HomeMy WebLinkAbout310789_Inspection_20191010Division of Water Resources
Facility Number O Division of Soil and Water Conservation
O Other Agency..
Type of Visit: 4E) Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: o ft lrrival Time: Departure Time: ® County: Region:
Farm Name: I1"1� - C6.e Vic, t L Owner Email:
Owner Name. Phone:
Mailing Address:
Physical Address:
Facility Contact: �VO2�lje `a✓G ndk44 Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feedei
Feeder to Finisl
Farrow to Weai
Farrow to Feed
Farrow to Finis
Gilts
Boars
Other
Uthcr
Latitude:
Phone: _
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
11-ayer
Non--
La er
Other
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No [ A ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
[:]Yes
[:]No L.,,'vA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
[:]Yes
[:]No A
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
dN ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
No ❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facili Number: - Date of Inspection: v 14 I
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard?
Structure 1
Identifier:
Spillway?:
Designed Freeboard (in):
CI $ 3
Observed Freeboard (in):
1-7—
Structure 2 Structure 3 Structure 4
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes
Io ❑ NA ❑ NE
❑ No Q?IA ❑ NE
Structure 5 Structure 6
❑ Yes [3No ❑ NA ❑ NE
❑ Yes Ea o ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑'1So ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes DrNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes EJ No ❑ NA ❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s)
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
[2-o
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
[ayes
❑ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
Fal o
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
L 0 Ko
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
[ Io
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
a No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
E50'No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements
❑Other:
21, Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
[;IQo
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑Yes
No
❑ NA
❑ NEE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
[:]No
❑ NA
Q- E
Page 2 of 3
21412015 Continued
Facili Number: Date of Inspection: 1
U
24. Did the facility fail to calibrate waste application equipment as required by the permit?
[:]Yes
[DIo
❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
['Flo
❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
No
❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No
[]<A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
[—]Yes �o ❑ NA ❑ NE
❑ Yes [2"N0 ❑ NA ❑ NE
❑ Yes E No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA []'f E
❑ Yes
E2 No
❑ Yes
0No
❑ Yes
VfNo
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawinus of facility to better explain situations (use additional Dages as necessarv).
Reviewer/Inspector Name: 5, " \Je t; P
Reviewer/Inspector Signature:
Page 3 of 3
Phone: Ito / 6721
Date: 10401 1
21412015