HomeMy WebLinkAboutNCG140325_Inspection Report_20191029ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
McDowell Concrete Supply LLC
Attn: Patrick Boone
Post Office Box 1147
Marion, North Carolina 28752
NORTH CAROLINA
Environmental Quality
October 29, 2019
Subject: Compliance Evaluation Inspection
Permit: NCG140000
Certificate of Coverage: NCG140325
McDowell County, North Carolina
Dear Mr. Boone:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on October 17, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
ZSincSinc ,
Isaiah Reed, CEPSCI, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
D_E 0ifftf5A North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
n Hurw
fir^^^^�^�"'" \OW'4' 828.296.4500
Compliance Inspection Report
Permit: NCG140325
SOC:
County: McDowell
Region: Asheville
Effective: 08/01/17 Expiration: 06/30/22 Owner: McDowell Concrete Supply LLC
Effective: Expiration: Facility: McDowell Concrete Supply, LLC
S Garden St
Contact Person: Patrick Boone Title:
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 10/17/2019 Entry Time: 09:45AM
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification:
Marion NC 28752
Phone: 828-652-5721
Phone:
Exit Time: 10:45AM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge CDC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(Sep attachment summary)
Page 1 of 3
Permit: NCG140325 Owner -Facility: McDowell Concrete Supply LLC
Inspection Date: 10/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On October 17, 2019 this facility was inspected for compliance and to determine what progress has been made in response
to the previously issued NOD. I met with Pat Boone on site and discussed permitting requirements. the permittee is directed
to immediately begin efforts to meet all requirements outlined in the Notice of Deficiency.
Additionally, it was observed on site that the potential for additional outfalls and process water treatment practices may be
need on site. The permittee is directed to evaluate these areas and create the SWPPP accordingly.
This facility will be re -inspected on or after December 11, 2019. If the above items have not been addressed, further action
will be taken.
If you have any questions, please contact this office at (828) 296-4614.
Page 2 of 3
Permit: NCG140325 Owner -Facility: McDowell Concrete Supply LLC
Inspection Date: 10/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0
❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
0 ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
E
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
N ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
# Does the facility provide all necessary secondary containment?
❑
E ❑ ❑
# Does the Plan include a BMP summary?
❑
0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
El
0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
N ❑ ❑
# Does the facility provide and document Employee Training?
N ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑
# Is the Plan reviewed and updated annually?
NQ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
El
E ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
N ❑ ❑
Comment: See summary for more information
Qualitative Monitoring
Yes No MANE-
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ El
Comment: See summary for more information.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ El on
Comment: See Summary for more information.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑ 0 El ❑
# Were all outfalls observed during the inspection?
0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑ El 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑ 0 ❑
Comment
Page 3 of 3