Loading...
HomeMy WebLinkAboutNCG140325_Inspection Report_20191029ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director McDowell Concrete Supply LLC Attn: Patrick Boone Post Office Box 1147 Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality October 29, 2019 Subject: Compliance Evaluation Inspection Permit: NCG140000 Certificate of Coverage: NCG140325 McDowell County, North Carolina Dear Mr. Boone: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 17, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. ZSincSinc , Isaiah Reed, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E 0ifftf5A North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 n Hurw fir^^^^�^�"'" \OW'4' 828.296.4500 Compliance Inspection Report Permit: NCG140325 SOC: County: McDowell Region: Asheville Effective: 08/01/17 Expiration: 06/30/22 Owner: McDowell Concrete Supply LLC Effective: Expiration: Facility: McDowell Concrete Supply, LLC S Garden St Contact Person: Patrick Boone Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/17/2019 Entry Time: 09:45AM Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Marion NC 28752 Phone: 828-652-5721 Phone: Exit Time: 10:45AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge CDC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (Sep attachment summary) Page 1 of 3 Permit: NCG140325 Owner -Facility: McDowell Concrete Supply LLC Inspection Date: 10/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On October 17, 2019 this facility was inspected for compliance and to determine what progress has been made in response to the previously issued NOD. I met with Pat Boone on site and discussed permitting requirements. the permittee is directed to immediately begin efforts to meet all requirements outlined in the Notice of Deficiency. Additionally, it was observed on site that the potential for additional outfalls and process water treatment practices may be need on site. The permittee is directed to evaluate these areas and create the SWPPP accordingly. This facility will be re -inspected on or after December 11, 2019. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG140325 Owner -Facility: McDowell Concrete Supply LLC Inspection Date: 10/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ N ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ # Does the facility provide all necessary secondary containment? ❑ E ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? El 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? N ❑ ❑ # Does the facility provide and document Employee Training? N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ # Is the Plan reviewed and updated annually? NQ ❑ # Does the Plan include a Stormwater Facility Inspection Program? El E ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No MANE- Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ El Comment: See summary for more information. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ El on Comment: See Summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 El ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ El 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ Comment Page 3 of 3