE WORK IS COMPLETED AND THE FINAL S17E INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERI7nCA7E OF OCCUPANCY (CO). THE FENCING SHALL THE FINANCIALLY RESPONSIBILE PERSON AND/OR HIS AGENT WILL BE PERFORM SELF INSPECTIONS OF THE EROSION AND 6. INSTALL TEMPORARY SEDIMENT SKIMMER BASINS. INSTALL PLASTIC SLOPE PROTECTION ON SLOPES 23. INSTALL SILT BAG INLET PROTEC71ON ONCE CURB & GUTTER IS INSTALLED. PROVIDE TEMPORARY SAND BAGS TO DIRECT RUN-OFF INTO INLETS. BAFFLES ON DETAIL SHEET _._ TREE PROTECTION FENCE BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE SEDIMENTA71ON CONTROL MEASURES USING NCDEMLR'S SELF INSPECTION REPORT (WORKSHEET) AND THIS WILL BE KEPT ONSITE. RECEIVING RUN-OFF AND BAFFLES. ALL TEMPORARY BASINS SHALL BE SEEDED, MULCHED/LINED AND ANCHORED IMMEDIATELY UPON INSTALLATION. CD TEMP. CHECK DAM SEE DETAIL SHEET _._ 10. TREE PROTEC77ON FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED 24. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. V SEE DETAIL SHEET _._ TCS ,.....�......1 TEMP. COMPOST SOCK, AREAS WITHOUT WRITTEN AUTHORIZATION OF THE COUNTY ZONING COMPLIANCE STAFF. ANY ACTIVITY LANDSCAPING, () ( FENCING, OR UnL INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE AREA, SHALL ALSO NOT SLOPE & SURFACE STABILIZATION 7. INSTALL TEMPORARY DIVERSION DITCHES. SEED AND INSTALL TEMPORARY CHANNEL LININGS 25. CALL FOR INSPEC71ON OF STABILIZED SITE IF APPROVED, PUMP SEDIMENT LADEN WATER THROUGH SILT BAGS IMMEDIATELY FOLLOWING GRADING. TEMP. COFFER DAM SEE DETAIL SHEET _._ STAFF. ANY OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED RI AND REMOVE REMAINING TEMPORARY SKIMMER SEDIMENT BASINS. SEED AND MULCH SLOPE OF ALL DISTURBED AREAS REMAINING ON SITE. O SEE STREAM CROSSING/CULVERT ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT "TR& TEMP. COMPOST SOCK IN CHANNEL, GROUND STABILIZATION SHALL BE PROVIDED ON ALL DISTURBED AREAS ACCORDING TO GROUND STABILIZATION NOTES SEE FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WliH THE LAND DEVELOPMENT SHEET C705. 8. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). INSTALLATION DETAIL SHEET _._ SEE DETAIL SHEET -.- O ORDINANCE. 26. CALL FOR INSPEC71ON OF STABILIZED SITE IF APPROVED, CONVERT TEMPORARY SEDIMENT BASINS 1 AND 2 INTO D TEMP. SLOPE DRAIN 11. ROADSIDE DITCHES AND CHANNELS SHALL BE STABILIZED DAILY UN71L PERMANENT GROUND COVER IS ESTABLISHED. 12. INSTALL TEMPORARY MATTING TO TOP OF ALL SIDE SLOPES ON CHANNELS, DIVERSION DITCHES AND TEMPORARY EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC 9. CLEAR AND GRUB AREAS ONLY AS REQUIRED FOR INSTALLATION OF INITIAL SEDIMENT CONTROL PERMANENT SCMs. EXCAVATE SEDIMENT AND GRADE TO POND FINISH SLOPES AND ELEVATIONS REMOVE MEASURES. TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS. SEE GRADING PLAN AND DETAILS. SEE DETAIL SHEET _ _ SEDIMENT BASINS. CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE (SECTION II.B(2) (b)) INSTALL FOREBAY BAFFLE. SEED AND MULCH ALL DISTURBED AREAS. ,NIP TEMP. J-HOOK PR07ECIION o PROPOSED STORM SEWER PIPES 13. ANY DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE, REMOVAL OR CONVERSION PURPOSES IS TO BE DONE THROUGH A SILT BAG. THE REQUIREMENTS ON SHEET C705 ARE THE MINIMUM NECESSARY TO MEET EROSION AND SEDIMENT CONTROL REGULATIONS 10. CALL FOR INSPECTION OF INSTALLED DEVICES. 