HomeMy WebLinkAboutNC0032191_Compliance Evaluation Inspection_20190912ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
�ry
44,
NORTH CAROLINA
EnNlmnmrrtlnl Quality
September 10, 2019
Mr. Don Holder, Executive Director
Hebron Colony Ministries, Inc.
356 Old Turnpike Rd
Boone, NC 28607
SUBJECT: Compliance Evaluation Inspection
Hebron Colony and Grace Home WWTP
NPDES Permit No. NCO032191
Watauga County
Dear Mr. Holder,
On August 29, 2019, Kelli Park and Mike Turner, of this office, met with Brandon Hughes,
Operator in Responsible Charge (ORC), to perform a Compliance Evaluation Inspection
at the Hebron Colony and Grace Home wastewater treatment plant. This type of
inspection consists of two basic parts: an in -office file review and an on -site inspection of
the treatment facility. The attached EPA inspection form details the areas that were
evaluated during this inspection.
The inspection of the facility was satisfactory. If you have any questions regarding the
inspection or this report, please contact Kelli Park or me at (336) 776-9800 or by email at
kelli.park(a-)_ncdenr.gov or Ion. snider(a_ncdenr.gov.
Sincerely,
D'ocu Siiggned by:
Li7�. l
1_.49E225C94EA...
Lon Snider
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: EPA Water Compliance Inspection Report
CC' WSRO
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NCO032191 111 12 I 19/08/29 I17 18 I S J 19 L G] 201 I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
671
70 I I 71 I I 72 I r I 73 I I 174 751 I I I I I I I80
u ty I I i
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
01:00PM 19/08/29
17/12/01
Hebron Colony & Grace Home WWTP
356 Old Tpke Rd
Exit Time/Date
Permit Expiration Date
Boone INC 28607
01:30PM 19/08/29
22/09/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Brandon K Hughes/ORC/828-260-5213/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jadd Wesley Brewer,PO Box 1167 Banner Elk NC 286041167//828-898-6255/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenance 0 Records/Reports
Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Kelli A Park WSRO WQ//336-776-9689/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
FLl T Sn. er 9/11/2019
'--- 1451349E225C94EA...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type (Cont.)
NCO032191 I11 121 19/08/29 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On August 29, 2019, Kelli Park and Mike Turner, of this office, met with Brandon Hughes, Operator in
Responsible Charge (ORC), to perform a Compliance Evaluation Inspection at the Hebron Colony and
Grace Home wastewater treatment plant. This type of inspection consists of two basic parts: an
in -office file review and an on -site inspection of the treatment facility. The attached EPA inspection form
details the areas that were evaluated during this inspection.
The inspection of the facility was satisfactory. If you have any questions regarding the inspection or
this report, please contact Kelli Park or me at (336) 776-9800 or by email at kelli.park@ncdenr.gov or
Ion.snider@ncdenr.gov.
Page#
Permit: NCO032191 Owner - Facility: Hebron Colony & Grace Home WWTP
Inspection Date: 08/29/2019 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Page# 3
Permit: NCO032191 Owner - Facility: Hebron Colony & Grace Home WWTP
Inspection Date: 08/29/2019 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑
Comment:
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: Debris are removed, laid out to dry, bagged, and disposed of in a landfill
Equalization Basins
Yes No NA NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Are audible and visual alarms operable?
❑
❑
0
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Comment: 2 pumps are in the basin
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
❑ ❑
0
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
0 ❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
0 ❑
❑
❑
Page# 4
Permit: NCO032191 Owner - Facility: Hebron Colony & Grace Home WWTP
Inspection Date: 08/29/2019 Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Is the DO level acceptable?(1.0 to 3.0 mg/1) 0 ❑ ❑ ❑
Comment: DO is reported to be around 3.5 mg/L
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
❑
❑
0
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
M
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
0
❑
❑
❑
Comment: Sludge blanket was reported to be about 4 ft. The depth of the clarifier is around 12 ft. ORC
reports that it runs best when the blanket is around that depth.
Disinfection - UV
Yes No NA NE
Are extra UV bulbs available on site?
0
❑
❑
❑
Are UV bulbs clean?
0
❑
❑
❑
Is UV intensity adequate?
0
❑
❑
❑
Is transmittance at or above designed level?
❑
❑
❑
Is there a backup system on site?
0
❑
❑
❑
Is effluent clear and free of solids?
0
❑
❑
❑
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0
❑
❑
❑
Comment:
Page# 5
Permit: NCO032191 Owner - Facility: Hebron Colony & Grace Home WWTP
Inspection Date: 08/29/2019 Inspection Type: Compliance Evaluation
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
0
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: Grab samples are taken and preserved on ice.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: Effluent was clear the day of inspection.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Standby Power
Yes No NA NE
Is automatically activated standby power available?
0
❑
❑
❑
Is the generator tested by interrupting primary power source?
0
❑
❑
❑
Is the generator tested under load?
0
❑
❑
❑
Was generator tested & operational during the inspection?
0
❑
❑
❑
Do the generator(s) have adequate capacity to operate the entire wastewater site?
0
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
0
❑
❑
❑
Is the generator fuel level monitored?
0
❑
❑
❑
Comment: Tested weekly.
Page# 6