HomeMy WebLinkAbout310852_Inspection_20190917Division of Water Resources
Facility Number D - F 757 Z 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: I"1 I t t I I y Arrival Time: Departure Time: County:
Farm Name: C ,16 c D%'�'2LA �JQl(Xr_4 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
I INon-Layer
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Region:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes Io ❑ NA ❑ NE
[:]Yes [:]No [2,16 ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No I _f A ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? 0 ❑ Yes ❑ No IA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the wat� W ❑Yes Io ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of � J-- 21412015 Continued
Facili Number: - Date of Ins ection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [] Nc VNA
❑ NE
a. If yes, is waste level into the structural freeboard?Yes ❑ No ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?: ��L"L—
Designed Freeboard (in):
Observed Freeboard (in): --1)4r 34
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes []No ❑ NA ❑ NE
[:]Yes ❑ No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes E]"TNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes dNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need [—]Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [Z/No- ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s)
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes allo ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? Ea- eS [:]No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E3�<o ❑ NA ❑ NE
acres determination?
/�
17. Does the facility lack adequate acreage for land application?
❑ Yes Lj 1Vo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes E31No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes dNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists []Design ❑Maps ❑ Lease Agreements ❑Other:
211../ation ❑'1� eDoes record keeping need improvement? If yes, check the appropriate box below. es ❑ No ❑ NA ❑ NE
[y Waste Applicekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
Q Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ErNo ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 0'NE
Page 2 of 21412015 Continued
Facility Number: Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? Pq"�s ❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check es [:]No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels nn
13tdon-compliant sludge levels in any lagoon pp "J .1 co G- W
List structure(s) and date of first survey indicating non-compliance: % �l�iii ja}cCJ ' A/Q
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes �o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [D'NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
[DNo
❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[2No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
eNo
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
(Z No
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
[2Io
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
fKYes
Poo
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Ap r�"" � NCA� CJ (�1�1� A c &CN
V'�'14' *ur SkaX--'C — CDNp�iQv.c� t��i}� I\
Novo ("T1c4,4- -ftr 2a)0I Call
Vr�-et� c o_T\V4( -4;3 ✓ tcvts i S1 a S 2v IS ►o
fl0 0 b rCh;'A P'14 / Freeboar-J K Loe-Js
-- `N\-_ej (�'y6l
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
: \] � k— Phone: 1 ��I �, %Z. ( 5"
n 9 Date: I
1/4 015