27. REMOVE TEMPORARY SKIMMER BASINS AND SEDIMENT TRAPS. SEED AND MULCH ALL DISTURBED AREAS Li offib SEE DETAIL SHEET _._ = _ _ _ = EXISTING STORM SEWER PIPES 14. ANY DEWATERING OF STORM i1LITY TRENCHES IS TO BE DONE THROUGH A SILT BAG THE CONTRACT DOCUMENTS INCLUDE ADD1110NAL SEEDING AND STABILIZATION REQUIREMENTS AND SCHEDULES WHICH MAY N EXCEED MINIMUM REQUIREMENTS 11. IF DEVICES ARE APPROVED, PERFORM DEMOLITION AND CLEARING OPERATIONS. 28. REMOVE TEMPORARY CONSTRUCTION ENTRANCES, CONTRACTOR STAGING AREA AND ANY REMAINING TEMPORARY TEMP. 17MBERIBRIDGE MAT 15. GROUND COVER IS TO BE APPLIED PER CON017701VS OF THE NPDES PERMIT OR AT THE END OF THE DAY IN CRITICAL AREAS. 12. MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. MATERIAL STOCKPILES SEED AND MULCH ALL DISTURBED AREAS. SEE DETAIL SHEET _._ - - - - CONSTRUCTION LIMITS 16. CONTRACTOR SHALL USE 71RE WASH STATION TO PREVENT SEDIMENT FROM TRACKING ONTO THE ROAD IF CONSTRUCTION UNLESS 07HERMSE NOTED. . . TEMPORARY COCONUT SLOPE ENTRANCE IS FOUND INSUFFICIENT. _ INSTALL TEMPORARY EXCELSIOR MA771NG FOR STABILIZA71ON DURING THE ESTABLISHMENT OF VEGETATIVE COVER ON ALL STEEP IZ CONTRACTOR SHALL UTILIZE PAM FLOCCULANTS TO REDUCE RUN-OFF TURBIDITY. SEE SPECS. SLOPES (6:1 OR STEEPER) AND AREAS OF CONCENTRATED FLOW (CHANNELS, DITCHES, SWALES, ETC.). UTILIZE TEMPORARY CONSTRUCTION AND MAINTENANCE PHASE (SEE SHEETS C04.05-CO4.08) 29. CALL FOR INSPEC71ON OF STABILIZED SITE IF APPROVED, REMOVE REMAINING TEMPORARY EROSION CONTROL 1.3 INSTALL ALL ADDITIONAL PERIMETER SILT FENCE AND TEMPORARY COMPOST SOCKS. MEASURES SEED AND MULCH ANY REMAINING DISTURBED AREAS. MATTING SEE DETAIL SHEET COCONUT MAT IN AREAS IDEN71FIED ON PLAN. REFER TO SPECIFICATION SECTION 312500 FOR MATERIAL SPECIFlCA71ONS. _ _ INSTALL MATTING PER MANUFACTURER'S INSTRUC71ONS. 14. TEMPORARY COMPOST SOCKS TO BE REPLACED AT THE END OF EACH WORK DAY SO THAT ANY RUNOFF IS GRAPHIC SCALE INTERCEPTED BY THE SOCK PRIOR TO ENTERING ANY CONVEYANCE (DITCH/PIPE/INLET). 15. STRIP TOPSOIL, STOCKPILE TOPSOIL WITHIN CONSTRUCTION LIMITS. INSTALL AND MAINTAIN ALL SILT FENCE AROUND 40 0 20 40 8a 160 t, TEMPORARY STOCKPILES. ����������� ���������������������!!" w 16. BEGIN ROUGH GRADING OPERA7IONS � ( IN FEET ) 1 inch = 40 ft. Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 2 71 01 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Caroline 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 Seal: Q� �. • t SEAL ,,� 3 '0 . r%yi`.. +HS.'W-'-JN.n '' q �y'',►� A- V%,►'''�, 1 '"�08mut$$'," 9 .1`r ISSUE LOG Distribution Date No. Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: EROSION PLAN AREA 4 & AREA 5 NCDEQ EROSION CONTROL Issue Date SEPTEMBER 17, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number C04.04