Loading...
HomeMy WebLinkAbout20081473 Ver 4_Credit Release - Final & Closeout_20191029ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Brad Breslow EBX Neuse 1, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 NORTH CAROLINA Environmental Quality October 29, 2019 DWQ Project #: 2008-1473v4 Wayne County Re: EBX Neuse Riparian Buffer Umbrella Mitigation Bank Instrument (UMBI) Arrington Bridge Phase I and Expansion Credit Release -Task 8 FINAL RELEASE & CLOSEOUT Dear Mr. Breslow: On September 18, 2019, the Division of Water Resources (DWR) received a Year 5 Monitoring Report from Resource Environmental Solutions, LLC on behalf of EBX Neuse 1, LLC (EBX) for the Arrington Bridge Phase 1 & Expansion Mitigation Bank (Site). On October 3, 2019, Katie Merritt with the DWR, visited the Site to compare vegetation data submitted in the report with onsite conditions and to evaluate the Site for closeout of the monitoring requirements. As a result of the site visit evaluation along with confirmation from EBX that additional easement signs have been placed along the easement boundary, Ms. Merritt supports closing out the Site for any further monitoring and maintenance of the riparian vegetation and conservation easement. According to DWR files, the Grantee of this Site's conservation easement is the North Carolina Wildlife Habitat Foundation (NCWHF). By copy of this letter, the monitoring requirements at the subject Site have been met and DWR is releasing EBX from its financial assurance obligations under Performance Bond #SU60132 with Aspen American Insurance Company. According to the UMBI signed on November 10, 2008, the following Project Milestones have been met, and the corresponding credits shall be released: Task/Milestones 8) Monitoring Report #5: Approved by the DWR Credit 10% By copy of this correspondence DWR confirms that you have satisfied the above Task/Milestones for the above -referenced tract and 10% of your Neuse riparian buffer credits (0.1 x 217,930.68 ft2 = 21,793.07 W) and 10% of your nitrogen nutrient offset credits (0.1 x North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 • �m� /'� 919.707.9000 Arrington Bridge Phase 1 Site EBX October 29, 2019 73,884.52 lb-N = 7,388.45 lb-N) are now available to sell. Please update your credit ledgers accordingly. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Watershed. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective as of November 1, 2015. Please feel free to call Katie Merritt at (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, Katie Merritt 401 & Buffer Permitting Branch Cc : File Copy (Katie Merritt) Caitlan — Resource Environmental Solutions, LLC (via electronic mail) Gregory Erwin — North Carolina Wildlife Habitat Foundation (Erwin Oil Co, Inc; gregorynerwinoil.com; 919-210-3717) Page 2 of 2